View Properties

R02-003 11/15/01 Order
IN THE MATTER OF: WASTEWATER PRETREATMENT UPDATE, USEPA AMENDMENTS (January 1, 2001 through June 30, 2001)
The Board granted expedited consideration of the federal amendments of October 3, 2001, by opening a new docket, R02-9, to consider that federal action. The Board declined to introduce the subject matter of the October 3, 2001 federal amendments into this docket, R02-3.
Handle: Document-15154
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, November 20, 2001 12:42:33 PM CST
Friday, December 14, 2001 01:12:01 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 15, 2001IN THE MATTER OF: )) WASTEWATER PRETREATMENT ) R02-3UPDATE, USEPA AMENDMENTS ) (Identical-in-Substance(January 1, 2001 through June 30, 2001) ) Rulemaking - Public Water Supply)Proposed Rule.
  • Those federal amendments are
intended to implement the federal Project eXellence and Leadership (Project XL).
  • The joint
motion requested that the Board incorporate the October 3, 2001 federal amendments into thewastewater pretreatment amendments proposed by the Board in Wastewater PretreatmentUpdate, USEPA Amendments (January 1, 2001 through June 30, 2001), R02-3...
Allowed
wilsonb
Adobe Portable Document Format (.pdf) - application/pdf
02-003r111501.pdf
4
10866
No
Appears In: R 02-003
Preferred Version: R02-003 11/15/01 Order