| PCB 80-147 11/20/80 Opinion and Order |
| DIAMOND DEVELOPMENT CO. and CITY OF ALTAMONT v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY |
| |
| |
Handle:
|
Document-15072
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Wednesday, November 7, 2001 12:48:38 PM CST |
| Wednesday, November 7, 2001 12:59:40 PM CST |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
November 20, 1980DIAMOND DEVELOPMENT CO.that during much of 1978 and 1979 the plant was also hydraulicallyoverloaded receiving flows in excess of its 133,000 gpd design maximum.- The City states that at the time of construction
2and initial operation of the sewer, that it had believed no permitswere necessary for connections of that kind.- Diamond asserts that, in the interim, its discharge will
cause no additional harm to the environment (Pet.- No additional connections may be made.
- 2. Within 60 days of the date of this Order, Diamond shall
install, in each apartment unit, plastic dams in each water closetand water ... |
| Allowed |
| schroedk |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| PCB 80-147 112080 Opinion and Order.pdf |
| |
| 4 |
| 373508 |
| |
| |
| No |
Appears In:
|
PCB 80-147
|
Preferred Version:
|
PCB 80-147 11/20/80 Opinion and Order
|