Because the postmark date of the joint request is within the time for
filing, the joint request was timely filed.
The
Agency approved corrective action costs, with modifications, for Royer Oil Company’s leakingunderground petroleum storage tank facility located at 200 South Third, Greenville, BondCounty. See 415ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on April 17, 2003, by a vote...