Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the Agency
approval of reimbursement of corrective action costs, with deductions, for Earl’s Marathon’sleaking underground petroleum storage tank facility located at 8702 South Roberts Road,Hickory Hills, Cook County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on May...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf