View Properties

PCB 86-169 Opinion and Order 10/09/86
CITY OF ELMHURST V. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-27099
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, July 31, 2002 02:49:32 PM CDT
Friday, December 20, 2002 08:37:01 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 9, 1986CITY OF ELMHURST,Petitioner,V.
  • ) PCB 86—169
ILLINOIS ENVIRONMENTALPROTECTION AGENCY, ) Respondent.
  • After
Elmhurst’s Public Works Department repaired this section ofsewer, the Petitioner decided that a large section of the 42 inchmain needed to be inspected for further defects.
  • Consequently, the City of Elmhurst has
contended that there is no feasible alternative to bypassingsewage to Salt Creek via a storm sewer during the inspection ofthe sewer line.
  • The Agency notes that the
creek’s average flow was 3.9 million gallons per hour with anaverage dissolved oxygen concentration of 8.3 mg/l ...
Allowed
SykutaJ
Adobe Portable Document Format (.pdf) - application/pdf
15.pdf
4
979917
No
Appears In: PCB 86-169
Preferred Version: PCB 86-169 Opinion and Order 10/09/86