BEFORE THE POLLUTION CONTROL BOARDOF THE STATE OF ILLINOIS Mi~y2 & 2003STATE OFDICKEY OIL COMPANY, ) POl/U~j0flCOfltro7~dPetitioner, )) vs.
The SCWP and budget satisfy the requirements ofthe Illinois
Environmental Protection Act, 415 ILCS 5/1 et seq., and the regulationspromulgated thereunder, in that they were prepared and fully implemented inaccordance with generally accepted engineering practices and their conclusionswere consistent with the information obtained while implementing the Plan.
More
specifically: (1).
The Agency’s determination that four (4) soil borings and eight
...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf