On May 19, 2009, Ameren Energy Generating Company (Ameren) filed a proposal
(Prop.) for site-specific rulemaking pursuant to Sections 27 and 28 of the Environmental
Protection Act (Act) (415 ILCS 5/27, 28 (2006)), Section 8 of the Illinois Groundwater
Protection Act (415 ILCS 55/8 (2006)), and Sections 102.208 and 102.210 of the Board’s
procedural rules (35 Ill. Adm. Code 102.208, 102.210). Ameren included a Statement of
Reasons (SR) and a Technical Support Document (TSD) in its filing.
Ameren proposes a new subchapter in the Board’s waste disposal regulations to address
the closure of surface impoundments. Specifically, Ameren seeks the adoption of regulations
through which it can close Ash Pond D at its Hutsonville Power Station (Station) near
Hutsonville, Crawford County.
Ameren also filed a motion requesting that the Board waive the requirement that the
petition include the signatures of at least 200 persons (Mot. Waive) (
see
415 ILCS 5/28 (2006);
35 Ill. Adm. Code 102.202(g)) and a motion requesting that the Board expedite review of the
proposal (Mot. Exp.) (
see
35 Ill. Adm. Code 101.512). On June 1, 2009, the Illinois
Environmental Protection Agency (Agency) filed a response to the motion for expedited review
(Resp.).On June 3, 2009, Ameren filed a motion for leave to file a reply in support of its motion
for expedited review (Mot. Leave), accompanied by its reply (Reply).
Below, the Board first briefly addresses two preliminary matters before reviewing
Ameren’s proposal. The Board then summarizes the filings regarding Ameren’s motion for
expedited review. In the discussion following those summaries, the Board accepts Ameren’s
proposal for hearing and denies the motion for expedited review.
PRELIMINARY MATTERS
Motion to Waive Signature Requirement
Ameren states that, because current Board regulations do not address closure of surface
impoundments or ash ponds at coal-fired electric generating plants, it proposes a site-specific
rule adding a new subchapter to the Board’s existing waste disposal rules. Mot. Waive at 1.
Ameren further states that its proposed site-specific rule specifically provides for closure of Ash
Pond D at its Hutsonville Power Station.
Id
. Ameren claims that, because the scope of its
2
proposal is limited to that station, obtaining “200 signatures would present an added expense that
is burdensome and unnecessary.”
Id
. at 2. Accordingly, Ameren requests that the Board waive
the requirement that it submit the signatures of at least 200 persons with its rulemaking proposal.
Id
. at 1;
see
415 ILCS 5/28(a) (2006); 35 Ill. Adm. Code 102.202(g).
Section 101.500(d) of the Board’s procedural rules provides in pertinent part that,
“[w]ithin 14 days after service of a motion, a party may file a response to the motion. If no
response is filed, the party will be deemed to have waived objection to the granting of the
motion, but the waiver of objection does not bind the Board or the hearing officer in its
disposition of the motion.” 35 Ill. Adm. Code 101.500(d). The Board has received no response
to Ameren’s motion to waive signature requirements. Based on its review of the Ameren’s
motion, and in the absence of any response, the Board grants the motion and waives the
requirements that Ameren submit the signatures of 200 persons with its proposal.
Ameren’s Motion for Leave to File Reply
Ameren’s motion first notes that, “[u]nder the Board’s procedural rules, a moving party is
not entitled to file a reply, except as permitted by the Board or Hearing Officer to prevent
material prejudice.” Mot. Leave at 1, citing 35 Ill. Adm. Code 101.500(e). Ameren continues by
claiming that the Agency’s response “mischaracterizes several items” and that it is therefore
“imperative” that the Board grant the motion for leave and consider the substance of the reply.
Mot. Leave at 1. Ameren requests that the Board grant its motion and accept the reply “to
prevent material prejudice that would result if the Response was allowed to stand containing
such misrepresentations.”
Id
. at 2. Stating that it has negotiated with the Agency for many years
on closing Pond D, Ameren argues that the Agency and the public would not be prejudiced if the
Board grants the motion but that it “would suffer irreparable harm” if the motion is denied.
Id
. at
2.
As noted above, Section 101.500(d) of the Board’s procedural rules provides in pertinent
part that,
[w]ithin 14 days after service of a motion, a party may file a response to the
motion. If no response is filed, the party will be deemed to have waived objection
to the granting of the motion, but the waiver of objection does not bind the Board
or the hearing officer in its disposition of the motion. Unless undue delay or
material prejudice would result, neither the Board nor the hearing officer will
grant any motion before expiration of the 14 day response period except in
deadline driven proceedings where no waiver has been filed. 35 Ill. Adm. Code
101.500(d).
As Ameren filed its motion for leave on June 3, 2009, the Agency’s 14 day response deadline
expired June 17, 2009.
See
35 Ill. Adm. Code 101.300(b)(2) (“mailbox rule”). In order for the
Board to decide this motion at its regularly-scheduled meeting today, and in order to avoid undue
delay in this proceeding, the Board grants Ameren’s motion for leave to file a reply in support of
its motion for expedited review and considers that reply below.
3
AMEREN’S PROPOSAL
Ameren generates electricity at the Station, which is located on a site approximately 205
acres in size along the Wabash River near Hutsonville. SR at 7;
see
TSD at 2 (Site Location
Map). The Station employs 58 persons. SR at 8. Electric generating equipment at the Station
“includes two coal-fired boilers for steam production and steam-driven turbine generators.”
Id.
at 7. The Station also includes a circulating water system that draws water from the Wabash
River for use in the boiler and turbine equipment.
Id
. The system removes ash, a byproduct of
coal combustion, from the boilers and then sluices it through pipelines to an ash impoundment
system.
Id
. at 8. That system consists of a series of ponds in which solids settle and sluicewater
“decants from pond to pond before discharging to the Wabash River via an NPDES [National
Pollutant Discharge Elimination System] permitted outfall.”
Id
.;
see
TSD at 4 (Site Plan), 14
(Background). The surface impoundment system accepts coal combustion waste including both
bottom ash and fly ash, low-volume waste consisting of demineralizers and boiler blow-down,
and sanitary wastewater. SR at 8.
Ameren’s proposal addresses an unlined ash impoundment designated as “Pond D.”
Prop. at 6; TSD at 14. Pond D was constructed from indigenous earthen materials and operated
as the Station’s primary ash management unit from 1968 until the construction of a synthetically-
lined Pond A during the 1980s. Prop. at 8; TSD at 14. In 2000, Ameren constructed two
additional lined ponds, Ponds B and C. Prop. at 8. Ameren then removed Pond D from service
and allowed it to dewater.
Id
. Ameren estimates that, during 30 years of active operation, Pond
D accumulated approximately 750,000 cubic yards of ash.
Id
. at 9. Ameren further estimates
that 280,000 cubic yards, or approximately one-third of that volume, lies below the water table.
Id
. Ameren states that “the Agency approved the addition of approximately 200,000 cubic yards
of ash to Ash Pond D after it was taken out of service to enable the establishment of an
acceptable final grade.”
Id
.
Before submitting its proposal for a site-specific rule, Ameren filed with the Board a
petition for an adjusted standard from the Board’s landfill regulations as the mechanism to close
Pond D. Prop. at 1;
see
Petition of Ameren Energy Generating Company for Adjusted Standard
from 35 Ill. Adm. Code Parts 811, 814, and 815 (Hutsonville Power Station), AS 09-1 (Aug. 11,
2008). In an order dated September 16, 2008, the Board accepted Ameren’s petition but directed
Ameren and the Agency to address three issues: the authority to apply landfill regulations to
Pond D, whether any permit issued to Ameren addressed requirements to close Pond D, and
whether a site-specific rule is the appropriate mechanism through which to establish the
requirements to close Pond D.
Petition of Ameren Energy Generating Company for Adjusted
Standard from 35 Ill. Adm. Code Parts 811, 814, and 815 (Hutsonville Power Station), AS 09-1,
slip op. at 3-4 (Sept. 16, 2008). After receiving responses from both Ameren and the Agency,
the Board in an order dated March 5, 2009, dismissed Ameren’s petition for an adjusted standard
and concluded “that a site-specific rule is the appropriate regulatory relief mechanism under
which to close Ameren's Pond D.” Petition of Ameren Energy Generating Company for
Adjusted Standard from 35 Ill. Adm. Code Parts 811, 814, and 815 (Hutsonville Power Station),
AS 09-1, slip op. at 1, 11 (Mar. 5, 2009).
4
Ameren states that it proposed this site-specific rule “to cover a gap in the Board’s
existing Waste Disposal regulations and allow for the closure of Ash Pond D.” SR at 1. Ameren
argues that the Board’s water pollution regulations apply during the operation of surface
impoundments such as Pond D.
Id
. at 1-2. Ameren further argues that, when closed, they are
not defined as landfills and do not fit within the scope of the Board’s waste disposal rules or
other regulations.
Id.
at 2, citing 35 Ill. Adm. Code 810.103. Ameren claims that these
circumstances warrant adoption of a site-specific rule.
See
SR at 2. Specifically, Ameren
proposes a new subchapter addressing surface impoundments under the existing Subtitle G
regulations governing waste disposal.
Id
. at 3.
Ameren states that it considered a number of options for closing Pond D. SR at 15-21;
see
TSD at 10-174. Ameren’s proposed regulations allow existing ash to remain in place and
require “a geosynthetic membrane cap and final cover system that meet the performance
requirements of the general landfill regulations along with a groundwater collection trench.” SR
at 15, citing 35 Ill. Adm. Code 811.314. Ameren states that its proposal relies where appropriate
on “methods for measurement and performance criteria from the landfill regulations.” SR at 15.
Ameren estimates that the capital costs associated with this closure plan could range from $3 to
$4 million, excluding engineering.
Id
. at 21. It expects annual operating and maintenance costs
of approximately $50,000.
Id
. In addition, Ameren reports that it assessed the environmental
impact of its proposed regulations.
Id
. at 22;
see
TSD at 331-492. That assessment concluded
“that the closure plan and associated activities do not pose a threat to human health or the
environment under current and reasonably foreseeable future conditions and land use.” SR at 22.
MOTION FOR EXPEDITED REVIEW
Ameren’s Motion
Ameren states that it has discussed the standards under which to close Pond D with the
Agency “[o]ver a number of years.” Mot. Exp. at 1. Ameren notes that, while in 2008 it filed a
petition for an adjusted standard as the mechanism for closing Pond D, the Board dismissed the
petition and found that a site-specific rule is the appropriate mechanism.
Id
.;
see
Petition of
Ameren Energy Generating Company for Adjusted Standard from 35 Ill. Adm. Code Parts 811,
814, and 815 (Hutsonville Power Station), AS 09-1, slip op. at 1, 11 (Mar. 5, 2009).
Ameren states that, in the meantime, it has placed its Hutsonville Station on the market
for sale. Ameren argues that, “[a]lthough having already closed Ash Pond D would present
Hutsonville in a better light to a potential buyer, having at least a rule that sets forth the
parameters under which Ash Pond D may be closed would be beneficial. Regulatory certainty
would provide a buyer with information sufficient to estimate and plan for environmental
compliance obligations.” Mot. Exp. at 2.
Ameren also claims that there is increased interest on the part of regulators and the
general public in addressing ash ponds at coal-fired electric generating plants.
See
Mot. Exp. at
2. Ameren notes that the Agency has requested that power plants “voluntarily monitor
groundwater at ash impoundments.”
Id
. Ameren further notes that the United States
Environmental Protection Agency (USEPA) intends to visit ash impoundments “to gather
5
information regarding structural stability and design issues.”
Id
. Ameren also states that a
petition for a site-specific rule is the appropriate course to follow in closing Pond D.
Id.
Ameren argues that it “will continue to suffer material hardship so long as the parameters
under which it may close Ash Pond D are undecided.” Mot. Exp. at 2.
Ameren characterizes the Board’s docket as “heavy” but expresses the belief that “it has
addressed most, if not all, of the Agency’s requests and has prepared this proposal and
supporting technical documents to facilitate prompt review.” Mot. Exp. at 2. Specifically,
Ameren states that it “has performed numerous studies, assessments, and analyses of the impacts
of Ash Pond D and the best method for closing it.”
Id
. at 3. Ameren notes that the Board
recently granted motions for expedited review.
Id
. at 2-3;
see, e.g.,
In the Matter of:
Amendments to 35 Ill. Adm. Code 217, Nitrogen Oxides Emissions, and 35 Ill. Adm. Code 211,
R08-19, slip op. at 4 (Apr. 2, 2009) (characterizing USEPA implementation deadline and risk of
federal sanctions as “dire circumstances”). Ameren further notes that the Board recently
provided first notice of a site-specific rule proposed by the City of Galva without commenting on
the merits of that proposal. Mot. Exp. at 3, citing In the Matter of: City of Galva Site-Specific
Water Quality Standard for Boron Discharges to Edwards River and Mud Creek: 35 Ill. Adm.
Code 303.447 and 303.448, R09-11, slip op. at 3 (Feb. 5, 2009). “Ameren requests that the
Board grant it the same consideration” by providing first notice of its proposal, and setting
hearings and moving toward decision expeditiously. Mot. Exp. at 3.
Agency’s Response to Ameren’s Motion
In its response, the Agency notes that Ameren wishes to sell the Station and argues that
closing Ash Pond D, “or the certainty of the steps necessary to achieve closure, would make the
facility more attractive to potential buyers.” Resp. at 2;
see
Mot. Exp. at 2. The Agency
suggests that this argument effectively seeks expedites review “upon the basis of providing for a
more marketable plant.” Resp. at 2. Although the Agency acknowledges that a more marketable
plant would benefit Ameren, it states that Ameren’s “decision to offer the sale of its plant is, at
best, a self-imposed hardship.”
Id
. The Agency argues that Ameren’s interest in placing its
property in a more favorable light should not by itself resolve the motion for expedited review.
See id
. at 2-3.
The Agency continues its response by citing “the public interest in conducting a
proceeding that thoroughly and deliberately evaluates the proposal. . . .” Resp. at 3. The Agency
argues in support of this evaluation by describing the recent course of its communication with
Ameren on the issues raised by this proposal.
Id
. at 3-5. The Agency first notes that the Board
issued the order finding that a site-specific rule is the appropriate mechanism for closing Pond D
on March 5, 2009.
Id
. at 3, citing Petition of Ameren Energy Generating Company for Adjusted
Standard from 35 Ill. Adm. Code Parts 811, 814, and 815 (Hutsonville Power Station), AS 09-1
(Mar. 5, 2009). The Agency states that, on March 10, 2009, it received from Ameren a draft
version of proposed legislation applying generally to closing surface impoundments containing
coal combustion waste. Resp. at 3. The Agency further states that, by March 13, 2009, it had
assembled a group of staff members to begin evaluating that draft legislation. The Agency
indicates that, on March 22, 2009, it received from Ameren a draft version of the legislation
6
prepared by the Legislative Reference Bureau.
Id
. The Agency also indicates that, by March 24,
2009, its staff “had identified a list of significant questions and concerns about the legislation in
the event the draft proposal was introduced in the General Assembly.”
Id
. The Agency
expressed doubt about the potentially rapid pace of the legislative process and the risk that
legislation might conflict with expected federal proposals.
Id
. at 4.
The Agency reports that, on April 8, 2009, it received three documents from Ameren:
“the generally applicable draft legislation, Ameren’s draft site-specific rule for the closure of Ash
Pond D, and a ‘Summary Document presenting the underlying elements of the approach for the
closure of Ash Pond D . . . as found in the draft rule.’” Resp. at 4. The Agency states that, on
April 9, 2009, it expressed to Ameren its preference to pursue adoption of a site-specific rule on
this issue rather than passage of legislation.
Id
. The Agency reports that, “[o]n or about April
13th, Ameren proposed a meeting at Agency headquarters in Springfield the following Thursday,
April 16th, for the purpose of walking through its proposal and supporting documentation and
receiving the Agency’s comments on the proposal.”
Id
. The Agency states that, although it
could not meet on that proposed date, it scheduled a meeting on April 21st and provided Ameren
with comments and supporting documentation on April 17th.
Id
. The Agency claims that both
the Agency and Ameren then understood that the Agency’s comments were preliminary and not
necessarily complete and also that “Ameren had not yet ruled out proceeding with legislation.”
Id
. at 4-5.
The Agency states that, as a result of that meeting, Ameren revised its proposal for a site-
specific rule and provided the Agency a copy of the revised proposal on May 2, 2009. Resp. at
5. The Agency reports, however, that it could not conduct “accelerated review” of that amended
proposal until May 11, 2009.
Id
. The Agency further reports that it had not compiled comments
when Ameren checked on the progress of that review on May 15, 2009. During that check,
“Ameren stated its intention to file the proposal with the Board the following week.”
Id
. The
Agency states that, when Ameren called on May 19, 2009, to check again on that progress, it had
assembled only partial comments that had not been reviewed and were not ready for discussion.
Id.
The Agency states that Ameren filed its proposal on May 19, 2009, before the Agency
had completed its evaluation. Resp. at 5. The Agency further states that there had not been a
“meeting of the minds” on that proposal before Ameren filed it.
Id
. at 6. Nonetheless, the
Agency suggests that, in the course of the exchanges described above, it has conscientiously
participated in discussions and has sought “to identify and resolve as many issues as possible
before the proposal was filed with the Board.”
Id
. at 5. Characterizing Ameren’s course since
March 5, 2009, as hasty, the Agency argues that the motion for expedited review seeks to
continue a pace that has allowed it “little time to fully evaluate the proposal and its effects, much
less for deliberation about how the proposal might be improved to the extent necessary.”
Id
.
The Agency takes the position that, based on the environmental issues it raises, “this
proposal is too important to rush.” Resp. at 6. The Agency emphasizes that Ameren itself has
seven facilities similar to Pond D that will require closure in the future and that Ameren expects
other companies to use its proposal as an example in closing their own surface impoundments.
Id
., citing Petition of Ameren Energy Generating Company for Adjusted Standard from 35 Ill.
7
Adm. Code Parts 811, 814, and 815 (Hutsonville Power Station), AS 09-1, slip op. at 5 (Mar. 5,
2009). Stating that the Board may in effect be adopting a regulatory program through a site-
specific rulemaking, the Agency expresses that belief that “it is not in the public interest to
accelerate this proceeding.” Resp. at 6.
The Agency states that, although it discussed and responded to a first draft of Ameren’s
proposal, it has not yet had substantive discussions with Ameren on the subsequent draft filed
with the Board. Resp. at 8. Suggesting that its review of that proposal is not complete, the
Agency lists issues about which it has questions and expresses reservations:
Groundwater contamination monitoring, assessment, and response: Several
unclear, open-ended and/or inappropriate provisions; omissions such as no clear
requirements to control public or private uses of contaminated off-site
groundwater;
Requirements for final slope and stabilization and cover system;
Time periods for initial implementation and compliance; [and]
Little or no Agency oversight or involvement where provisions propose the
flexibility to establish or alter elements of the closure and post-closure plans, or,
in the alternative, the proposal may be insufficiently prescriptive to support
effective field inspections and enforcement for non-compliance.
Id
.
The Agency affirms its willingness to continue discussions with Ameren in order to address its
questions and reservations and as a “constructive alternative” to expedited review.
Id.
at 9. The
Agency proposes that it would be a more effective course than expedited review “for the Agency
to identify satisfactory alternatives, consider amendments to the proposal or an alternative
proposal to implement the alternatives, and prepare written testimony to convey all of this to the
Board and participants.”
Id
.
The Agency states its reservation that expedited review “will compromise the Agency’s
capacity to fully identify, address, and express its concerns and proposed solutions.” Resp. at 9.
The Agency notes that the Board recently denied the City of Galva’s motion for expedited
review after noting that it had a pressing workload and limited resources.
Id
. at 7, citing In the
Matter of: City of Galva Site-Specific Water Quality Standard for Boron Discharges to Edwards
River and Mud Creek: 35 Ill. Adm. Code 303.447 and 303.448, R09-11, slip op. at 3 (Feb. 5,
2009). The Agency indicates that it is experiencing similarly limited resources.
See
Resp. at 7-
8.
The Agency also suggests that providing first notice of the proposal without comment on
its merits does not overcome this reservation. The Agency claims that such a step “still has the
effect of starting the time clock and reducing the Board’s flexibility.”
Id
. The Agency indicates
that the Board should not provide first notice of a proposal “until the nature and extent of the
issues are better understood.”
Id.
8
Ameren’s Reply
Ameren notes suggestions by the Agency in its response that expedited review “would be
contrary to the public interest in conducting a proceeding that thoroughly and deliberately
evaluates the proposal and does not consider Agency resource limitations.” Reply at 1. Ameren
states its appreciation for these views but “believes that an expedited proceeding would not
adversely impact the public’s interest, and the Agency’s limited resources are a chronic problem
that would not be solved by less than prompt review of this matter.”
Id
.
Ameren argues that, whether or not the Board grants the motion for expedited review, the
Board will hold a hearing on the proposal in the vicinity of the Station. Reply at 2;
see
415 ILCS
5/28(a) (2006). Ameren further argues that, whether or not the Board grants the motion for
expedited review, the Board “must provide at least 20 days’ notice of the hearing.” Reply at 2,
citing 35 Ill. Adm. Code 102.604;
see
415 ILCS 5/28(a) (2006). Ameren also argues that, in the
event that the Board provides first notice of the proposal, “the Board must allow for a 45-day
public comment period prior to second notice.” Reply at 2, citing 35 Ill. Adm. Code 102.608;
see
5 ILCS 100/5-40(b) (2006). Ameren claims that, “[d]uring this entire process, the Agency,
the Board, and the public have sufficient time to thoroughly and deliberately evaluate the rule, as
provided by the Board’s regulations.” Reply at 2. Ameren also notes that, even if the Board
granted its motion for expedited review and adopted the proposal for first notice as quickly as
possible, a hearing could occur no sooner than the end of June.
Id.
at 3. Ameren indicates that it
would not object to a hearing at the end of July, which would allow the Agency more than 60
days of review after the initial filing of the petition.
Id.
Ameren states that it has intermittently engaged in consultation on the issue of closing
ash ponds “for many years” and has supplied the Agency with documents relating to that closure.
Reply at 2. Ameren notes that it filed a petition for an adjusted standard in 2008, and that the
Board subsequently “determined that a site-specific rule is the appropriate mechanism under
which Ameren should close Ash Pond D.”
Id
., citing Petition of Ameren Energy Generating
Company for Adjusted Standard from 35 Ill. Adm. Code Parts 811, 814, and 815 (Hutsonville
Power Station), AS 09-1, slip op. at 1, 11 (Mar. 5, 2009). Ameren argues that the substance of
this petition is not different than its petition for an adjusted standard. Ameren further argues that,
in discussing ash pond closure, it has “provided the Agency with virtually all of the documents
that comprise the Technical Support Document.” Reply at 3.
Ameren argues that, because “the issues in this proposal are not new to the Agency or
materially different than what has been discussed by the participants for years.” Reply at 3.
Ameren further argues that it has proceeded aggressively but prudently in seeking a course
through which to close Pond D.
See id
. Ameren suggests that, having offered the Station for
sale and facing heightened public and regulatory interest in ash ponds, it cannot afford to be
drawn by the Agency into additional negotiations on the issue.
See id
. Ameren thus restates its
request that the Board accept the proposal, adopt it for first-notice publication, and set a hearing
date as soon as possible.
Id
. at 4.
DISCUSSION
9
First, the Board finds that Ameren’s petition meets the content requirements of 35 Ill.
Adm. Code 102.208 and 102.210 and accepts the petition for hearing.
Turning to Ameren’s motion for expedited review, the Board notes that Section 101.512
of its procedural rules addresses requests for expedited review.
See
35 Ill. Adm. Code 101.512.
Such requests must include, among other elements, “a complete statement of the facts and
reasons for the request.” 35 Ill. Adm. Code 101.512(a). In acting on a motion for expedited
review, the Board considers, at a minimum, “all statutory requirements and whether or not
material prejudice will result from the motion being granted or denied.” 35 Ill. Adm. Code
101.512(b). In addition, the Board will only grant a motion for expedited review consistent with
available resources.
See
35 Ill. Adm. Code 101.512(c).
As a matter of its various resources and decision deadlines, the Board cannot expedite
consideration of every case or rulemaking proposal. In denying a motion for expedited review
filed by the City of Galva, the Board recently stated that its “limited resources in light of its
current and future decision deadlines render the granting of a motion for expedited review
unlikely in all but the most dire circumstances.” In the Matter of: City of Galva Site-Specific
Water Quality Standard for Boron Discharges to Edwards River and Mud Creek: 35 Ill. Adm.
Code 303.447 and 303.448, R9-11, slip op. at 3 (Feb. 5, 2009);
see also
In the Matter of:
Petition of Westwood Lands, Inc. for an Adjusted Standard from Portion of 35 Ill. Adm. Code
807.104 and 810.103 or, in the Alternative, a Finding of Inapplicability, AS 09-3, slip op. at 10
(May 21, 2009) (denying motion for expedited review).
The Board did recently grant two Agency motions to expedite consideration of proposed
rules, in which the Agency described the risk of United States Environmental Protection Agency
(USEPA) sanctions if the State failed to remedy deficiencies in the State Implementation Plan for
ozone attainment. In each of these two rulemaking proceedings, the Board found that the
USEPA implementation deadline and the risk of federal sanctions constitute “dire
circumstances.” Section 27 Proposed Rules for Nitrogen Oxide (NO
x
) Emissions From
Stationary Reciprocating Internal Combustion Engines and Turbines: Amendments to 35 Ill.
Adm. Code Parts 211 and 217, R07-19, slip op. at 4 (Apr. 2, 2009); In the Matter of: Nitrogen
Oxides Emissions from Various Source Categories, Amendments to 35 Ill. Adm. Code Parts 211
and 217, R08-19, slip op. at 4 (Apr. 2, 2009).
As noted above, expedited review is granted consistent with the Board’s decision
deadlines and available resources.
See
35 Ill. Adm. Code 101.512(c). The Board currently has a
number rulemaking dockets requiring immediate attention, as well as pressing cases of other
types. As a result of attrition, the Board has fewer staff than it has had in many years. These
circumstances have not meaningfully changed since the Board denied the City of Galva’s motion
for expedited review. These limited resources, particularly in light of current and future decision
deadlines, continue to make it unlikely that the Board will grant a motion for expedited review in
all but the most dire circumstances.
The Board does not discount Ameren’s position that regulatory certainty may facilitate a
sale of its station. The Board also does not discount Ameren’s view that there is general
regulatory and public interest in ash ponds at sites such as the Hutsonville Station. However,
10
these factors do not necessarily constitute “material prejudice” sufficient to allow the Board to
grant Ameren’s motion. The Board concurs with the Agency in weighing any heightened
interest in regulating ash ponds against granting the motion for expedited review. Particularly
when any rule adopted in this proceeding may guide the closure of many other surface
impoundments, the Board cannot agree that expedited review is appropriate. Accordingly, the
motion is denied.
The Board notes that Ameren has effectively proposed that the Board expedite review by
providing first notice of the proposal without commenting on its substantive merits. The Board
believes that this step would reduce its own flexibility and that of other participants. Substantial
amendments to the proposal, even agreed amendments, may necessitate publication of a second
first notice so that granting Ameren’s request would not necessarily result in more expeditious
adoption of a rule. However, the Board commits to reaching a prompt decision in this matter as
soon as the record is complete and directs its hearing officer to take any necessary steps to avoid
delay in completing the record.
IT IS SO ORDERED.
I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that
the Board adopted the above order on June 18, 2009, by a vote of 5-0.
___________________________________
John T. Therriault, Assistant Clerk
Illinois Pollution Control Board