  • 1 BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOIS234 IN THE MATTER OF: )) 5 NATURAL GAS-FIRED, PEAK-LOAD ) PCB No.
  • 10 169
11 Zingle Exhibit No.
  • Zingle, so we'll start out with Zingle Exhibit 5,
21 and that will be the document entitled "Typical Daily22 Load Curve" for Reliant Energy.
  • 17 MS.
  • ZINGLE: Okay.
  • They may all shift to
7 combined-cycle.