View Properties

PCB 85-164 Order 01/09/86
WESTERN ILLINOIS POWER COOPERATIVE, INC. v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-28101
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, October 28, 2002 11:35:35 AM CST
Monday, October 28, 2002 11:36:02 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
January 9, 1986‘QESTERN ILLINOIS PO~ERCOOPERATIVE, INC.,Petitioner,v.
  • ) PCB 85—164
ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Respondent.
  • (Western).
  • Western indicates that it is
“engaged in obtaining additional engineering studies” and that ithas filed a rulemaking petition (R85—26), the resolution of whichcould moot this permit appeal proceeding.
  • The additional engineering studies, when completed, would not be
admissible in this permit appeal proceeding in any case sincethey would not have been before the Illinois EnvironmentalProtection Agency at the time of its permit decision.
  • The motion
for continuance is, ther...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0002.pdf
4
190606
No
Appears In: PCB 85-164
Preferred Version: PCB 85-164 Order 01/09/86