Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
The Agency approved
reimbursement of requested corrective action costs, with modifications, for Russell Oil’s leakingunderground petroleum storage tank facility located at 326 East Poplar Street, Harrisburg, SalineCounty. See415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on December ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf