View Properties

PCB 09-092 Order 061809
Handle: Document-65537
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Friday, June 19, 2009 03:39:06 PM CDT
Friday, June 19, 2009 03:39:15 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 18, 2009DYNEGY MIDWEST GENERATION, INC.
  • Pet.
  • at 3-9.
  • Dynegy also requests that the Board
grant a partial stay of the CAAPP permit by staying portions of specified conditions.
  • 2.
  • Section 101.500(d) of the Board’s procedural rules provides that, “[w]ithin 14
days after service of a motion, a party may file a response to the motion. The Board has reviewed Dynegy’s request for a partial stay and Dynegy’s Exhibit2, which is entitled “”Redlined Version of the Permit Through Section 8.” See Pet., Exh. IT IS SO ORDERED.I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board,certify that the Board adopted the above orde...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 09-092 Order 061809.pdf
No
1
26263
No
Appears In: PCB 09-092
Preferred Version: PCB 09-092 Order 061809.pdf