Midwest~sWWTP, which was constructed and put into operation
in 1971, includes an extended aeration activated sludge processfollowed by chiorination~ There are 3 activated sludge unitshaving a 244,000 gallon capacity with a liquid depth of about 10feet.
11002909 which authorized discharges from Outfalls 001,
002, 003, and 004.
(See: Exhibit A). It is contemplated that the existing WWTP
will be initially expanded to handle a flow rate of 0.5 milliongallons per day (MGD) and 5,000 pounds per day of BOD. Ir crder to expird the aeratiot ast1s 1y waking the basins4 feet deeper the Petitioner...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf