View Properties

PCB 03-074 Opinion and Order 01/23/03
PEOPLE OF THE STATE OF ILLINOIS v. CITY OF GEORGETOWN, an Illinois municipal corporation, and T.K. FLEMING CONSTRUCTION, INC., an llinois corporation
In this public water supply enforcement action concerning a Vermilion County facility, the Board granted relief from the hearing requirement of Section 31(c)(1) of the Environmental Protection Act (415 ILCS 5/31(c)(1) (2002)), and accepted a final stipulation and settlement agreement for the City of Georgetown (Georgetown) only. Georgetown was ordered to pay a civil penalty of $500. Georgetown was ordered to cease and desist from further violations. This matter shall proceed against the remaining respondent, T.K. Fleming Construction, Inc.
Handle: Document-34168
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Wednesday, January 29, 2003 10:29:16 AM CST
Wednesday, January 29, 2003 04:40:29 PM CST
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
January 23, 2003PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • CITY OF GEORGETOWN, an Illinois
municipal corporation, and T.K.
  • FLEMING
CONSTRUCTION, INC., an Illinoiscorporation,Respondent.
  • Adm.
  • Code 103.300(a).
  • The Board
provided notice of the stipulation, proposed settlement, and request for relief. Section 103.302 also requires that the parties stipulate to factscalled for by Section 33(c) of the Act (415 ILCS 5/33(c) (2002)). The People and the City ofGeorgetown have satisfied Section 103.302. The case number, case name, andthe City of Georgetown’s social security number or federal employeridentification number must be included o...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 03-074 Opinion and Order 012303.pdf
4
14193
No
Appears In: PCB 03-074
Preferred Version: PCB 03-074 Opinion and Order 01/23/03