View Properties

R13-18,091013 Pc# 4 supplemental
Handle: Document-81522
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Wednesday, September 11, 2013 09:54:32 AM CDT
Thursday, September 26, 2013 01:03:58 PM CDT
Modified By:
Locked By:
  • 1 Includes emissions during bulk tanker loading and in the interval between tanker deliveries
zDripless Nozzles, low permeation hoses, continuous pressure monitoring3 Included with ARID processor1 Capital equipment purchase and "shared savings business model" availables Need to confirm with field testlng; savings= f (RVP, Temp, V/ L, GDF Flow Profile) REcervscCLERK:§OFFICESEP 10 2013STATE OF ILLINOIS,.ollutron Control Board6 Non-Road emissions generated during refueling ofgas cans, motorcycles, boats, snowmobiles; ORVR will never be used on these tanks
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
R13-18,091013 Pc# 4 supplemental.pdf
No
1
406741
No
Appears In: R2013-018
Preferred Version: R13-18,091013 Pc# 4 supplemental