PCB 73-113 12/05/74 Opinion and Order
ENVIRONMENTAL PROTECTION AGENCY v. UNION ELECTRIC COMPANY
Handle: Document-35694
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, February 19, 2003 11:26:41 AM CST
Wednesday, April 23, 2003 03:12:01 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 5, 1974 ) ENVIRONMENTAL PROTECTION AGENCY ))) v.
  • ) PCB 73-113
)) UNION ELECTRIC COMPANY ))) MR.
  • Respondent is charged with such violations
from on or before July 1, 1970 and continuing through the dateof the filing of the Amended Complaint.
  • 14—587
  • 2-
3.
  • The construction of the Venice Plant was completed in 1950,
at which time the plant had eight pulverized coal boilers, eachof which discharged into its separate stack and all of whichstacks were equipped with electrostatic precipitators with adesign...