View Properties

PCB 72-466 09/12/74 Order
ENVIRONMENTAL PROTECTION AGENCY v. RAIL-TO-WATER TRANSFER COMPANY
Handle: Document-36337
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, February 26, 2003 01:39:25 PM CST
Wednesday, April 23, 2003 11:35:29 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • n S terrJDeL S 9T4 luiton dent c~doard handed
do n its ~pini~on~nh dicer in e~ease P~B 2 ±66 On ourowr ~otron e have tocay ~ewr±cten one paragrapu of that ~pinion.
  • ~The Agency attempted to introduce
emission factors taken from AP-42, the ~Compilationof Air Pollution Emission Factors11, AgencyExhibit l9A to show that tne process of unload-ing, conveying and loading meal at the RTW facilitywas in violation of Rule 3—3~llllimits out such evidencewas not allo~edInto the record by the hearing officer11Agency brief, page 27) Testimony was effered by bothsides regarding this issue ~e believe that the hearingofficer ruled correctly, because the Agency did notadequately demon...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
271399
No
Appears In: PCB 73-466
Preferred Version: PCB 72-466 09/12/74 Order