| PCB 06-071 Order 11/17/05 |
| |
| |
| |
Handle:
|
Document-50028
|
Owner:
|
Brown, Don (User-14, brownd:DocuShare)DS
|
| Tuesday, November 29, 2005 03:12:34 PM CST |
| Tuesday, November 29, 2005 03:22:18 PM CST |
Modified By:
|
Brown, Don (User-14, brownd:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
November 17, 2005DYNEGY MIDWEST GENERATION, INC.105.302(e).- Dynegy is challenging numerous conditions of the permit.
- Dynegy has the burden of proof.
- 415 ILCS 5/40.2(a) (2004); see also 35 Ill. 35 Ill. Adm. Code 105.302(f). If the Agency wishes to seek additional time to file the record, it
must file a request for extension before the date on which the record is due to be filed. |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| PCB 06-071 Order 111705.pdf |
| |
| 4 |
| 25571 |
| |
| |
| No |
Appears In:
|
PCB 06-071
|
Preferred Version:
|
PCB 06-071 Order 111705.pdf
|