Elmhurst’s Public Works Department repaired this section ofsewer, the Petitioner decided that a large section of the 42 inchmain needed to be inspected for further defects.
Consequently, the City of Elmhurst has
contended that there is no feasible alternative to bypassingsewage to Salt Creek via a storm sewer during the inspection ofthe sewer line.
The Agency notes that the
creek’s average flow was 3.9 million gallons per hour with anaverage dissolved oxygen concentration of 8.3 mg/l ...
Allowed
SykutaJ
Adobe Portable Document Format (.pdf) - application/pdf