1. BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
      2. THIS FILING IS SUBMITTED ON RECYCLED PAPER
      3. BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
      4. THIS FILING IS SUBMITTED ON RECYCLED PAPER
      5. Allison, James
      6. Allison, James

BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
Eagle Point Farms, LLC - Table Grove
(property Indentification Nnmber
20-22-16-400-010)
Clerk
Illinois Pollution Control Board
James R. Thompson Center
100 West Randolph Street, Suite. 11-500
Chicago IL 60601
Steve Santarelli
Illinois Department ofRevenue
101 WestIefferson
Post
Office Box 19033
Springfield IL 62794
)
) PCB 09-
) (fax Certification)
)
)
NOTICE
Gary Donley
POBox 220
Carthage IL 62321
PLEASE TAKE NOTICE
that I have today filed with the Office ofthe Clerk ofthe
Pollution Control Board an
APPEARANCE AND THE RECOMMENDATION
of the lllinois
Environmental Protection Agency, a copy of which is herewith served upon you.
DATED: January 29,2009
Illinois Environmental Protection Agency
1021 North Grand Avenue East
Post
Office Box 19276
Springfield IL 62794-9276
(217) 782-5544
ENVIRONMENTAL
PROTECTION AGENCY
OF
THE STATE OF ILLINOIS
By:
Chad
(l-<,~
M. Kruse
Assistant
Counsel
Division of Legal Counsel
THIS FILING IS SUBMITTED ON RECYCLED PAPER
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
Eagle Point Farms, LLC - Table Grove
(Property Indentification Number
20-22-16-400-010)
)
)
PCB 09-
)
(Tax Certification)
)
APPEARANCE
The
undersigned, as one of its attorneys, hereby enters an
APPEARANCE
on behalf of Respondent,
Illinois Environmental
Protection Agency.
DATED: January 29, 2009
Illinois Environmental Protection Agency
1021 North Grand Avenue East
Post Office Box 19276
Springfield
IL
62794-9276
(217)782-5544
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY
By:--:=,C~"""";';_'>'-A""-"A>......d'--'.g"",,,,::--
____ _
Chad M. Kruse
Assistant Counsel
Division
of Legal Counsel
THIS FILING IS SUBMITTED ON RECYCLED PAPER

STATE OF ILLINOIS
COUNTY
OF SANGAMON
)
)
)
)
)
PROOF OF SERVICE
I, the undersigned, on oath state that I have served the attached APPEARANCE AND THE
RECOMMENDATION, upon the person to whom it is directed, by placing a copy in an envelope
addressed
to:
Steve Santarelli
Illinois Department
of Revenue
101 WestJefferson
Post Office Box 19033
Springfield IL 62794
Gary Donley
POBox 220
Carthage IL 62321
and mailing it from Springfield, TIlinois, on January 29, 2009, with sufficient postage
affixed
for first class mail.
And
electronically, on January 29, 2009 to:
Clerk
Illinois Pollution Control Board
James R. Thompson Center
100 West Randolph Street, Suite. 11-500
Chicago IL 60601
SUBSCRIBED AND SWORN TO BEFORE ME
This 29th day
of January, 2009
~AM(JaJk
Otary Public
OFFICIAL SEAL
DAWN A. HOLLIe
NOTARY
PUBUC.
STATE Of
II.I.INOIS
1f1J!.,1ISS1OHEXPIRES 8-1i-2O!2
THIS FILING IS SUBMITTED ON RECYCLED PAPER

BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
Eagle Point Farms, LLC - Table Grove
(property Indentification Number
20-22-16-400-010)
)
) PCB09-
) (Tax Certification)
)
)
RECOMMENDATION
The Illinois Environmental Protection Agency ("Illinois EPA") hereby files its
Recommendation pursuant
to Section 125.204 of the regulations of the Illinois Pollution
. Control Board, 35
Ill.
Adm. Code 125.204.
I.
On December 28,2007, the Illinois EPA received a request from Gary Donley,
2.
Eagle Point Farms, LLC (log number TC-44-07, Exhibit A) for an Illinois EPA
recommendation regarding the tax certification of water pollution control
facilities pursuant to
35
Ill.
Adm. Code 125.204.
The applicant's address is:
Eagle Point Farms, LLC
3001 E. Quarter Roelmead
Table Grove IL 61482
The proposed water pollution control facilities in this request are located at
Section 16, T4N,
Rl W of the 4th P.M. in Fulton County, at the above street
address and consist of the following:
Livestock waste management facilities consisting of one concrete pit (34 ft. x 81
ft. x 2 ft. deep) and the portion of the plastic and cast iron slotted flooring over
the manure
pit in Building # I; one concrete pit (81 ft. x 201 ft. x 8 ft. deep) with
ten concrete pump out pits (each 4
ft. x 4 ft. x 8 ft. deep) and the portion of the
concrete slotted flooring over the manure pits in Building # 2; one concrete pit
(77
ft. x 720 ft. x lOft. deep) with twenty concrete pump out pits (each 4 ft. x 4
ft. x 10 ft. deep) and the portion of the concrete slotted flooring over the manure
pits in Building
# 3; one concrete pit (81 ft. x 928 ft. x 2 ft. deep) and the portion
of the plastic and cast iron slotted flooring over the manure pit in Building # 4;
one concrete pit (77
ft. x 720 ft. x lOft. deep) with twenty concrete pump out
pits (each 4 ft. x 4
ft. x 10 ft. deep) and the portion of the concrete slotted
flooring over the manure pits in Building # 5; and approximately
50 ft. of 8 inch
THIS FILING SUBMITTED ON RECYCLED PAPER
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

diameter PVC manure transfer piping. These livestock waste management
facilities are used to collect, transport, and/or store livestock wastes prior to
cropland application.
These livestock waste management facilities are used to collect, transport and/or
store livestock wastes prior to cropland application., and are further described
in
Exhibit
A.
4.
Section 11-10 ofthe Property Tax Code, 35 ILCS
200/11-10
(2006), defines
"pollution control facilities" as:
any system, method, construction, device
or appliance appurtenant
thereto
or any portion of any building or equipment, that is
designed, constructed, installed or operated for the primary
purpose of: (a) eliminating, preventing, or reducing air
or water
pollution
... or (b) treating, pretreating, modifying or disposing of
any potential solid, liquid or gaseous pollutant which if released
without treatment, pretreatment modification
or disposal might be
harmful, detrimental or offensive to human, plant or animal life, or
to property.
5.
PoIIution control facilities are entitled to preferential tax treatment, 35
ILCS
200/11-5.
6.
Based on the information in the application and the purpose of the facilities, it is
the Illinois
EPA's engineering judgment that the described facilities may be
considered
"pollution control facilities," pursuant to 35 Ill. Adm. Code
125.200(a), with the primary purpose
of eliminating, preventing, or reducing
water pollution, or as otherwise provided in
35 III. Adm. Code 125.200, and are
eligible for tax certification from the Board.
WHEREFORE, the llIinois
EPA recommends that the Board issue the
THIS FILING SUBMITTED ON RECYCLED PAPER
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

requested tax certification.
Dated: January
29,2009
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY
By:
---"G_!(-"-."",,,,~=>....,~~
Chad M. Kruse
Assistant Counsel
Division
of Legal Counsel
Illinois Environmental Protection Agency
1021 North Grand Ave. E.
P.O. Box 19276
Springfield, Illinois 62794-9276
217/782-5544
THIS FILING SUBMITTED ON RECYCLED PAPER
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

To:
From:
Date:
Re:
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
1021 NORTH GRAND AVENUE EAST,
P.O.
Box 19276, SPRINGFIELD, ILLINOIS 62794-9276 - ( 217) 782-2829
JAMES R. THOMPSON CENTER, 100 WEST RANDOlPH, SUITE 11-300, CHICAGO, IL 60601 - (312) 814-6026
ROD R. BLAGOJEVICH, GOVERNOR
DOUGLAS
P.
SCOTT, DIRECTOR
Memorandum
Connie Tonsor, Division of Legal Counsel
Alan Keller, Manager, Permit Section
JAN 2 6
2009
Eagle Point Farms, LLC - Table Grove
Recommendation
of Tax Certification
Log # TC-44-07
Property
Identification # 20-22-16-400-0 I 0
RECEIVED
Division of Legal Counsel
JAN 27 2009
Environmental Protection
Agency
The Bureau of Water received a request on December 28,2007 from Eagle Point Farms, LLC for an Illinois EPA
recommendation regarding the tax certification of water pollution control facilities pursuant to 35
II.
Adm. Code
125.204. We offer the following recommendation.
The water pollution control facilities in this request include the following:
Eagle
Point Farms, LLC
300 I E. Quarter Roelmead
Table Grove, IL 61482
Section 16,
T4N, RIW of the 4th P.M. in Fulton County
Livestock waste management facilities consisting of one concrete pit (34 ft. x 81 ft. x 2 ft. deep) and the
portion of the plastic and cast iron slotted flooring over the manure pit in Building # I; one concrete pit (81
ft.
x 201 ft. x 8 ft. deep) with ten concrete pump out pits (each 4 ft. x 4 ft. x 8 ft. deep) and the portion of
the concrete slotted flooring over the manure pits in Building # 2; one concrete pit (77 ft. x 720 ft. x lOft.
deep) with twenty concrete pump out pits (each 4 ft. x 4 ft. x lOft. deep) and the portion of the concrete
slotted flooring
over the manure pits in Building # 3; one concrete pit (81 ft. x 928 ft. x 2 ft. deep) and the
portion of the plastic and cast iron slotted flooring over the manure pit in Building # 4; one concrete pit (77
ft. x 720 ft. x 10 ft. deep) with twenty concrete pump out pits (each 4 ft. x 4 ft. x 10 ft. deep) and the
portion of the concrete slotted flooring over the manure pits in Building # 5; and approximately 50 ft. of 8
inch diameter
PVC manure transfer piping. These livestock waste management facilities are used to
collect, transport, andlor store livestock wastes prior to cropland application.
These facilities are further described in the enclosed applications and supporting documents.
Based on the information included in this submittal,
it
is our engineering judgment that the above proposed facilities
may be considered "Pollution Control Facilities" under 35 lAC 125.200(a), with the primary purpose of eliminating,
preventing,
Of. reducing water pollution, or as otherwise provided
in
this section, and therefore eligible for tax
certification
from the Illinois Pollution Control Board. The Bureau of Water therefore recommends that the Board
issue the requested tax certification for these facilities.
If you have any questions regarding the above, please contact James Allison at 217/782-3362.
SAK:DLH:JRA:
cc:
Tax Cert File
ROCKFORD _ 4302
North Main Street, Rockford, IL
611 03 -
(B15) 9B7-7760
DES PLAINES -
9511 W.
Harrison
St.,
Des Plaines, IL
60016 -
(B47) 294-4000
ELGIN _
595
South State, Elgin, IL
60123 -
(B47)
608-3131
PEORIA -
5415
N. University St., Peoria, IL
61614 - (309) 693-5463
BUREAU Of I.ANI) - PEORIA -
7620
N. University St., Peoria, IL
61614 - (309) 693-5462
CHAMPAIGN -
2125
South First Street, Champaign, II.
61820 - (217)
27B-5800
COLLINSVII.LE -
2009
Mall Street, Collinsville, IL
62234 -
(61B)
346-5120
MARION -
2309 W.
Main St., Suite
116,
Marion, IL
62959 - (618) 993-7200
PRINTED ON RF.CYCLED PAPER
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

~vlewe!":
. .,;.:;. .'0 .
=
Jte
\....
~ .-.~I
-=
~VIC::S
!
:-:stal1eci:
~
ig.nilwr:::
C'3/0(/oQ!.
~JC1t10n:
Jatc:
"7"\"'~e:
Cantac::
Phone:
P",oc:'tV
iD:
C <lunt,",
?;ovlQec
::~ir t:~n
"/alue:
Title:
=
A~cr:em
)<:LivestocK
);rLivcstock waste 15 lopiiea 10 c::=iana.
o Agnci:emlc:li rinsllte lna soiiia.e :s recycied
Ittrou~
the r:'oiiiry lnOlor i:ma acpliea.
C Other:
PhysIc", Descnction or' Pollution Control Devices:
r'~
."":
. -<:.,
'.~"
.'"
Other:
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

Allison, James
From:
Pam Flesner [pflesner@hogvet.com]
Sent:
Wednesday, October 22, 2008 2:43 PM
To:
Allison, James
Subject: RE: update
See answers below in red
From:
Allison, James [mailto:James.Allison@IIlinois.gov]
sent:
Monday, October 20, 2008 1:42 PM
To:
Pam Flesner
Subject:
RE: update
Pam,
I have recieved the infonnation and signature pages since we last spoke. There are a couple follow up questions and some of the unanswered
questions from last time so
I
can finish.
The following is
an update on the projects.
TC-39-07
-- Deer View, LLC
Preparing
paperwork
TC-40-07
-- Wildcat Fanus, LLC
Preparing
paperwork
TC-41-07 -- LaMoine Valley Farms, LLC
Provide dimensions of the manure collection pits on buildings
1
and 4. DimenRioru; RalUe as the buildings x
2'
deep.
TC-42-07 -- Hilltop View, LLC
Provide dimensions of the manure collection pits on buildings 1 and 4. Dimensions same as the buildings x 2' deep.
TC-43.07 -- Lone Hollow, LLC
Provide
the depths for each manure pit. Bldg 2 = 8' ! Bldg 3
&
5 = 10'
Provide which manure pits have pumpout pits and how many? Bldg 2 has 6 pwnp OLltS! Bldg 3
&
5 have 14 pump outs
each
TC-44-07
-- Eagle Point Famls, LLC
Provide dimensions of the manure collection pits on buildings 1 and 4. Dimensions same as the buildings x 2' deep,
TC-45-07
-- North Fork Pork, LLC
Provjde
the depths for each manure pit. Bldg 2
&
4 = 10'
I
Bldg 1
=
S'
!
Bldg 3 = 2'
Provide whicb manure pits have pumpout pits and bow many? Bldg 2
&
4 ... 20 on each bldg
TC-46-07 .- Timberline, LLC
Provide
the depths for the manure collection pit in Building #4. 2'
Provide bow many pumpout pits for tbe manure pit in Building #1, 2, and 3. Bldg I bas
61
Bldg 2
&
3 have] 6 pump
outs each
TC-4 7 -07 -- Pinnacle Genetics, LLC
Provide the depth for the manure collection pit in Building #1. 2'
Provide which manure pits have pumpout pits and .how many? Bldgs 2
8:.
3 .. each have 12 pumpouts
Provide the dimensions of the pumpout pits.
Working on ...
TC-48-07
-- Western Creek Fanus, LLC
10/2212008
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

"
Provide the dimensions of the pumpout pits. (??? 4ft x 4ft x 8
ft
conc. ???) Working on ...
TC-50-07 -- Cedercres!, LLC
Provide dimensions of the collection pits on buildings I and 4. Dimensions same as lhe buildings x 2' deep.
This communication, along with any infonnation and attachments, is privileged and confidential and protected from disclosure and covered by federal and state Jaw governing electronic
communication.
If
the
reader
of this
message is not the intended recipient, or an employee or agent responsible for delivering this message to the intended recipient, you are hereby notified
that any dissemination, distribution, or copying
of this
communication is strictly prohibited.
If you
have received this communication in error, please notify us
by
replying to the message sod
deleting it from your computer. Thank you. Carthage Veterinary Service, Ltd.
.
Visit us at
www
hQgvet.com
10122/2008
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

Sec.E
V)
!;:
~
l'
z
"
,0
1=0
:;
u
.::
~
0
I-
"
z
0
0
z
0
;::
"",
:ll-
~(3
'"
z
;::
z
0
"
0
0
'"
Sec. F
w
I-
"
"
'"
z
'"
in
Sec. G
V)
z
0
;::
u
"
"
l-
V)
~
(1) Nature of Contaminants or Pollutants
Material Retained, Captured or Recovered
Contaminant or Pollutant
DESCRIPTION
DISPOSAL OR USE
Swine Manure
Soread as
fertilizer
--
J2)
Point(s) of Waste Water Discharge
None
Plans and Specifications AttachedTYes
0
TNoO
(3
Are contaminants (or residues) collected by the control facility?
I Yes Il!l
I NoD
(4)
Date installation completed
03/01/06
status of installation on date of application
COMPLETE
(5)
a. FAIR CASH VALUE IF CONSIDERED REAL PROPERTY:
$
2,163,000.00
b. NET SALVAGE VALUE IF CONSIDERED REAL PROPERTY:
$
0.00
c. PRODUCTIVE GROSS ANNUAL INCOME OF CONTROL FACILITY:
$
0.00
d. PRODUCTIVE NET ANNUAL INCOME OF CONTROL FACILITY:
$
0.00
e. PERCENTAGE CONTROL FACILITY BEARS TO WHOLE FACILITY VALUE:
%40
The following information is submitted in accordance with the Illinois Property Tax Code, as amended, and to the best of my
knowledge, is true and correct. The facilities claimed herein are .pollution control facilities. as defined in Section
11-10
of the
IlIiCO :J: Code.
R~I'st:tn'J
a~~
,J
Signat
Jr.e
J
Title
INSTRUCTIONS FOR COMPILING AND FILING APPLICATION
General: Separate applications must be completed for each control facility claimed. Do not mix types (water and air). V\lhere both air and
water operations are related, file two applications. If attachments are needed, record them consecutively on an index sheet.
Sec. A
Sec. B
Sec.C
Sec. D
Sec. E
Sec. F
Information
r~ters
to applicant as listed in the tax records
a~CI
Ine person to
be
contacted for further details or for inspection of
facilities. Define facility location by street address or legal description. A plat map location is required for facilities located
outside
of municipal
boundaries. The Droperty identification
number is
required.
Self-explanatory. Submit copies of all pennits issued
by,
local pollution control agencies.
(e.g. MSD Conslruclion Permil)
Refers to manufacturing processes or materials on which pollution control facility is used.
Narrative description of the pollution control facility, indicating that its primary purpose is to eliminate, prevent or reduce pollution.
State the type of control facility. State permit number, date, and agency issuing permit. A narrative description and a process
flow diagram describing the pollution control facility. Include a listing of each major piece of equipment included in the claimed
fair cash value for real property. Include an average analysiS of the influent and effluent of the control facility stating the
collection efficiencY.
List air contaminants, or water pollution substances released as effluents to the manufacturing processes. List also the final
disposal of any contaminants removed from the manufacturing processes.
lIem
(1) -
Refers to pollulants and contaminanls removed from the process by Ihe pollution control facility.
Item (2) - Refers to water pollution but can apply to water-carried wastes from air pollution control facilities. Submit drawings,
which clearly show (a) POint(s) of discharge to receiving siream, and (b) Sewers and process piping to and from the control
facility.
Item (3) -If the collected contaminants are disposed of other than as wastes, state the disposition of the materials, and the value
in dollars reclaimed by sale or reuse of the colleced substances. State the cost of reclamation and related expense.
Item (4) - State the date which the pollution control facility was first placed in service and operated. If not, explain.
Item (5) - This information is essential to Ihe certification and assessment actions. This accounting data must be completed to
activate project review prior to certification by this Agency.
SeW-explanatory.
Signature must be a corporate authorized signature.
Submn
10:
lUinois EPA
P.O. Box
19276
Springfield, IL
62794-9276
Attention:
AI Keller
Penn~
Section
Division of Water Pollution Control
Tax CertifieD/ionior Pollution Control Facilities
Page2oj2
8/00
Attention:
Donald E. Sutton
Pennit Section
Division of Air Pollution Control
"
)]}(gl~l!Wl.m\
SEP
032008
]J
Watershed Management Section
BUREAU OF WATER
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

Allison, James
From:
Pam Flesner [pflesner@hogvet.comJ
Sent:
Monday, August 25,20082:27 PM
To:
Allison,
Jame~
Subject: RE: IL EPA App for Cert (Property Tax Treatment)
James.
I have some of the info you need in red below .. , I am working on getting the info for the last 4 farms.
Also,
I will be mailing the signature pages with the original signatures out today. Should I mail to the PO 19276 Springfield
address?
From:
Allison, James [mailto:James.Allison@II1inois,gov]
Sent:
Wednesday, August 06, 2008 3:01 PM
To: Pam Flesner
Subject:
RE:
IL
EPA App for Cert (Property Tax Treatment)
yes
From:
Pam Flesner [mailto:pflesner@hogvet.com]
Sent:
Wednesday, August 06, 2008 11:56 AM
To:
Allison; James
Subject:
RE:
IL
EPA App for Cert (Property Tax Treatment)
Thank you.
I will work on getting this info together. I assume you will need the Signature pages mailed, not faxed or scanned?
From:
Allison, James [mailto:James.Allison@IIlinois.gov]
Sent:
Tuesday, August 05, 2008 9:36 AM
To:
Pam Flesner
Subject:
RE:
IL
EPA App for Cert (Property Tax Treatment)
1'C-39-07 -- Deer View, LLC
Provide a signature page with an original signature. Mailing today ...
Which City is the facility in or near? West Point, IL 62380
Which Section is the facility located in terms
of Legal Description? 29 (NE Qtr)
1'C-40-07 -- Wildcat Fanns, LLC
Provide a signature page with
an original signature. Mailing today ...
Which City is the facility in or near? Dallas Cily, IL 62330
Which Section is the facility located in terms
of Legal Description? 28 (SW Qtr)
1'C-41-07 -- LaMoine Valley Farms, LLC
Provide a signature page with an original signature. Mailing today ....
Which City is the facility in or near? Colchester, IL 62326
Provide the depths for each manure pit. Bldg 2
~
W
I Bldg 3
&.
5
~
10'
Provide which manure pits have purnpout pits and how many? Bldg 2 bas 6 pumpoutsl Bldg 3
&
5
have 10 plimpouts
eacb
1'C-42-07 -- Hilltop View, LLC
9/212008
Provide a signature page with an original signature. Mailing today ...
Which City is the facility in or near? Rushvillc,IL 62681
Which
Section is the facility located in terms of Legal Description? J 6 (SW Qtr)
Provide the depths for
each manure pit. Bldg 2
~
8' / Bldg 3
&.
5
~
10'
Electronic Filing - Received, Clerk's Office, January 29, 2009
* * * * * PCNB 2009-053 * * * * *

Provide which manure pits have pump out pits and how many? Bldg 2 has 6 pump outs/ Bldg 3
&
5 have 10 pll!l1]loutS
eacb
rC-43-07 -- Lone Hollow, LLC
Provide a signature page with an original signature. M_ailing today ...
Which City is the facility in or near? Bowen,IL 62316
Provide the depths for each manure pit.
Provide which manure pits bave pumpout pits and how many?
TC-44-07
-- Eagle Point Farms, LLC
Provide a signature page with an original signature. Mailing today ...
Which City is the facility in or near? Table Grove,
IL 61482
Provide the depths for each manure pit. Bldg 2 = 8'
i
Bldg 3
&
5
=
10'
Provide which manure pits have pumpout pits and how many? Bldg 2 has 10 plUnpouls
i
Bldg 3
&
5 bave 20 pumpouts
each
TC-45-07
-- North Fork Pork, LLC
Provide a signature page with an original signature. Mailing today
...
Which City is the facility in or near? West Point, IL 62380
Provide the depths for eaeh manure pit.
Provide which manure pits have pumpout pits and how many?
TC-46-07
-- Timberline, LLC
Provide a signature page with an original signature. Mailing today ...
Which City is the facility in or near? Rushville, rr.. 62681
Provide the depths for the manure pit in Building #4.
Provide how many pumpout pits for the manure pit in Building #1, 2, and 3.
TC-47-07 -- Pinnacle Genetics, LLC
Provide a signature page with an original signature. Mailing today ...
Which City is the facility in or near? Colcbester,IL 62326
Provide the depth for tbe manure pit
in Building #1.
Provide which manure pits have pumpout pits and bow many?
TC-48-07
_. Western Creek Farms, LLC
Provide a signature page with an original signature. Maihng
today ..
Which City is the facility in or near? LaH arpc, TL 61450
Provide whieh manure pits have pumpout pits and how' many? Bldg I
&
1 have 6 pumpout, each
TC-50.07 -- Cedercrest, LLC
Provide a signature page with an original signature. Mailing today ...
Which City is the facility in or near? Table Grove, IL 6.1482
Provide the depths for each manure pit. Bldg 2
=
8' I Bldg 3
&
5 = 10'
Provide
which manure pits have pumpout pits and how many? Bldg
~
has 8 pumpollts ! Bldg 3
&
5 have 20
pl1mpolLts
each
This communication, along with any infonnatioD and attachments, is privileged and confidential and protected from disclosure and covered by federal and state law governing electronic
communication.
If the
reader
of this
message is not the intended recipient, or an employee or agent responsible"for delivering this message to the intended recipient, you are hereby notified
that any dissemination, distribution, or copying
of this
communication is strictly prohibited.
If you
have received this communication in error, please notify us by replying to the message and
deleting it from your computer. Thank you, Carthage Veterinary Service, Ltd.
Visit us at
IVW'"
.hoevet com
9/2/2008

APPLICATION FOR CERTIFICATION (PROPERTY TAX TREATMENT)
This Agency is authorized to request this
POLLUTION CONTROL FACILITY
informlltion under Illinois Revised Statues, 1979, .
AIRO
WATER.
Chapter, 120, Section 502a-5. Disclosure of this
infonnation is voluntary. However, failure to
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
comply could prevent your application from
P.
O. Box 19276,
Springfield, IL
62794-9276
being processed or oould result in denial ofyaur
application for certification.
.UK
'""E
File No.
Date Rereived
Certification No.
Date
Sec. A
Company
Name
Eagle Point Farms, LLC
Person Authorized to Receive Cerofication
Person to Contact for Additional Details
Gary
Donley
Gary Donley
Street
Address
Street Aadress
P.O.
Box
220
P.O.
Box
220
\i
MuniCIpality, State & Zip Code
Municipality.
State & Zip Code
<
0
Carthage, IL
62321
Carthage, IL
62321
..
..
"
<{
(217)
Telephone
357-2811
Number
(217)
Telephone
357-2811
Number
Location of Facility
Municipality
Township
Quarter Section
Township
Range
16
4N
1W
4N
Street Address
County
Book Number
3001
E. Quarter Roelmead
Fulton
Property laentmeation Number
Parcel Number
20-22-16-400-010
Sec.B
Nature of Operations Conducted at the Above Location
"
;;;'"
o:z
Waler Pollution Control Construction Permit No.
Date
ISSUed
~Q
or
<il!
=:;0
~w
"
..
NPDES PERMIT No.
Dale Issued
I Expiration Date .
~
Air Pollution Control Construction Pennit No.
Date Issued
Air Pollution Control Operating
Perm~
No.
Date Issued
Sec.C
Describe Unit Process
"
z
0:",
"'"
rw
Materials Used in Process
~o:
""
<0
mIm©)]}llWlID
D
<{
~
..
~
\
DEC 2 3 2007 ;.;,6
lIh\r,,.horl "
. Section
Sec. D
Describe Pollution Abatement Control Facility
BUREAU OF WATER
00
~z
Please see attached sheet
O:F
\ill>
0"
"'"
~~
s~
5"
~'"
a..if
ILS32-0222
APC
151
(Rev. 8100)
T(I); Cerlificattonfor Po/Julian Co1ftroi Facilities
Page 1 of2
8/00

Sec.E
z
I:?
:!
"
;;
z
10
1:
0
~
:t:
~
0
0:
I-
z
0
0
z
§
:l~
~;3
"
z
;::
z
0
=>
0
0
«
Sec.F
w
0:
~
~
;;;
"
Sec. G
'"
z
g
I-
0
=>
0:
l-
V>
~
(1) Nature of Contaminants or Pollutants
Material Retained Captured or Recovered .
Contaminant or Pollutant
DESCRIPTION
DISPOSAL OR USE
Swine Manure
Scread as fertilizer
(:1)
Point(s) of Waste Water Discharge
None
Plans and Specifications Attached I Ves 0
I NoD
(3)
Are contaminants (or residues) collected
by
the control facility?
1 Ves Ii!J
I NoD
(4)
Date installation completed 03/01/06
status of installation on date of application
COMPLETE
(5)
a. FAIR CASH VALUE IF CONSIDERED REAL PROPERTY:
$
2,163,000.00
b.
NET SALVAGE VALUE IF CONSIDERED REAL PROPERTY:
$
0.00
c.
PRODUCTIVE GROSS ANNUAL INCOME OF CONTROL FACILITY:
$
0.00
d. PRODUCTIVE NET ANNUAL INCOME OF CONTROL FACILITY:
$
0.00
e.
PERCENTAGE CONTROL FACILITY BEARS TO WHOLE FACILITY VALUE:
%40
The following information is submitted In accordance with the Illinois Property Tax Code, as amended, and to the best 01 my
knowledge, is true and correct. The facilities claimed herein are "pollution control facilities" as defined in Section 11-10 of the
IIl1t~0C;
CM •.
Signa~
R~i$f.tr9J,
ot
Title
INSTRUCTIONS FOR COMPILING AND FILING APPLICATION
General: Separate applications must be completed for each control facility claimed. Do not mix types (water and air). Where both air and
water operations are related, file two applications. If attachments are needed, record them oonsecutlvely on an index
sheet.
Sec. A
Sec. B
Sec.C
Sec. 0
Sec. E
Sec.F
~m~rmatlO~ ~rs
to applICant as usted m
th~
tax
~rdS a~d
tne person
t~
be
con~acted
for further
~~ai1s o~,~~r in~""7',on
ot
facilities. Define facility ioeallon by street addl1lss or legal descnption. A pial map loeation is requil1!d fur faamies loealed
outside of municipal boundaries. The property identification number
is
required.
SeW-explanatory. Submtt copies of all permas issued by local pollution control agencies. (e.g. MSD Construction Permtt)
Refers
to
manufacturing processes or meterials on which pollution control facility is used.
Narrative description of Ihe pollution conlral facility, indieating that its primary purpose is to etiminate, prevent or l1!duoe pollution.
State the type of control fecillty. State permH number, date, and agency issuing permit. A narrative desaiption and a process
flow diagram descrlblng the pollution control faCility. Include a listing of each major piece of equipmenllnduded in the claimed
fair cash value for real property. Include an
~
analysis
of the
influent and effluent of the control facility stating the
collection efficiency.
List air contaminants, or water pollution substances released as effluents fa
the
manufacturing processes. List also the fmal
disposal of any contaminants removed from the manufacturing processes.
Item (1) - Refers to pollutants and contaminants removed from the process by the pollution control facility.
Item
(2) -
Refers to water pollution but can apply
to
water<:arried wastes from air pollution oontrol faciltties. SuIlmtt drawings,
which clearty ,how (a) Point(s) of discharge
10
I1lceiving stream, and (b) Sewers and process piping to and from the control
facilily.
Item (3) - tithe collected oontamlnants are disposed of otner than as wastes, state the disposition of the matenals, and the value
In donars redaimed by sale or reuse of the colJeced substances. State the cost of reclamation and related expense.
Item (4) - State the date whlcl1lhe pollution control
fa~liIy
was
fl.'Sl
placed in service and operated. If not, explain.
Item (5) - This infonnation
is
essential to the certification and assessmen1 actions. This accounting data must be completed to
activate projed. review prior to certification
by
this Agency.
Setf-explanatory. Signature must be a corporate authorized signature.
Submftto:
lHinois EPA
P.O. Box
19276
Spnngfield, IL
62794-9276
Attention;
AI Keller
Pennft Section
Division ofWster PoUution Control
Tax Certification/or Pollution Control Facilities
Page
2
of2
8100
Attention:
Donald E. Sutton
Permit SectIon
Division of Air Pollution Conlrol

Attached Sheet in Support of Application for Certification of Pollution Control Facility
For Eagle Point LLC
Page I Section D of the form -
Eagle Point LLC is a swine farm with 5 separate buildings.
Each of these building has manure storage capacity in below ground level concrete pits.
Also integrated into the design is specially designed flooring material that separates the
animals from the manure holding area yet allows the manure to pass
thru
the floor into
the holding area. The flooring in buildings 1 & 4 have a combination of slatted plastic &
cast iron flooring that allows for manure to pass
thru
into the below ground storage pits.
Buildings 2, 3,
&
5 have slatted floor made of concrete, re-enforced with steel.
Buildings I
&
4 (from diagram below) have manure pits that drain into, thru underground
piping, buildings 2, 3,
&
5. This underground piping consists of8" PVC pipe; these lines
are approximately 50 feet long, the distance between buildings. Buildings 2, 3,
&
5 have
deep concrete (8'
&
10') pits below them that will retain approx 12 months worth of
manure produced by the animals at the farm. Manure is retained by these structures to
prevent it from leaving the farm and reaching surrounding water sources. The nearest
body of water is approx
114
of a mile from the building site. Multiple times each year the
manure is pumped out of the pits and injected into surrounding farmland at
ergonomically appropriate rates. Each of the buildings with deep pits have multiple
pump out locations located on the longer sides of the buildings. These pump out
locations are approx 4 feet square and are made of concrete
&
steel. They are poured as
floors and walls of the building are constructed. This feature allows for portable pumps
to be lowered into the pits from the outside of building.
Collection efficiency of this design of pollution control facility is 100%.
On the accompanying diagram the buildings are identified as 1-5 with approx.
dimensions listed at the top of each. Arrows between buildings indicate the direction and
flow of manure from one building
to
another.
.

J
Second Attached Sheet in Support of Application for Certification
of Pollution
Control Facility
For Eagle Point LLC
Page 1 Section D of the fonn -
Eagle Point Bldg Layout
81 x 928
77 x 720
Pond
I--
1/4
Mile
Bldg 5
Bldg 4
Deep Pit
77x 720
81 x 201
34x 81
L----J~D
Bldg 3
Bldg2
Bldg 1.
Deep Pit
Deep Pit

Back to top