PCB 75-352 11/06/75 Opinion and Order
SOUTHERN ILLINOIS POWER COOPERATIVE v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-34683
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, February 4, 2003 12:58:29 PM CST
Friday, April 25, 2003 12:34:25 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 6, 1975SOUTHERN ILLINOIS POWER COOPERATIVE, ) Petitioner, ) v.
  • ) PCB 75—352
ENVIRONMENTAL PROTECTION AGENCY,Respondent.
  • Construction of a fourth unit, with a rated capacity of 175 MW,
is planned for the fall of 1975, with completion scheduledfor June, 1978.
  • In
January, 1975, however, the Federal standard was revised toexempt new sources from the 0.70 lb/b6 BTU requirement whensuch source is burning at least 25 by weight coal refuse(40 FR No.
  • An environmental analysis prepared for SIPCO revealed
similarly low concentrations.
  • 19— 256
—3--ORDERVariance i...
Allowed