View Properties

AS 96-001 05/02/96 Opinion and Order
IN THE MATTER OF: PETITION OF ILLINOIS POWER COMPANY (BALDWIN POWER PLANT) FOR ADJUSTED STANDARD FROM 35 ILL. ADM. CODE 302.208 AND 35 ILL. ADM. CODE 304.105 REGARDING THE PARAMETER BORON1
Handle: Document-11618
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 16, 2001 06:38:00 PM CDT
Thursday, September 23, 2004 02:19:06 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
May 2, 1996IN THE MATTER OF: )) PETITION OF ILLINOIS POWER COMPANY ) AS 96-1(BALDWIN POWER PLANT) FOR ADJUSTED ) (Adjusted Standard-Water)STANDARD FROM 35 ILL.
  • The Agency
believes that Illinois Power’s proposed adjusted standard is very well supported by the StateWater Survey’s excellent study and recommends that the Board adopt the proposed language.
  • The Plant, including its cooling lake and ash pond facilities, occupies parts of
Township 4S, Range 7W in Randolph County and Township 3S, Range 7W in St.
  • Water is removed from the Kaskaskia River at the river intake point
and ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
S96001D.PDF
4
300730
No
Appears In: AS 95-001
Preferred Version: AS 96-001 05/02/96 Opinion and Order