The Agency filed its variance recommendation (Rec.) onNovember 17, 1994.
(Petition at p.
2.) All but
one of these stations is in compliance with the Stage IIrequirements.
Stage II vapor recovery equipment is designed to capture
VOM emissions during the fueling of vehicle tanks. UNO—VEN contends that installing Stage II equipment prior tothe closing and razing of the existing station woul...
Allowed
scantmp6
Adobe Portable Document Format (.pdf) - application/pdf