(1 FRI<’S OFFICEBEFORE THE LLLLNOIS POLLUTION CONTROL BOARD !.\UG 09 ZOOl~i~IL OF ILLINOIST’CIIutiOn Control BoardIN THE MATTER OF: ))) PROVISIONAL VARIANCES FROM ) WATER TEMPERATURE STANDARDS:)PROPOSED NEW 35111.
I am currently the Nuclear Generation Support
Environmental Manager forthe Mid-West Regional Operating Group ofExelonCorporation.
The MWROG includes six nuclear generating stations: