View Properties

PCB 09-097 Order 072309
Handle: Document-65875
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Monday, July 27, 2009 10:32:16 AM CDT
Monday, July 27, 2009 10:32:24 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 23, 2009AMEREN ENERGY GENERATINGCOMPANY and ELGIN ENERGY CENTER,Petitioners,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Pet.
  • at 3-8.
  • Ameren
challenges the inclusion of these conditions and asks the Board to stay their effect untilultimately ruling on the merits.
  • at 3, see Exh. 2. Exhibit 2 to the petition is a “redlined” version of the permit that indicates
the conditions or parts of the conditions Ameren seeks to stay. In Community Landfill Co. and City of Morris v. IEPA, PCB 01-48, 01-49, slip op. 2. The Board grants the requested partial stay and permit conditions 5.6.2, 5.7.2(b), 5.9.2,5.10.2, 7.1.3(f), 7.1.3 (f)(...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 09-097 Order 072309.pdf
No
1
25937
No
Appears In: PCB 09-097
Preferred Version: PCB 09-097 Order 072309.pdf