View Properties

PCB 03-224 Order 07/10/03
PEOPLE OF THE STATE OF ILLINOIS v. VILLAGE OF SIMS, an Illinois municipal corporation, FOLLOWELL CONSTRUCTION COMPANY, INC., an Illinois corporation, and LAMAC ENGINEERING COMPANY, an Illinois corporation
Upon receipt of a proposed stipulation and settlement agreement and an agreed motion to request relief from the hearing requirement in this land enforcement action involving a Wayne County facility, the Board ordered publication of the required newspaper notice.
Handle: Document-39549
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Thursday, July 17, 2003 03:02:03 PM CDT
Friday, August 15, 2003 09:30:46 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 10, 2003PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • VILLAGE OF SIMS, an Illinois municipal
corporation, FOLLOWELLCONSTRUCTION COMPANY, INC., anIllinois corporation, and LAMACENGINEERING COMPANY, an Illinoiscorporation,Respondents.
  • The Village, which is located in Wayne County, owns and operates a public water supply
serving approximately 421 consumers through 161 direct connections.
  • On June 19, 2003, the Board directed that the
Clerk cause the required notice of these filings.
  • Under the proposed
2settlement, Lamac Engineering does not admit the alleged violations and agrees to pay a civilpenalty of $5,000.
  • See 415 ILCS 5/31...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 03-224 Order 071003.pdf
4
11493
No
Appears In: PCB 03-224
Preferred Version: PCB 03-224 Order 07/10/03