RECEVEO
    CLERK’S
    OFFICE
    ILLINOIS
    POLLUTION
    CONTROL BOARD
    NOV
    06
    2008
    November
    6, 2008
    STATE
    OF ILUNOS
    IN
    THE
    MATTER
    OF:
    )
    Poflutlon
    Control
    Board
    )
    PROPOSED
    SITE SPECIFIC
    RULE FOR
    )
    R09-8
    CITY
    OF
    SPRINGFIELD,
    ILLiNOIS,
    )
    (Site-Specific
    Rulemaking
    - Water)
    OFFICE
    OF
    PUBLIC
    UTILITIES,
    CITY
    )
    WATER,
    LIGHT
    and POWER and
    )
    I
    I I
    I
    r
    I
    1’
    1
    SPRINGFIELD
    METRO SANITARY
    )
    ‘1
    Li
    I
    V
    DISTRICT
    FROM
    35 ILL. ADM.
    CODE
    )
    302.208(g):
    NEW
    35 ILL. ADM.
    CODE
    )
    303.446
    )
    NOTICE
    OF HEARING
    DATES,
    TIMES,
    ANT)
    PLACES:
    Decemberj
    2008
    10:00 a.m.
    Pollution
    Control
    Board
    Conference
    Room,
    First
    Floor
    1021
    N. Grand
    Avenue
    East, North Entrance
    Springfield,
    IL
    PURPOSE OF HEARINGS:
    Economic
    ATTENDING
    BOARD
    MEMBERS:
    G.
    Tanner Girard
    HEARING
    OFFICER:
    Marie
    E. Tipsord
    HEARING
    OFFICER ORDER
    On September
    16, 2008, the
    Board
    accepted
    for hearing a site-specific
    rulemaking
    filed
    on August
    29, 2008,
    by
    the
    City of Springfield,
    Office
    of Public Utilities,
    City
    Water, Light
    and
    Power and
    Springfield
    Metro Sanitary
    District, (collectively,
    Springfield).
    The proposal
    seeks
    to
    establish
    an alternative
    water
    quality standard
    for
    boron
    from
    the
    discharge
    point
    at the String.
    Creek
    Sanitary Treatment
    Plant
    (Spring
    Creek
    STP)
    to the Sangamon
    River to its confluence
    with
    the
    Illinois River
    and 100 yards
    downstream
    from the confluence
    in the Illinois
    River.
    The
    Board
    granted a
    motion to expedite
    the
    rulemaking
    consistent
    with the Board’s
    available
    resources and directed
    that
    a hearing
    be set
    expeditiously.
    On
    November 3,
    2008,
    the Board
    held
    the first
    hearing
    in this proceeding.
    During
    that
    hearing several
    requests
    were made
    of both the
    Springfield and
    the Illinois
    Environmental
    Protection
    Agency
    (Agency) for
    additional
    information.
    The information
    requested is to be
    filed
    with the Board
    by November 21, 2008.
    If afier
    reviewing that
    material
    there
    are additional

    Back to top