View Properties

PCB 07-083 Order 03/15/07
Handle: Document-56597
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Wednesday, March 21, 2007 02:30:32 PM CDT
Wednesday, March 21, 2007 02:34:09 PM CDT
Modified By: Brown, Don (User-14, brownd:DocuShare)DS
Saturday, December 30, 1899 12:00:00 AM CST
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 15, 2007PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • EDELSTEIN WATERWORKS CO-OP, an
Illinois not-for-profit corporation,Respondent.
  • See 415 ILCS 5/31 (2004); 35 Ill.
  • See 35 Ill.
  • Adm.
  • Code 103.204(c), (f),
103.212(c). A respondent’s failure to file an answer to a complaint within 60 days afterreceiving the complaint may have severe consequences. See 415ILCS 5/33(c), 42(h) (2004). Specifically, the Board considers the Section 33(c) factors indetermining, first, what to order the respondent to do to correct an on-going violation, if any,and, second, whether to order the respondent to pay a civil penalty. IT IS SO ORDERED. 3I, D...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 07-083 Order 031507.pdf
No
4
27369
No
Appears In: PCB 07-083
Preferred Version: PCB 07-083 Order 031507.pdf