View Properties

PCB 76-257 Opinion and Order 03/28/77
DE SOTO, INC. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-33241
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, January 17, 2003 01:26:35 PM CST
Friday, January 17, 2003 01:27:19 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 28, 1977DE SOTO, INC., Petitioner,v.
  • ) PCB 76—257
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • PCB
296).
  • De Soto, Inc.
  • v.
  • EPA, PCB 75—449, 19 Iii PCB 781 (1976).
The nature and extent of DeSoto’s operations are detailed in thosecases and need not be repeated here. DeSoto also anticipatedthat, because of poor winter weather and the several holidays duringthe work period, an additional two to three weeks would be requiredto complete the necessary dredging. In an Interim Order entered Dec. 16,1977, the Board granted DeSoto eight weeks for further analysis andthe submission of additional documents. As noted in PCB ...