BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOIS
AMERICAN BOTTOM CONSERVANCY,
)
)
Petitioner,
)
)
v.
) PCB No. 2006-171
) (3
rd
Party NPDES Permit Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY, and UNITED
)
STATES STEEL CORPORATION -
)
GRANITE CITY WORKS,
)
)
Respondents.
)
UNITED STATES STEEL CORPORATION’S RESPONSE BRIEF ON REMAND
Respondent, United States Steel Corporation - Granite City Works (“U. S. Steel”),
submits its Response Brief on Remand from the Fifth District Illinois Appellate Court, and
requests that Petitioner American Bottom Conservancy’s (“ABC”) Petition for Review of a
Decision by the Illinois Environmental Protection Agency (“IEPA”) and request for a public
hearing to IEPA be denied. In support of its Brief, U. S. Steel states as follows:
INTRODUCTION
On remand from the Fifth District Appellate Court, there is only one issue before the
Board: whether IEPA abused its discretion by not holding a public hearing on the proposed
NPDES permit for U. S. Steel’s Granite City Works facility. As a review of the administrative
record and relevant law shows, IEPA did not abuse its discretion in denying ABC’s request for a
public hearing.
The central regulation involved in this case, 35 Ill. Adm. Code § 309.115(a) provides that
IEPA “shall hold a public hearing on the issuance . . . of an NPDES Permit . . .
whenever the
Agency determines
that there exists a significant degree of public interest in the proposed permit .
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
2
. . (instances of doubt shall be resolved in favor of holding the hearing), to warrant the holding of
such a hearing.” (emphasis added) During the public comment period for the proposed NPDES
permit for U. S. Steel’s Granite City Works, two letters were submitted to IEPA on January 17
and 18, 2005 that requested a public hearing under 35 Ill. Adm. Code § 309.115(a). IEPA
properly found that the January 17 and 18, 2005 letters did not demonstrate that a public hearing
was warranted. IEPA exercised its discretion in denying the public hearing requests because,
while the requests may have raised concerns about Horseshoe Lake generally, they failed to
establish a sufficient interest particular to the proposed NPDES permit to warrant a public
hearing on the proposed permit. As thoroughly explained below, IEPA’s determination that a
public hearing was not warranted was not arbitrary, without using conscientious judgment, or an
overstepping of the bounds of reason. In other words, IEPA did not abuse its discretion.
ABC raises a litany of issues in comments sent to IEPA after the close of the public
comment period, in the petition that it filed with the Board to appeal U. S. Steel’s permit, and in
its brief that were not raised in any comments to IEPA during the public comment period for the
proposed permit. Such a strategy ignores the rule that the Board cannot consider any issues that
were not raised during the public notice period.
See
415 ILCS 5/40(e)(2)(A). Thus, IEPA was
justified in ignoring those issues that were not raised in the January 17 or January 18, 2005
letters when determining whether to hold a public hearing on the proposed NPDES permit.
Similarly, the Board should ignore any arguments or facts that were not included in the letters.
Given that ABC has failed to point to any portions of the January 17 or 18, 2005 letters that
demonstrate a significant degree of public interest in the proposed NPDES permit for Granite
City Works to warrant a public hearing, IEPA did not abuse its discretion in denying the public
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
3
hearing requests. Accordingly, ABC’s Petition for Review and request for a public hearing
should be denied.
BACKGROUND FACTS
I.
IEPA’s issuance of the Permit and denial of ABC’s request for a public hearing.
On October 14, 2002, U. S. Steel submitted to IEPA an application to renew its NPDES
permit for its U. S. Steel facility located in Granite City, Illinois. R 135-155.
1
After conducting
a thorough analysis of the facility and its discharges into Horseshoe Lake, on December 19,
2004, IEPA issued a proposed NPDES permit for the Granite City facility (the “Proposed
Permit”), which would allow the facility to continue to discharge into Horseshoe Lake in
compliance with Illinois water quality standards. R 518-523. The Proposed Permit stated that
the public notice period started on December 19, 2004 and ended on January 18, 2005. R 518.
The Notice for the Proposed Permit stated that “If written comments or requests indicate a
significant degree of public interest in the draft permit, the permitting authority may, at its
discretion, hold a public hearing. . . . For further information, please call Beth M. Burkard [at
IEPA].” R 518. The Proposed Permit further provided:
Any interested person may submit a written request for a public
hearing on the draft permit, stating their name and address, the
nature of the issues proposed to be raised and the evidence
proposed to be presented with regards to these issues in the
hearing. Such requests must be received by the Agency not later
than 30 days from the date of this publication.
If written comments and/or requests indicate a significant degree
of public interest in the draft permit, the permitting authority may,
at its discretion, hold a public hearing.
R 522.
1
Citations of “R ___,” will be to the Administrative Record filed on June 5, 2006, “C ___,” will be to the Board’s
Record that was prepared for and filed with the Appellate Court, which includes ABC’s Second Supplement to the
Administrative Record filed on November 6, 2006, and “Trans. ___,” will be to the Transcript from the November
20, 2006 hearing before the Chief Administrative Officer.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
4
On January 17, 2005, Kathleen Logan Smith submitted a comment to IEPA on behalf of
the Health & Environmental Justice - St. Louis (“HEJ”). R 532. That letter requested that IEPA
hold a public hearing on the Proposed Permit, but did not describe the issues that would be raised
or evidence that would be presented if a hearing were held.
Id.
The letter asserted that the
Proposed Permit would allow lead to be discharged into Horseshoe Lake.
Id.
However,
U. S. Steel does not use lead in its processes. R 601. The letter did not state or describe any
evidence to support its assertion about lead, nor did it indicate that such evidence could
reasonably be expected to be presented if a public hearing on the Permit were held. The letter
did not identify any regulations or sections of the Illinois Environmental Protection Act (the
“Act”) that would be violated if the permit were issued as it was drafted. R 532.
On January 18, 2005, Katherine Andria and four other individuals submitted comments
on behalf of ABC, HEJ, Neighborhood Law Office (East St. Louis), Sierra Club, and Webster
Groves Nature Study Society and requested that a public hearing be held. R 537-539. The
January 18, 2006 letter commented that Horseshoe Lake is impaired for PCBs, pH, suspended
solids, excessive algal growth, ammonia (unionized), nutrients, phosphorus, total and ammonia-
N, and that “[w]e have seen fish caught at Horseshoe Lake with melanoma.” R 537. However,
Ms. Andria did not, and could not, state that IEPA had determined that U. S. Steel caused
Horseshoe Lake to be impaired, and did not provide any further information regarding her claim
about the alleged fish with melanoma. The letter also stated that Professor Richard Brugam at
Southern Illinois University at Edwardsville showed that the testing of sediments in Horseshoe
Lake shows high concentrations of lead. R 537. Yet, ABC never provided IEPA a copy or even
a citation to a copy of any report or study by Professor Brugam even though ABC claimed to
have a copy of the report. R 539.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
5
The January 18, 2005 letter also raised lead discharges as a concern, even though
U. S. Steel does not use lead in its processes. R 601. The Proposed Permit set a limit for lead
because the regulations at 40 C.F.R. § 420 require lead limits in NPDES permits for steel mills
even if they do not use lead or increase the amount of lead in their waste water discharges. C
286; R 601. The letter also raised concerns about high cadmium levels in a lake connected to
Horseshoe Lake. R 537. Cadmium, however, was not even detected in U. S. Steel’s water
discharges. R 342. Thus, this comment is not relevant to U. S. Steel’s permit.
The letter also raised questions about U. S. Steel’s Granite City facility’s compliance
history. R 537-38. However, compliance issues are addressed through a different mechanism by
IEPA, and not by its permit writers. Finally, the letter stated “We ask that you hold a public
hearing in order to allow citizens to ask questions and present information and testimony.” R
539. ABC’s letter failed to describe any testimony or evidence that would be presented or to
identify any provisions of the Act or regulatory standards for the protection of water quality that
would be violated if the permit were issued as drafted. R 537-539. The letter concludes by
stating that “If you deny this request for a hearing, we ask for a meeting with you and your staff,
. . .” R 539.
After considering public comments and analyzing the allowable discharge limits for the
facility, IEPA determined that a hearing on the permit was not warranted because none of the
comments would lead IEPA to make any changes to the Proposed Permit. C 286, 288. On
March 8, 2006, IEPA issued a final permit (the “Final Permit”) for U. S. Steel’s facility. R 637-
643. On March 31, 2006, IEPA reissued the Final Permit to coincide with its issuance of the
responses to the comments it received. C 109, C 112, and C 115-119. The effective date of the
Final Permit was April 1, 2006.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
6
II.
Review by the Board and the Fifth District Appellate Court.
On May 4, 2006, ABC filed its Petition for Review to the Illinois Pollution Control Board
raising numerous issues that ABC did not raise during the public comment period and alleging,
among other things, that IEPA improperly denied ABC’s request for a public hearing on the
Proposed Permit. C 13-14. In response, U. S. Steel and IEPA filed motions to dismiss, and on
September 21, 2006 the Board dismissed all issues except whether IEPA should have held a
public hearing on the Proposed Permit. C 197-204. Accordingly, the only issue that proceeded
to hearing was whether IEPA should have held a public hearing regarding the Proposed Permit.
On November 20, 2006, a hearing was held before the Board’s Hearing Officer on whether IEPA
improperly denied ABC’s request for a public hearing. Trans. 1.
On January 26, 2007, the Board issued an Order finding that IEPA’s decision not to hold
a public hearing prior to the issuance of the Final Permit violated 35 Ill. Adm. Code §
309.115(a)(1) of the Board’s regulations. C 477-491. Specifically, the Board found “that the
two public comments filed in this case evidence a significant degree of public interest in the
proposed permit.” C 490. Moreover, the Board held that “In reviewing the Agency’s decision
not to hold a public hearing, the Board applies the standard applicable to all reviews of an
Agency’s permit decision - whether or not the issuance of the permit violates the Act or Board
regulations. Thus, the Board does not apply an ‘abuse of discretion’ standard as advocated by
U.S. Steel.” C 489. On March 9, 2007, U. S. Steel filed an Amended Motion to Reconsider that
requested that the Board reconsider all aspects of its January 26, 2007 Order. On
March 12, 2007, IEPA also filed a Motion to Reconsider to the Board. On May 3, 2007, the
Board denied both Motions to Reconsider. C 599-600.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
7
On May 25, 2007, U. S. Steel filed a Petition for Review of the January 26, 2007 and
May 3, 2007 Orders to the Fifth District Appellate Court. IEPA also filed a Petition for Review
of the Orders on June 5, 2007. On July 22, 2008, the Appellate Court issued an opinion granting
U. S. Steel’s and IEPA’s Petitions for Review, vacating the Board’s Orders, and remanding the
case for further consideration.
U. S. Steel, Corp. v. Illinois Pollution Control Board
, 892 N.E.2d
606, 613 (5
th
Dist. 2008). The Appellate Court found that the Board employed the incorrect
standard of review for determining whether IEPA had erred in denying ABC’s request for a
public hearing, and that IEPA has discretion “to determine when and if there is a significant
degree of public interest in a proposed permit.”
Id.
at 611. Accordingly, the Court provided that
“we vacate the final order of the Board invalidating the NPDES permit issued to U.S. Steel and
remand this cause to the Board for review using the correct standard of review.”
Id.
at 612-13.
The Court provided further instructions on remand for determining whether IEPA acted within
its discretion:
In determining whether the permit as issued violates the Act or
regulations because the Agency did not hold a public hearing, the
Board must use an abuse-of-discretion standard. It must review
the Agency's decision not to hold a public hearing to determine
whether the agency made an arbitrary decision, without using
conscientious judgment, or if, in view of all the circumstances, the
Agency overstepped the bounds of reason, ignored the law, and
thereby caused substantial prejudice.
In re Marriage of Munger
,
339 Ill. App. 3d 1104, 1107, 791 N.E.2d 573, 274 Ill. Dec. 481
(2003). Only if the Agency abused its discretion in failing to hold
a public hearing would the permit as issued violate the Act or
regulations.
Id.
at 613. The case is now before the Board on remand for a determination as to whether IEPA
abused its discretion in denying ABC’s request for a public hearing.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
8
ARGUMENT
I.
Standard of review.
A.
Abuse of discretion for IEPA’s denial of ABC’s request for public hearing.
Under 35 Ill. Adm. Code § 309.115(a)(1), IEPA determines whether a party has
demonstrated a significant degree of public interest sufficient to warrant the holding of a public
hearing. The regulation provides:
a) 1) The Agency shall hold a public hearing on the issuance or
denial of the an NPDES Permit or group of permits
whenever the
Agency determines
that there exists a significant degree of public
interest in the proposed permit or group of permits (instances of
doubt shall be resolved in favor of holding the hearing), to warrant
the holding of such a hearing.
35 Ill. Adm. Code § 309.115(a)(1)(emphasis added). As the Appellate Court found, “[t]he
unambiguous and plain language of section 309.115(a) vests discretion in the Agency to hold a
public hearing
whenever it determines
that there exists a significant degree of public interest in
the proposed permit. The regulations do not state that the Agency must hold a hearing
whenever
there is a significant degree of public interest.
It states that the Agency must hold a public
hearing whenever
it determines
that there is a significant degree of public interest in the permit.”
U. S. Steel
, 892 N.E.2d at 611 (emphasis in original).
Under the abuse of discretion standard, an agency abuses its discretion when it makes a
decision “without employing conscientious judgment or when the decision is clearly against
logic.”
Deen v. Lustig
, 337 Ill. App. 3d 294, 302, 785 N.E.2d 521, 529 (4th Dist. 2003) (citing
Bodine Electric of Champaign v. City of Champaign
, 305 Ill App. 3d 431, 435, 711 N.E.2d 471,
474 (4th Dist. 1999) (“the question is whether . . . the court exceeded the bounds of reason and
ignored recognized principles of law so that substantial prejudice resulted.”));
see also Whirlpool
Corp. v. Certain Underwriters at Lloyd’s London
, 295 Ill. App. 3d 828, 839, 692 N.E.2d 1229,
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
9
1237 (1st Dist. 1998);
Modine Manufacturing Co. v. PCB
, 192 Ill. App. 3d 511, 519, 548
N.E.2d 1145, 1150 (2d Dist. 1989) (no abuse of discretion unless the agency acted “unreasonably
or arbitrarily.”) As the Appellate Court in this case stated, the Board “must review the Agency’s
decision not to hold a public hearing to determine whether the agency made an arbitrary
decision, without using conscientious judgment, or if, in view of all the circumstances, the
Agency overstepped the bounds of reason, ignored the law, and thereby caused substantial
prejudice.”
U. S. Steel
, 892 N.E.2d at 613. Under this standard of review, IEPA did not abuse
its discretion and properly denied ABC’s request for a public hearing on the Proposed Permit.
ABC attempts to nullify the abuse of discretion standard by arguing that “the regulation
hems in that discretion in three critical respects.” ABC Br. at 4. Most notably, ABC argues that
“the regulation states that IEPA ‘shall’ - not ‘may’ - hold a public hearing when there is
significant public interest in the permit,” implying that IEPA’s discretion to determine if there is
significant public interest is somehow limited.
Id.
This argument ignores the Appellate Court’s
ruling that specified the inquiry on remand.
U. S. Steel
, 892 N.E.2d at 613. The Appellate Court
thoroughly reviewed 35 Ill. Adm. Code § 309.115(a)(1), and did not find that the “shall” in the
regulation hemmed IEPA’s discretion. The Court repeatedly emphasized that IEPA has the
discretion to determine whether there is a significant public interest in a proposed permit to
warrant a public hearing, and not that “the Agency must hold a hearing
whenever there is a
significant degree of public interest
.”
U. S. Steel
, 892 N.E.2d at 611 (emphasis in original).
Indeed, the Court held that the 35 Ill. Adm. Code § 309.115(a)(1) provided that “the Agency
must hold a public hearing whenever
it determines
that there is a significant degree of public
interest in the permit.”
Id.
(emphasis in original). As a result, ABC is wrong that IEPA must
hold a public hearing “when there is a significant public interest in the permit.” (ABC Br. at 4),
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
10
Instead, a public hearing is only required when IEPA determines, within its discretion, that there
is a significant degree of public interest in a proposed permit to warrant a public hearing.
B.
IEPA’s review was limited to only the comments and issues raised during the
public notice period.
The Illinois Environmental Protection Act provides that only issues raised during the
public notice period for a proposed NPDES permit can be the basis for a third party appeal of
IEPA’s issuance of a NPDES permit, and requires a third party petitioner to make “a
demonstration that the petitioner raised the issues contained within the petition during the public
notice period . . .” 415 ILCS 5/40(e)(1)(A). Moreover, 35 Ill. Adm. Code § 309.115(a)(2)
provides that a request for a public hearing “shall be filed with[in] the 30-day public comment
period . . .” Under these two provisions, the only issues that ABC can raise in this appeal are the
issues that were stated during the public notice period from December 19, 2004 to January 18,
2005. R 518. Thus, the only issues that can be raised now are issues that were raised in the two
letters, the January 17, 2005 and January 18, 2005 comments, from five individuals who claim to
represent the various organizations.
2
The Appellate Court recognized that review is limited to
“requests for a public hearing that are filed within the public comment period and that indicate
the party’s interest and why a hearing is warranted . . .”
U. S. Steel
, 892 N.E.2d at 611. Because
ABC is limited to raising only the issues that were before IEPA in those two letters, any
testimony from the November 20, 2006 hearing or other factual assertions that were not raised in
the January 17 and January 18, 2005 letters should be disregarded in determining whether IEPA
abused its discretion in denying ABC’s public hearing request, as such testimony and
information that was not before IEPA when it made its decision that is at issue in this case.
2
ABC not only submitted comments on January 18, 2005, but also submitted comments on October 3, 2005 and
December 9, 2005. These comments, however, were received outside of the public notice period for the Proposed
Permit that ended on January 18, 2005. R 518. Accordingly, IEPA justifiably disregarded these comments under
415 ILCS 5/40(e) and 35 Ill. Adm. Code § 309.115(a)(2).
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
11
II.
IEPA did not abuse its discretion in denying ABC’s request for a public hearing.
A.
ABC failed to present any evidence of public interest specific to the Proposed
Permit that would warrant holding a public hearing.
The regulations at 35 Ill. Adm. Code § 309.115(a)(1) provide that IEPA “shall hold a
public hearing on the issuance . . . of an NPDES Permit . . . whenever the Agency determines
that there exists a significant degree of public interest
in the proposed permit . . . to warrant the
holding of such a hearing
.” (emphasis added). In other words, ABC must demonstrate that the
public interest is not generally in Horseshoe Lake or some other aspect of IEPA’s regulation of
discharges to Horseshoe Lake, but the interest must be specific to the NPDES permit proposed
by IEPA to be issued to U. S. Steel’s Granite City Works.
U. S. Steel
, 892 N.E.2d at 611. The
January 17 and 18, 2005 comments failed to raise any public interest specific to the Proposed
Permit, and, thus, IEPA did not abuse its discretion in denying ABC’s request for a public
hearing.
The January 17, 2005 and January 18, 2005 comments do not demonstrate that there was
a significant degree of public interest in the Permit. Instead, the comments discuss issues
unrelated to the Proposed Permit. For instance, the January 17, 2005 comment states that
discharges of lead from the Granite City Works facility over a period of years “would add up to
hundreds of pounds and may have a serious detrimental effect on organisms living in the lake.”
R 532. HEJ, however, was unable to state that the alleged lead discharges would violate any
water quality standard or other regulation, such that the discharges under the Proposed Permit
limits would be illegal. Contrary to the implications of the comments, U. S. Steel does not use
lead in its processes. R 601. HEJ failed to provide evidence to support its contention about lead
discharges to the Lake and failed to identify any such evidence that could reasonably be expected
if a public hearing were held. In other words, the comment may involve an issue with regard to
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
12
Horseshoe Lake generally or an issue that is attributable to other sources, but it does not address
any particular provision in the Proposed Permit, or indicate that a hearing on the subject could
reasonably be expected to illicit relevant information. Accordingly, ABC failed to demonstrate
that the January 17, 2005 comment shows that there was a public interest that was particularly
connected to the Proposed Permit. Thus, IEPA did not abuse its discretion by failing to provide
a public hearing on this issue.
Similarly, the January 18, 2005 letter states that Horseshoe Lake is impaired for various
pollutants. That issue, however, is properly addressed through the section 303(d) process related
to impaired waters and the development of a total maximum daily load under section 303(d) of
the federal Clean Water Act, and not during the NPDES permitting process for individual
permits. ABC is aware of that fact, as Ms. Andria from ABC was actively involved in the
section 303(d) listing process for Horseshoe Lake, and attended a public hearing regarding
303(d) listed water bodies that addressed the impairment of Horseshoe Lake. Trans. 56, 84; C
286. (“As a final note, it should be mentioned that the American Bottom Conservancy did
participate in a recent hearing regarding 303(d) listed water bodies and did make specific
comments regarding Horseshoe Lake.”) As stated in section III,
infra
, IEPA accommodated
ABC with numerous opportunities for their concerns to be heard, yet it was ABC that failed to
take advantage of those opportunities.
The January 18, 2005 letter also raises the compliance history of the Granite City Works
facility with its permit limits by citing information from an U.S. EPA Enforcement and
Compliance Online (ECHO) report. This issue, however, is not a permitting issue, but involves
IEPA’s enforcement of permit limits and was being addressed under relevant enforcement
mechanisms. R 604. (“The IEPA and US EPA have monitored the compliance and have taken
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
13
appropriate actions in response to permit exceedences.”) Further, the information in the ECHO
report can be misleading because a single exceedence in a grab sample or 24-hour composite
sample during a quarter appears in the ECHO report as a violation for the quarter. R 556, 604.
A person who is not familiar with the report or does not investigate further could end up with the
misimpression that a facility with a violation in a single sample for a single parameter was out of
compliance for the whole quarter. If ABC has an issue with IEPA’s enforcement of NPDES
permit limits, such an issue should be taken up with IEPA’s enforcement division, and not
IEPA’s NPDES permit writer.
In addition, ABC argues that IEPA should have held a public hearing because fish were
allegedly caught with melanoma in Horseshoe Lake. ABC Br. at 19-20. This argument should
be rejected because it is based on speculation, not admissible evidence. Specifically, the January
18, 2005 letter stated that “We have seen fish caught at Horseshoe Lake with melanoma. An
IDNR fish biologist confirmed fish with melanoma at Horseshoe.” R 537. U. S. Steel provided
a comment on this issue, which IEPA considered. R 603 (“US Steel feels the fish with
melanoma statement to be anecdotal.”) IEPA then analyzed the issue, but found ABC’s
statement to be inconclusive.
Id.
(“More information is needed on the fish with melanoma issue
- was this reported as part of an IDNR study, or did one fish appear with melanoma, and was
confirmed by an IDNR fish biologist?”) IEPA’s response to ABC’s vague comment was entirely
appropriate, and IEPA did not abuse its discretion in not using ABC’s comment to hold a public
hearing. There is no evidence in the record of any specific finding of fish in Horseshoe Lake
with melanoma. More importantly, there is no evidence that U. S. Steel’s discharges cause
melanoma in fish in Horseshoe Lake. No expert or scientific testimony was submitted during the
public comment period (or even at the November 20, 2006 hearing) that would make such a
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
14
connection. ABC’s argument is based on nothing other than conjecture that U. S. Steel is
responsible for a problem that may or may not exist in fish in Horseshoe Lake. ABC’s
unsubstantiated comments are not sufficient to determine that IEPA should have held a public
hearing to receive comments on the issue. Because ABC did not establish that there was an
increased rate of melanoma in Horseshoe Lake and could not connect its alleged observations of
melanoma with the Proposed Permit, IEPA did not abuse its discretion in finding that there was
no significant public interest specific to the Proposed Permit and that a public hearing on the
Proposed Permit was not warranted.
ABC’s comment letter also charged that “Canteen Lake, which is part of the same lake,
but privately owned, tested high in cadmium.” R 537. Again, this comment would not have
affected the issuance of U. S. Steel’s permit as cadmium was not detected by the facility in its
effluent samples, “nor was any [cadmium] in 19 Agency samples.” R 342. The Agency
concluded “that no regulation of cadmium is necessary and that no monitoring beyond the
routine requirements is needed.”
Id.
This lack of connection between ABC’s comments and
U. S. Steel’s permit further documents that IEPA did not abuse its discretion by not holding a
public hearing on the draft permit.
In the end, ABC fails to show that IEPA abused its discretion in finding that a public
hearing was not warranted and that the January 17 and 18, 2005 requests did not establish a
significant degree of public interest in the Proposed Permit.
B.
ABC improperly attempts to shift the burden of proof for establishing a
significant degree of public interest.
ABC argues that because it stated in the January 18, 2005 letter that Professor Brugam
had studied bottom sediments in Horseshoe Lake, and because IEPA did not sufficiently
investigate Brugam’s studies, IEPA was required to hold a public hearing to resolve the issue.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
15
ABC Br. at 18. This argument is wrong. First, ABC implies that it was IEPA’s burden to
analyze Brugam’s studies, and that IEPA failed to “seek or obtain a copy of the study.”
Id.
As
the case law clearly states, “the party requesting a public hearing has the burden of showing why
it is warranted.”
Borg-Warner Corp. v. Mauzy
, 100 Ill. App. 3d 862, 867, 427 N.E.2d 415, 419
(3d Dist. 1981);
see also U. S. Steel
, 892 N.E.2d at 611. Thus, it was ABC’s burden to provide
Brugam’s study to IEPA, or to communicate the substance of Brugam’s study to IEPA. ABC
even admitted in its January 18, 2005 letter “that studies had been obtained only recently and had
not been reviewed thoroughly by the commentors.” ABC Br. at 18. (emphasis added). This begs
the question, why did ABC withhold the Brugam studies instead of simply submitting them to
IEPA if they were critical to addressing the Proposed Permit? ABC does not answer that
question, and instead tries to shift its error to IEPA, who in fact attempted to analyze the study by
downloading an abstract of a study from the Internet, even though “The commentors did not
provide a copy of the study, and thus it is not possible to know the nature of the study.” R 604.
IEPA properly analyzed the issue with the information that was provided to it during the public
notice period. Any lack of information that was not before IEPA was ABC’s own doing.
Perhaps the reason that ABC did not provide a copy of the study is that ABC knew that Brugam
concluded that the source of the lead sediments was the lead smelters in the area and particularly
NL Industries. Indeed, during the hearing Ms. Andria stated “It is clear that most of the lead in
the sediment from 1900 to the present represents anthropogenic input. We believe that the major
source of this lead was the National Lead Industry smelter in Granite City.” Trans. 82. NL
Industries is a Superfund site due to lead contamination. Trans. 78. Accordingly, ABC did not
meet its burden and IEPA did not abuse its discretion in not holding a public hearing as a result
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
16
of any information that ABC submitted in its January 18, 2005 letter regarding Professor
Brugam’s studies.
C.
ABC improperly raises issues that were not raised in its comments.
In determining whether there is a significant degree of public interest in a proposed
permit, IEPA makes that determination “based on requests for a public hearing that are filed
within the public comment period and that indicate the party’s interest and why a hearing is
warranted . . .”
U. S. Steel
, 892 N.E.2d at 611. ABC, however, insists on raising issues in its
brief that were not raised in the January 17 or January 18, 2005 comments.
For example, ABC argues that IEPA failed to ensure that U. S. Steel’s discharges are in
compliance with the narrative water quality standard that provides that “Waters of the State shall
be free from sludge or bottom deposits, floating debris, visible oil, odor, plant or algal growth,
color or turbidity of other than natural origin.” 35 Ill. Adm. Code § 302.203. This argument
should be disregarded because it was not raised in either the January 17 or January 18, 2005
comments during the public comment period. R 532, 537-539. Nor was the issue even raised in
ABC’s Petition. Thus, according to the Board’s earlier decision on U. S. Steel’s and IEPA’s
Motions to Dismiss on September 21, 2006, because issues involving narrative water quality
standards were not raised during the public notice period, they cannot be asserted now as part of
ABC’s Petition.
See
415 ILCS 5/40(e); 35 Ill. Adm. Code § 309.115(a)(2);
see also U. S. Steel
,
892 N.E.2d at 611.
ABC also argues in its brief that it is “troubling” that IEPA did not investigate Horseshoe
Lake sediments because the Proposed Permit allowed U. S. Steel “to discharge up to 4,380
pounds of zinc and 2,044 pounds of lead into the Lake each year.” ABC Br. at 19. There are
critical flaws with ABC’s arguments. First, like the narrative water quality standard argument,
ABC did not raise this issues in its January 18, 2005 letter, nor did HEJ raise the issues in the
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
17
January 17, 2005 letter. In fact, neither letter raised any concerns with zinc. Thus, the
arguments related to zinc are not properly raised now pursuant to 415 ILCS 5/40(e)(2), as zinc
issues were never before IEPA during the public notice period. R 532, 537-539. With respect to
lead, ABC’s arguments, even if they had been properly raised, are without merit as U. S. Steel
does not use lead in its process and the loading limits that appear on paper in the permit are
calculated from allowable levels in the federal standards at 40 C.F.R. 420 that apply to
U. S. Steel’s operations. R 601; C 286. Further, merely stating the total amount that a permit
would allow to be discharged over the course of a year does not address the central issue of
whether U. S. Steel’s discharges under the Proposed and Final Permits violate water quality
standards. Again, ABC has not submitted any evidence that shows that IEPA’s issuance of the
Final Permit will cause a violation of the Act or any regulation. ABC has not met its burden to
prove that the Final Permit should not have been issued. Accordingly, IEPA’s denial of ABC’s
public hearing request and issuance of the Final Permit was not an abuse of discretion.
3
In addition, ABC charges in its brief that because U. S. Steel allegedly failed chronic
toxicity tests in the past, and because IEPA removed toxicity testing requirements from the
Proposed Permit before it issued the Final Permit, there is somehow a concern that justifies a
public hearing. ABC Br. at 20. As with numerous other issues raised in its brief, this issue was
not raised during the public notice period, is not properly before the Board, and, thus, should be
disregarded. 415 ILCS 5/40(e)(2). Assuming
arguendo
that it is properly before the Board,
ABC’s argument is factually incorrect. Numerous results of whole effluent toxicity tests are in
the record.
See
R 1-3, R 65-89, R 156-252, R 272-273. Of the eight acute toxicity tests that
3
ABC also raises in its comment letter that “Granite City Steel . . . would be allowed to put additional ammonia
into the lake.” R 537. However, the record is clear that the limits for ammonia were set at levels protective of the
new water quality standards for Horseshoe Lake. R 545, 508-509. Further, ammonia degrades in the environment.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
18
were performed, none of them determined that the effluent was toxic, even at 100% effluent
concentrations.
Id
. The chronic test that ABC is referring to was a study that compared the
growth rate of green algae (
selenastrum capricornutum
) in Granite City Works’ effluent to its
growth in water from Horseshoe Lake. R 156. Initially, this study found that the algae did not
grow as well in the effluent as it did in water from Horseshoe Lake. R 157, 158, 168. Given that
Horseshoe Lake is impaired for nutrients because the nutrients levels are to high and for
excessive algae growth (R 519) the possibility exists that the difference in growth rates was
attributable to higher nutrient levels in the lake water. Further, a repeat of this test determined
that “The effluent sample was not chronically toxic to [green algae] at all concentrations tested.”
R 158. ABC failed to mention in its brief that the same report included chronic toxicity tests on
daphnia (
Ceriodaphnia dubia
) and fathead minnows, and concluded that “The effluent samples
were not chronically toxic to
Ceriodaphnia dubia
through the 100 percent concentration.” R
158. In addition, “The effluent samples were not chronically toxic to fathead minnows through
the 100 percent concentration.” R 158, 170. When reviewing the permit application, IEPA
analyzed the tests of the effluent toxicity and found that “A review of recent whole effluent
toxicity test results found that no acute toxicity was present in the effluent.” R 478. Thus, IEPA
correctly concluded that amount of whole effluent toxicity testing could be reduced. “This
significantly reduced the burden of toxicity testing,” and only required Acute Toxicity Screening
for
Ceriodaphnia
and fathead minnow. R 478-479. Accordingly, this issue was properly
considered by IEPA, and resulted in the testing being taken out of the Final Permit.
Moreover, at the hearing and in its brief, ABC and its witnesses spent a considerable
amount of time testifying that many people use Horseshoe Lake State Park and that the
ecosystem has a diversity of habitat.
See e.g.,
Trans. 113-114. (“It is a fantastic place for all
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
19
different types of birds because it has a variety of habitat. . . . It’s a good place to look at
butterflies, for the same reason it’s got a diversity of habitat.”);
see also
, ABC Br. at 14-15. Yet
ABC ignores the fact that the steel mill now owned by U. S. Steel has operated under previous
NPDES permits and that the NPDES permit at issue is merely a renewal of an existing permit
that essentially maintains the status quo. R 135.
4
In fact, the water discharged by Granite City
Works helps to keep the lake from drying up during periods of drought and thus, helps maintain
critical habitat. R 600. (“The Department [of Conservation] finds the discharge beneficial; it
sustains a constant normal pool for the lake. Without it, this would not be the case. . . .”).
5
ABC has not been able to point to any evidence in the January 17 and January 18, 2005
letters that suggests that there was a significant degree of public interest in the Proposed Permit.
Accordingly, IEPA did not abuse its discretion in denying ABC’s public hearing request.
D.
IEPA properly determined that ABC failed to demonstrate a significant
degree of public interest in the Proposed Permit to warrant a public hearing
on the Proposed Permit.
Again, according to 35 Ill. Adm. Code § 309.115(a)(1), IEPA will hold a public hearing
if it determines “that there is a significant degree of public interest in the proposed permit” to
warrant a public hearing on the proposed permit. In determining the statutory meaning of the
words “significant degree of public interest,” the words are to be applied according to their plain
and ordinary meaning.
People v. Whitney
, 188 Ill. 2d 91, 97, 720 N.E.2d 225, 228 (Ill. 1999)
4
The permit limits in the renewal permit increased for lead, zinc and ammonia because the load limits for lead and
zinc are based on the federal categorical limits at 40 C.F.R. 420, which are production-based and because the
ammonia water quality standard in Horseshoe Lake changed. R 601. It should also be noted that the concentration-
based limits were set to meet the water quality standards for Horseshoe Lake.
See
Correspondence from Alan Keller
at IEPA,
dated April 10, 2006 (as attached to ABC’s First Motion
to Supplement the Record), p. 3 (“the Agency has
concluded that the NPDES permit issued March 31, 2006 is protective of water quality . . .”);
see also, id.
, pp. 2-5.
5
In its brief, ABC provides extensive selections of testimony from the November 20, 2006 hearing. That
testimony, however, should be ignored to the extent it sets forth any information that was not before IEPA when it
denied ABC’s request for a public hearing and issued the Permit. 415 ILCS 5/40(e)(1)(A); 35 Ill. Adm. Code §
309.115(a)(2).
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
20
(“The language of a statute is the best means of determining legislative intent. The statutory
language should be given its plain and ordinary meaning.”) (citation omitted). The plain
meaning of the word “public” is “of, relating to, or affecting all the people or the whole area of a
nation or state.” Merriam-Webster Online Dictionary, <http://www.m-w.com/dictionary/public>
(as of Nov. 17, 2008). ABC has not made the required showing that there was a significant
interest from all the people that use Horseshoe Lake, such that IEPA abused its discretion in
denying ABC’s request.
Only two requests were made for a public hearing. The first was in HEJ’s January 17,
2005 comment. R 532. Although it submitted a public hearing request in that comment, HEJ did
not deem its interest sufficiently significant to file a Petition for Review of IEPA’s denial of
HEJ’s public hearing request. Trans. at 147. Moreover, the January 17, 2005 letter does not
identify one person from the public who would potentially desire to be involved in a public
hearing, but only speculates that a public hearing would give unnamed “citizens an opportunity
to ask questions about the permit, voice concerns, and hear explanations.” R 532.
The other public hearing request of January 18, 2005 was purportedly submitted on
behalf of multiple organizations. R 537-539. However, the January 18, 2005 letter appears to
have been written by Kathy Andria, with representatives of other organizations only commenting
on Ms. Andria’s letter and allowing their names to be added to the signature block. Trans. 97-
98; Trans. 145 (Representative of HEJ “submitted” January 17, 2005 letter and only “signed
onto” January 18, 2005 letter); Trans. 119 (Representative of Webster Groves Nature Study
Society did not participate in the drafting of the January 18, 2005 letter and did not have any
independent knowledge of the water issues in the letter). Indeed, the Sierra Club’s representative
at the November 20, 2006 hearing did not even read the January 18, 2005 letter until a week
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
21
before her deposition was taken on November 6, 2006. Trans. 132.
6
Two of the individuals
whose names appear on the January 18, 2005 letter (Kathleen O’Keefe and Jack Norman) did not
even testify at the November 20, 2006 hearing as to their participation in preparing the letter.
Moreover, only ABC deemed IEPA’s denial of the public hearing request sufficiently important
to appeal IEPA’s denial of the public hearing request, with HEJ, Neighborhood Law Office, East
St. Louis, Sierra Club, and Webster Groves Nature Study Society all declining to file Petitions
for Review.
ABC attempts to avoid its lack of evidence of public interest by stating that ABC and the
other organizations that allegedly signed
7
the January 18, 2005 letter represent “thousands of
members.” ABC Br. at 16-17. This argument is misleading. First, none of the information
stated in pages 16-17 of ABC’s brief regarding the number of members of the organizations was
provided to IEPA during the public notice period in the January 17 or January 18, 2005
comments. Because the information was never properly before IEPA, it should be disregarded
by the Board.
See
415 ILCS 5/40(e)(2),
U. S. Steel
, 892 N.E.2d at 611. Moreover, ABC ignores
the fact that only five individual representatives were listed on the January 18, 2005 letter, and
that no other individual members of the organizations were identified or submitted separate
public hearing requests. Secondly, ABC did not present any evidence that it asked its
membership whether members were interested in a public hearing. More tellingly, not one
member of the public, independent of any private organization, submitted a comment, or was
6
Three members of the public testified at the hearing on November 20, 2006: Robert Johnson (Trans. 101-107);
Cathy Copley (Trans. 107-108), and Jason Warner (Trans. 140-143). None of these individuals, however, submitted
comments or information to IEPA during the public notice period from December 19, 2004 to January 18, 2005.
Trans. 104 (Mr. Johnson admitted that he did not submit any comments on the Proposed or Final Permit.)
Accordingly, none of the comments can be used to support ABC’s claim for a public hearing.
7
Although ABC has argued that the January 18, 2005 letter was signed by ABC, Sierra Club, Webster Groves
Nature Study Society, HEJ, and the Neighborhood Law Office, no letter was ever submitted to IEPA that was
actually signed by a representative of any of the organizations.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
22
identified in the organizations’ comments as wanting to attend a potential public hearing. R 532,
537-539. In addition, even if the Board accepts ABC’s analysis that all of the members of the
organizations can be counted as making a request for a public hearing (
i.e.
, approximately 27,000
members requested a public hearing), then it follows that only “approximately 100” of those
members (ABC’s members) deemed the denial of the public hearing request sufficiently
important to appeal to the Board. ABC Br. at 16. In other words, less than one percent (0.4%)
of the members whose public hearing requests were denied actually deemed the denial
sufficiently important to file an appeal of IEPA’s decision.
ABC has failed to demonstrate that IEPA abused its discretion in denying ABC’s public
hearing request. At the November 20, 2006 hearing before the Board, multiple witnesses
admitted that the January 17 and January 18, 2005 comments did not identify any individual of
the public who would be adversely affected by U. S. Steel’s Permit. Trans. 135, 146. Nor do
either of the comments identify any individual of the public that would have an interest in
attending a public hearing. R 532, 537-539. ABC has only been able to demonstrate that it
alone would be interested in a public hearing, which is insufficient to show that IEPA abused its
discretion in determining that there was not a significant degree of public interest in the Proposed
Permit.
III.
IEPA did not abuse its discretion by allowing a meeting with ABC, instead of a
public hearing, as requested by ABC.
In its brief, ABC asserts that IEPA somehow acknowledged that there was significant
public interest in the Proposed Permit because IEPA stated in an email that it should hold a
meeting with ABC instead of a public hearing. ABC Br. at 12. IEPA’s suggestion that a
meeting be scheduled instead of a public hearing, however, was entirely consistent with ABC’s
request in its January 18, 2005 letter. That letter clearly asks IEPA for the option of a public
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
23
hearing
or
a meeting with Agency staff. R 539 (“If you deny this request for a hearing, we ask
for a meeting with you and your staff . . .”). Yet, ABC did not take advantage of the numerous
opportunities it had to ask IEPA questions about the Proposed and Final Permits. In its January
18, 2005 letter, ABC stated that IEPA should hold a public hearing for the purpose of allowing
“citizens to ask questions and present information and testimony.” R 539. Although IEPA
denied that request for a public hearing, ABC had numerous opportunities to raise the issues that
were stated in its January 18, 2005 letter to IEPA. As an initial matter, the Notice for the
Proposed Permit provided the name and telephone number of an IEPA employee who could be
contacted with questions. The Proposed Permit provided “For further information, please call
Beth M. Burkard [at IEPA]” R 518. This opportunity for asking questions was not limited to the
30-day public notice period, and ABC could have called Ms. Burkard at any time prior to the
issuance of the Final Permit.
Id.
However, there is nothing in the Record to show that Ms.
Andria attempted to reach Ms. Burkard.
Moreover, IEPA considered ABC’s comments where it requested a public hearing or, in
the alternative, a meeting with ABC and IEPA, and decided to schedule a meeting with ABC to
address its January 18, 2005 comments. This decision was entirely consistent with ABC’s
request which stated, “If [IEPA denies] this request for a hearing, we ask for a meeting with you
and your staff. . .” R 539. Specifically, on February 27, 2006, IEPA stated in an email from
Marcia Wilhite, Director of IEPA’s Bureau of Water, to Doug Scott, Director of IEPA, that the
Agency had received ABC’s public hearing request and that it “would like to move forward to
issue the permit and recommend that a meeting with the environmental group be held instead of
a public hearing.” C 288. IEPA further provided in the email that
American Bottoms [sic] Conservancy (Kathy Andria, principal)
requested the hearing due to concerns about increased loading of
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
24
pollutants to Horseshoe Lake. There will be no actual increase in
loading--the limits in the draft renewal permit are different than the
previous permit for reasons that are easily explained.
Since hearings are held at the discretion of the Director, I’m asking
if you would be comfortable with us denying the hearing request,
but having a meeting and issuing the permit as quickly as possible.
Id.
The IEPA Director subsequently decided to issue the Final Permit and meet with Ms. Andria,
as ABC had requested in its January 18, 2005 letter
. C 289. IEPA then scheduled a meeting
with ABC through Kathy Andria for March 15, 2006. C 291 (“There will be a meeting at the
Agency on March 15
th
with Kathy Andria to discuss Horseshoe Lake, Frank Holten State Park
and issues regarding the Granite City Steel NPDES permit.”) The Interdisciplinary
Environmental Clinic at Washington University in St. Louis, who is representing ABC in this
appeal, then confirmed that the meeting would be going forward with one of their representatives
being present. C 294. On March 14, 2006, however, Kathy Andria unilaterally cancelled the
March 15, 2006 meeting with IEPA. C 296 - 300. That meeting was never rescheduled. Since
ABC’s letter of January 18, 2006 asked for a meeting if a hearing was not held, ABC waived its
right to either a hearing or a meeting when its representatives cancelled the meeting.
Finally, IEPA also found that “it should be mentioned that the American Bottoms [sic]
Conservancy did participate in a recent hearing regarding 303(d) listed water bodies and did
make specific comments regarding Horseshoe Lake.” C 286. At the November 20, 2006
hearing, Ms. Andria confirmed that ABC participated in a meeting regarding the 303(d) list that
involved the impairment of Horseshoe Lake. Trans. 84. Again, ABC had a forum for addressing
the same issues that it presented in its January 18, 2005 letter at a meeting involving Horseshoe
Lake as a 303(d) listed water body. R 537 (“Horseshoe Lake is impaired.”) Because of the
numerous opportunities for ABC to present its concerns about Horseshoe Lake, which it
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
25
requested in its January 18, 2005 letter, IEPA did not abuse its discretion in denying ABC’s
public hearing request.
IV.
IEPA conducted a proper review of the requests for a public hearing on the
Proposed Permit.
ABC attempts at length to analyze only particular sections of the record to show that
IEPA “acted as though it had unfettered discretion . . .” ABC Br. at 6. ABC’s purported analysis
is wrong, as IEPA properly assessed the comments and requests before it in the January 17 and
January 18, 2005 comments to determine whether there was a significant degree of public
interest in the Proposed Permit, and not just significant public interest in Horseshoe Lake
generally.
ABC first argues that the public notice for the Proposed Permit is somehow evidence of
IEPA’s discretion run amok. The public notice stated that with regards to a public hearing that
“Any interested person may submit written request for a public hearing on the draft permit,
stating their name and address, the nature of the issues proposed to be raised and the evidence
proposed to be presented with regards to these issue in the hearing.” R 522. This was entirely
consistent with the Appellate Court subsequent decision, which provides that the requests for a
public hearing must “indicate the party’s interest and why a hearing is warranted . . .”
U. S. Steel
, 892 N.E.2d at 611. The notice then states that “If written comments and/or requests
indicate a significant degree of public interest in the draft permit, the permitting authority may, at
its discretion, hold a public hearing.” R 522. While not identical to the Appellate Court’s
language (as ABC argues it should have been), this provision accurately provided that IEPA has
discretion to determine whether there is a significant degree of public interest in the Proposed
Permit to warrant a public hearing.
U. S. Steel
, 892 N.E.2d at 611. IEPA properly exercised that
discretion in finding that there was not a significant degree of public interest in the Proposed
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
26
Permit to warrant a public hearing on the Proposed Permit, and did not, as ABC argues, deny the
hearing requests “on the assumption that it could do so for any reason or no reason.” ABC Br. at
6.
ABC then nitpicks over two IEPA documents, a Memorandum from Toby Frevert (the
“Frevert Memo”) (C. 286) and an email from Marcia Willhite (the “Willhite email”) (C. 288),
attempting to show that IEPA abused its discretion. Those two documents, however,
demonstrate that IEPA assessed the public hearing requests and found that, within its discretion,
there was not a significant degree of public interest in the Proposed Permit to warrant a public
hearing on it. As stated earlier, ABC continues to ignore that the public interest must be “in the
proposed permit or group of permits.” 35 Ill. Adm. Code § 309.115(a)(1). Indeed, ABC
completely omits that provision and restates the standard in its own interest, arguing that “the
point of the governing regulation . . . asks whether there is significant public interest . . . in a
public hearing,” (ABC Br. at 8), omitting that the public interest must be in the proposed permit.
This omission is telling, as the “in the proposed permit” requirement in 35 Ill. Adm. Code §
309.115(a)(1) dooms ABC’s argument that IEPA abused its discretion, as provided thoroughly in
section II
supra
. In looking at IEPA’s actions with the “in the proposed permit” language in
mind, the record shows that IEPA did not abuse its discretion.
First, the Frevert Memo shows that IEPA considered the public hearing requests and
found that they did not demonstrate a significant degree of public interest in the Proposed Permit.
The Memo notes in the first paragraph that the January 17 and January 18, 2005 letters raise
concerns not with the Proposed Permit, but with “overall concerns for Horseshoe Lake [that]
have been and continue to be addressed in 303(d) discussions and hearings that have opportunity
for public participation.” C 286. The Frevert Memo then addresses ABC’s substantive
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
27
comments with explanations for why they would not effect any of the provisions of the Proposed
Permit.
Id.
As a final note, the Frevert Memo noted that because of ABC’s general concern over
Horseshoe Lake, “it should be mentioned that [ABC] did participate in a recent hearing
regarding 303(d) listed water bodies and did make specific comments regarding Horseshoe
Lake.”
Id.
This analysis was entirely appropriate given the lack of any evidence of significant
public interest in the Proposed Permit itself.
Moreover, as to the Willhite email, that document also shows that IEPA considered
ABC’s request, and, within its discretion, did not find that there was a significant degree of
public interest in the Proposed Permit. The Willhite email acknowledges that IEPA has the
discretion as to the public hearing issue, and asks whether Doug Scott of IEPA would be
comfortable denying the public hearing request, having a private meeting with ABC (as
requested by ABC), and issuing the Final Permit. C 288. The Willhite email also explained that
the hearing request was based on an erroneous concern,
i.e.
, “increased loadings of pollutants to
Horseshoe Lake,” and, thus, IEPA could exercise its discretion to find that a hearing was not
warranted as there was not a significant degree of public interest in the Proposed Permit. Like
the Frevert Memo, the Willhite email demonstrates that IEPA properly used its discretion to
deny ABC’s request for a public hearing.
In its brief, ABC raises several further points that do not undermine IEPA’s denial of the
requests for public hearings. ABC states that public hearings are held “to provide opportunity
for the public to understand and comment on the permit,” citing 35 Ill. Adm. Code § 106.111(b).
ABC Br. at 8. As an initial matter, there is no regulation at 35 Ill. Adm. Code § 106.111(b).
Assuming that ABC meant to cite 35 Ill. Adm. Code § 166.101(b) - the only regulation where the
quoted language appears, that section applies to hearing on plans to close hazardous waste
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
28
facilities, and not NPDES permits. 35 Ill. Adm. Code § 166.120. The same or similar language
does not appear in 35 Ill. Adm. Code § 309.115(a), and the omission of that language should be
read to mean that it does not apply in the NPDES context.
See e.g., McHenry County Defendants,
Inc. v. City of Harvard
, 384 Ill. App. 3d 265, 891 N.E.2d 1017, 1032 (2d Dist. 2008) (“where a
statute lists the thing or things to which it refers, the inference is that all omissions are
exclusions, even in the absence of limiting language.”). Regardless, even if that language
applied to this case, it does not overcome the fact that IEPA properly exercised its discretion in
finding that there was not a significant degree of public interest in the Proposed Permit, as
outlined extensively above.
ABC also argues in its brief that a public hearing should have been held for subsistence
fishermen, because they “are not likely to have the time or expertise to work through a
‘confusing’ and technical permit, but they should nonetheless have an opportunity to ask
questions of and express concerns of IEPA in the more information setting of a public hearing.”
ABC Br. at 9. This argument, however, should be ignored, as it was not raised in any of the
comments before IEPA.
U. S. Steel
, 892 N.E.2d at 611. Nor has ABC identified any subsistence
fishermen who would have participated in a hearing on the Proposed Permit. Thus, IEPA did not
have to consider this issue in determining whether there was a significant degree of public
interest in the Proposed Permit. IEPA did not abuse its discretion in denying a public hearing.
V.
IEPA did not commit any procedural error in denying ABC’s public hearing
request.
ABC argues that “IEPA abused its discretion by failing to offer a legally sufficient
rationale for its decision.” ABC. Br. p. 11. This argument is incorrect and should be denied. In
assessing whether it should hold a public hearing, as it did in this case, IEPA can only assess one
criteria: whether “there exists a significant degree of public interest in the proposed permit . . . to
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
29
warrant the holding of such a hearing.” 35 Ill. Adm. Code § 309.115(a)(1),
U. S. Steel
, 892
N.E.2d at 611. If IEPA decides to hold a public hearing, it follows that IEPA found a significant
degree of public interest during the public notice period to warrant a hearing. If IEPA decides
not to hold a public hearing, as it did in this case, there is only one reason why it could have
made such a decision: it did not find that a significant degree of public interest in the proposed
permit was demonstrated during the public notice period.
Id.
Under the singularly-focused
inquiry under 35 Ill. Adm. Code § 309.115(a)(1), IEPA could not have denied a public hearing
for any other reason than the fact that it did not find there was a significant degree of public
interest. For ABC to now claim that it does not know the reason why its public hearing request
was denied is disingenuous and ignores the straightforward analysis that IEPA is obligated to
apply under 35 Ill. Adm. Code § 309.115(a)(1). As a result, ABC is well aware that the
explanation for why IEPA denied its public hearing request is that IEPA did not find that a
significant degree of public interest in the permit was demonstrated during the public notice
period. Thus, IEPA did not abuse its discretion in denying the ABC’s request for a public
hearing.
8
8
If the Board is inclined to accept ABC’s argument regarding IEPA’s purported lack of explanation for its denial of
ABC’s public hearing request, the proper remedy is only to remand for IEPA to provide a written explanation of its
denial, as that is the only procedural defect that ABC complains is lacking.
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
30
CONCLUSION
For the foregoing reasons, U. S. Steel requests that ABC’s Petition for Review and
request for a public hearing to IEPA be denied, and that the Board grant all relief it deems fair
and just.
Dated: November 26, 2008
Respectfully submitted,
U.S. Steel Corporation - Granite City Works
By: /s/
David T. Ballard
One of Its Attorneys
Carolyn S. Hesse
David T. Ballard
Barnes & Thornburg LLP
One North Wacker Drive - Suite 4400
Chicago, Illinois 60606
(312) 357-1313
Electronic Filing - Received, Clerk's Office, November 26, 2008
[This filing submitted on recycled paper as defined in 35 Ill. Adm. Code 101.202]
31
CERTIFICATE OF SERVICE
The undersigned, being first duly sworn upon oath, and under penalties pursuant to 735
ILCS 5/1-109, deposes and states that one copy of the foregoing, United States Steel
Corporation’s Response Brief on Remand, was served via electronic communication to the
following attorneys of record:
Jason R. Boltz
Division of Legal Counsel
Illinois Environmental Protection Agency
1021 North Grand Avenue East
P.O. Box 19276
Springfield, IL 62794-9276
jason.boltz@illinois.gov
Maxine I. Lipeles
Kevin J. Moore
Interdisciplinary Environmental Clinic
Washington University School of Law
One Brookings Drive
Campus Box 1120
St. Louis, MO 63130-4899
milipele@wulaw.wustl.edu
Carol Webb, Hearing Officer
Illinois Pollution Control Board
1021 North Grand Avenue East
P.O. Box 19274
Springfield, IL 62794-9274
webbc@ipcf.state.il.us
/s/
David T. Ballard
David T. Ballard