View Properties

PCB 85-083 Interim Order 10/10/85
MARATHON PETROLEUM CO. v. ILLINOIS ENVIRONMENTAL PROL1ECTION AGENCY
Handle: Document-28186
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, October 29, 2002 08:52:04 AM CST
Tuesday, October 29, 2002 08:53:09 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 10, 1985MARATHON PETROLEUM CO.,Petitioner,v.
  • ) PCB 85—83
ILLiNOIS ENVIRONMENTALPROL1ECTION AGENCY, ) Respondent.
  • rrhe Board must address two issues flowing from this Order.
  • The previous
tilings do not even mention federal requirements, rendering thepetition inadequate.
  • To insure a meaningful public hearing, however,
the Agency’s Recommendation should be available in advance ofhearing.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
259200
No
Appears In: PCB 85-083
Preferred Version: PCB 85-083 Interim Order 10/10/85