  • ILLINOIS POLLUTION CONTROL BOARD
October 9, i:~’sE.
  • I.
  • DV PONT DE NEMOEJRS & COMPANY,
Petitioner,vs.
  • Since no suitable test method
was available, Petitioner had to develop an entirely new testprocedure.
  • Petitioner has not requested relief from a substantive
emission standard but rather from a procedural requirementof the permit system.
  • Such a variance request would require a most
thorough discussion of all of the various methods which mighthe available for determining the extent of Petitioner1s emissions. This Opinion is issued to provide some direction to the partiesas they prepare to file their additional information with the Board.