View Properties

Part 170
Procedures For Coordinated Permit Review
Handle: Document-11876
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, April 18, 2001 03:08:37 PM CDT
Friday, December 12, 2014 08:37:12 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Monday, November 30, 2015 12:00:02 AM CST
Locked By:
  • 35 ILLINOIS ADMINISTRATIVE CODE CH.
  • Rev.
  • Stat.
  • 1981, ch.
  • 111½, par.
  • II, SEC.170.102
SUBTITLE ASection 170.102 DefinitionThe Coordinated Permit Review is the procedure the Agency shall use to conduct a concurrent,multimedia review of projects which require Agency permits. 1) For purposes of the Division of Air Pollution Control, a significantproject is: a new facility; a modification, replacement or reconstruction ofan existing facility; or the addition of controls to an existing facility forwhich the uncontrolled emissions:A) Will be 100 or more tons per year for any contaminant, orB) Will include any hazardous or toxic pollutants. 35 ILLINOIS ADMINI...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
Part 170.pdf
4
26025
No
Appears In: Chapter II
Preferred Version: PART 170 - PROCEDURES FOR COORDINATED PERMIT REVIEW