21 —261 —2—allowing an effluent standard of 10/12 mg/i BOD/SS.
Vernon to meet an average BOD of 4.2 mg/i
and SS of 22.3 mg/i.
based upon what was claimed to be prior performance.
Vernon obtain a construction permit from
the Agency.
However, without the instant variance, the Agency may
not issue a construction permit. Vernon be granted variance from Rule 962(a) ofChapter Three of the Water Regulations with respect to BOD5,Suspended Solids, and phosphorus provided that Mt.
Allowed