to perform a thermal study of a section of the Calumet River, inconjunction with Acme Steel Company, a neighboring steel facilitythat has a similar permit appeal pending before the Board.
Finally,
LTV states that should the “third airport” be developed in theproposed Lake Calumet area, the facility that is the subject ofthis appeal would probably be demolished, rendering this appealmoot.
The Board
will not grant this request, partic...
Allowed
scantmp5
Adobe Portable Document Format (.pdf) - application/pdf