View Properties

PCB 80-051 08/21/80 Opinion and Order
VILLAGE OF BENSENVILLE v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-15282
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, November 29, 2001 10:25:56 AM CST
Thursday, November 29, 2001 01:06:06 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 21, 1980VILLAGE OF BENSENVILLE, ) Petitioner,v.
  • ) PCB 80—51
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • The average daily demand to the Village~ssystem is 2.2
million gallons a day (mgd); the peak demand is approximately 3to 3.5 mgd.
  • The
2Village now seeks variance in order to qualify for constructionand operating permits for water main extensions and for additionalconstruction and initial operating permits for Wells 6 and 7, andalso to continue operating Wells 2, 3, 4.
  • The Agency’s analysis for gross alpha particle activity of a
sample taken from the Village’s distribution system March 28,1979 showed activity ...
Allowed
schroedk
Adobe Portable Document Format (.pdf) - application/pdf
PCB 80-051 082180 Opinion and Order.pdf
4
471231
No
Appears In: PCB 80-051
Preferred Version: PCB 80-051 08/21/80 Opinion and Order