Because the postmark date of the joint request is within the time for
filing, the joint request was timely filed.
The
Agency approved reimbursement of corrective action plan costs, with modifications, for RoyerOil Company’s leaking underground petroleum storage tank facility located at 200 South Third,Greenville, Bond County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on Apr...
Allowed