View Properties

R 72-018 10/17/74 Interim Order
IN THE MATTER OF GRAIN HANDLING REGULATIONS
Handle: Document-35469
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, February 13, 2003 11:43:50 AM CST
Thursday, August 18, 2005 08:04:26 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 17, 1974IN THE MATTER OF 72 18GRAIN HANDLING REGULATIONS ~ PCB R - INTERIM ORDER OF THE BOARD (by Dr.
  • During the R72-18 proceeding in 1973 the Board established
September 1, 1974, as the date by which operating permits wererequired for grain handling and conditioning operations (8 PCB 307and 9 PCB 47-49).
  • This date was extended beyond September 1, 1974,
pending review and final action in the R72-l8, which is expectedsoon.
  • Therefore, the construction permit requirements under Rule
103(a) (1) of Chapter 2, Air Pollution Regulations, are hereby suspended as they apply ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0004.pdf
4
267724
No
Appears In: R 72-018
Preferred Version: R72-018 10/17/74 Interim Order