  • 1
1 BEFORE THE POLLUTION CONTROL BOARDOF THE STATE OF ILLINOIS23 IN THE MATTER OF: )) 4 NATURAL GAS-FIRED, PEAK-LOAD ) R01-10ELECTRICAL POWER GENERATING ) 5 FACILITIES (PEAKER PLANTS).
  • )
6789 The following is a transcript of proceedings10 from the hearing held in the above-entitled matter,11 taken stenographically by ROSEMARIE LAMANTIA, CSR, a12 notary public within and for the County of Cook and13 State of Illinois, before AMY JACKSON, Hearing Officer,14 at 100 West Randolph Street, Assembly Hall Auditorium,15 Chicago, Illinois, on the 23rd day of August, 2000,16 A.D., scheduled to commenc...