The Environmental Protection Agency contacted the engineer to
learn the reason for the delay.
We could have anticipated
that adverse weather conditions at this time of year might make itdifficult to obtain the necessary soil borings within the timeallotted.
The fact that another disposal area is
located 20 miles away would not necessarily mean that Jerry Fryewould have access or be allowed to deposit refuse at that site or6— 611 —2—that he would have the capability of maintaining the service tohis 11,000 households if we deny this extension of time.