wastewater to the sewer would be 4,000 gallons per day with a peakflow of 8,000 gallons per day resulting in an average of 12 poundsof SOD and 20 pounds of suspended solids per day discharged to theSTP.
The pool is to be used by residents of the Village of Addison;
21—485 —2—therefore, ho new loading would be contributed to the STP.
The Agency in its Recommendation indicates that the STP plays
a part in the degradation of Salt Creek, the waterway to which itdischarges its effluent.
(B...