1. R08-5
    2. AS 08-9
    3. AC 09-2
    4. AC 09-4
    5. AC 09-5
    6. AC 09-6
    7. AC 09-7
    8. AC 09-8
    9. AC 09-9
    10. PCB 00-104
    11. PCB 04-102
    12. PCB 04-185
    13. PCB 04-215
    14. PCB 04-216
      1. People of the State of Illinois v. General Waste Services, Inc., – No action taken.
      2. PMA & Associates, Inc. v. IEPA – No action taken.
    15. PCB 07-71
      1. Kyle Nash v. Karen Sokolowski – No action taken.
      2. Kyle Nash v. Louis Jimenez – No action taken.
      3. Park Ridge/7-Eleven, Inc. v. IEPA – Having previously granted a request for a 90-day extension, the Board dismissed this matter because no underground storage tank appeal was filed on behalf of this Cook County facility.
      4. United City of Yorkville v. Hamman Farms – No action taken.
      5. People of the State of Illinois v. City of Geneva – In this water enforcement action concerning a Kane County facility, the Board granted relief from the hearing requirement of Section 31(c)(1) of the Environmental Protection Act (415 ILCS 5/31(c)(1) (2006)), and accepted a stipulation and settlement agreement, ordering the respondent to pay a total civil penalty of $5,000, and to cease and desist from further violations.
      6. Waste Management of Illinois, Inc. v. IEPA – The Board accepted for hearing this permit appeal involving a Madison County facility.
      7. Dynegy Midwest Generation, Inc. (Wood River Power Station) v. IEPA – The Board accepted for hearing this permit appeal involving a Madison County facility. No action was taken on petitioner’s motion for partial stay of specified conditions in the construction permit.
      8. Streator Petrol Pump v. IEPA – The Board accepted for hearing this underground storage tank appeal involving a LaSalle County facility.
      9. People of the State of Illinois v. Red Seal Development Corporation and Lenzini Excavating Company – The Board accepted for hearing this water enforcement action involving a site located in Lake County.
      10. Dynegy Midwest Generation, Inc. (Baldwin Energy Complex) v. IEPA – The Board accepted for hearing this permit appeal involving a Randolph County facility. No action was taken on petitioner’s motion for partial stay of specified conditions in the construction permit.
      11. Joseph & Victoria Morrissey v. Geoff Pahlos, Alpine Automotive – No action taken.
      12. People of the State of Illinois v. Rockford Blacktop Construction Co. and Westlake Utilities, Inc. – Upon receipt of a proposed stipulation and settlement agreements and agreed motions to request relief from the hearing requirement in this water enforcement action involving a Winnebago County facility, the Board ordered publication of the required newspaper notice.
    16. In the Matter of: Abbott Laboratories' Proposed Site-Specific Amendment to Applicability Section of Organic Material Emission Standards and Limitations for the Chicago Area: Subpart T: Pharmaceutical Manufacturing (35 Ill. Adm. Code 218.480(b))
    17. In the Matter of: Petition of Stericycle, Inc. for an Adjusted Standard from 35 Ill. Adm. Code 422.111(B)(1); 1450.105(A)-(B); 1450.200 (e)

ILLINOIS POLLUTION CONTROL BOARD
M
EETING MINUTES
AUGUST 7, 2008
Chicago/Springfield Videoconference
CHICAGO OFFICE
100 W. Randolph Street
Chicago, IL
Videoconference Room 11-512
And
SPRINGFIELD OFFICE
1021 N. Grand Avenue East
Springfield, IL
Videoconference Room 1244N, First Floor
11:00 A.M.
ANNOUNCEMENTS
Chairman Girard welcomed members of the public and staff.
ROLL CALL
The Assistant Clerk of the Board called the roll. All four Board Members answered present.
APPROVAL OF MINUTES
The minutes of the July 21, 2008 open meeting and July 30, 2008 closed deliberative session
were approved by a vote of 4-0.

 
RULEMAKINGS
R08-5
R08-7
R08-13
Wastewater Pretreatment Update, USEPA Amendments (January
1, 2007 through June 30, 2007)
SDWA Update, USEPA Amendments (January 1, 2007 through
June 30, 2007
SDWA Update, USEPA Amendments (July 1, 2007 through
December 31, 2007) – The Board adopted a proposal for public
comment in this “identical-in-substance” consolidated
rulemaking to amend the Board’s wastewater pretreatment and
drinking water regulations and extended the deadline for
completion of rulemaking from August 15, 2008 to December 1,
2008.
4-0
Water
PWS
PWS
A
DJUSTED STANDARDS
AS 08-9
In the Matter of: Petition of Big River Zinc Corporation for an
Adjusted Standard Under 35 Ill. Adm. Code 720-131(c) v. IEPA
– The Board granted petitioners motion for expedited decision,
and will issue a final decision as soon as is reasonably
practicable, consistent with decision deadlines and available
resources.
4-0
Land
A
DMINISTRATIVE CITATIONS
AC 09-2
IEPA v. Theodore & Elizabeth Hollenbeak and Hollenbeak
Concrete, Inc. – The Board ordered respondents to file an
amended petition for review in this administrative citation
involving a Brown County facility, on or before September 8,
2008, or the petition for review would be subject to dismissal.
4-0
AC 09-4
County of Jackson v. Lester Johnson and Arthur Cross – The
Board ordered respondents to file an amended petition for review
in this administrative citation involving a Jackson County
facility, on or before September 8, 2008, or the petition for
review would be subject to dismissal.
4-0
AC 09-5
IEPA v. Donald E. and Mary A. Jennings
– The Board accepted
an administrative citation against these Brown County
respondents.
AC 09-6
IEPA v. Euwell & Phyllis Beers and Jeremy Beers
– The Board
accepted an administrative citation against these
Williamson County respondents.
2

 
AC 09-7
IEPA v. Mid-America Machinery Company – The Board
accepted an administrative citation against this Macoupin County
respondent.
AC 09-8
County of Jackson v. Dan Kimmel – The Board accepted an
administrative citation against this Jackson County respondent.
AC 09-9
County of Jackson v. Alvin Valdez and Ruben J. Valdez – The
Board accepted an administrative citation against these
Jackson County respondents.
A
DJUDICATORY CASES
PCB 00-104
People of the State of Illinois v. Murphy Farms, L.L.C.– In this
air and water enforcement action concerning a Knox County
facility, the Board granted relief from the hearing requirement of
Section 31(c)(1) of the Environmental Protection Act (415 ILCS
5/31(c)(1) (2006)), and accepted a stipulation and settlement
agreement, ordering the respondent to make a “monetary
payment” in the sum of $35,000 to the University of Illinois,
College of Agriculture, Consumer and Environmental Sciences,
for the College’s Discovery Farms research project, and to cease
and desist from further violations.
4-0
A, W-E
PCB 04-102
Emerald Performance Materials, L.L.C. (as purchaser of Noveon,
Inc.) v. IEPA – No action taken.
T-S
Air
PCB 04-185
Midwest Generation EME, LLC v. IEPA – No action taken.
T-S
Air
PCB 04-215
Commonwealth Edison Company v. IEPA
– No action taken.
T-S
Air
PCB 04-216
Midwest Generation EME, LLC v. IEPA
– No action taken.
T-S
Air
PCB 05-35
Kibler Development Corporation and Marion Ridge Landfill, Inc.
v. IEPA – The Board granted petitioners’ motion for voluntarily
dismissal and denied the State’s Attorney of Williamson County
motion to intervene as moot.
4-0
P-A, Land
3

 
PCB 07-32
People of the State of Illinois v. Southwind Construction Corp –
In this water enforcement action concerning a Tazewell County
facility, the Board granted relief from the hearing requirement of
Section 31(c)(1) of the Environmental Protection Act (415 ILCS
5/31(c)(1) (2006)), and accepted a stipulation and settlement
agreement, ordering the respondent to pay a total civil penalty of
$2,500, and to cease and desist from further violations.
W-E
PCB 07-43
Kibler Development Corporation and Marion Ridge Landfill, Inc.
v. IEPA – The Board granted petitioners’ motion for voluntarily
dismissal and denied the State’s Attorney of Williamson County
motion to intervene as moot.
4-0
P-A, Land
PCB 07-44
Indian Creek Development Company, an Illinois partnership,
individually as beneficiary under trust 3291 of the Chicago Title
and Trust Company dated December 15, 1981 and the Chicago
Title and Trust Company, as trustee under trust 3291, dated
December 15, 1981 v. The Burlington Northern Santa Fe Railway
Company, a Delaware company – No action taken.
Citizens
L, W-E
PCB 07-45
People of the State of Illinois v. General Waste Services, Inc., –
No action taken.
A-E
PCB 07-63
PMA & Associates, Inc. v. IEPA – No action taken.
UST Appeal
PCB 07-71
Lone Star Industries, Inc. v. IEPA
The Board granted this
LaSalle County facility’s motion for voluntary dismissal of this
permit appeal.
4-0
P-A, Air
PCB 07-96
Kyle Nash v. Karen Sokolowski
– No action taken.
Citizens
N-E
PCB 07-97
Kyle Nash v. Louis Jimenez
– No action taken.
Citizens
N-E
PCB 08-30
Caseyville Sport Choice, LLC, an Illinois Limited Liability
Company v. Erma I. Seiber, Administratrix of the Estate of James
A. Seiber, Deceased, and Erma I. Seiber in her individual
capacity – No action taken.
L-E
4

 
PCB 08-78
Park Ridge/7-Eleven, Inc. v. IEPA – Having previously granted a
request for a 90-day extension, the Board dismissed this matter
because no underground storage tank appeal was filed on behalf
of this Cook County facility.
4-0
90-Day Ext,
UST Appeal
PCB 08-95
United City of Yorkville v. IEPA and Hamman Farms
The
Board granted both respondents’ motions for dismissal, finding
that the Board lacks jurisdiction under the Illinois Environmental
Protection Act to hear this appeal.
4-0
P-A, Land
Third Party
PCB 08-96
United City of Yorkville v. Hamman Farms – No action taken.
Citizens
A, L, W-E
PCB 08-100
People of the State of Illinois v. City of Geneva – In this water
enforcement action concerning a Kane County facility, the Board
granted relief from the hearing requirement of Section 31(c)(1) of
the Environmental Protection Act (415 ILCS 5/31(c)(1) (2006)),
and accepted a stipulation and settlement agreement, ordering the
respondent to pay a total civil penalty of $5,000, and to cease and
desist from further violations.
4-0
W-E
PCB 08-101
Waste Management of Illinois, Inc. v. IEPA – The Board
accepted for hearing this permit appeal involving a Madison
County facility.
4-0
P-A, Water
PCB 09-6
Dynegy Midwest Generation, Inc. (Wood River Power Station) v.
IEPA – The Board accepted for hearing this permit appeal
involving a Madison County facility. No action was taken on
petitioner’s motion for partial stay of specified conditions in the
construction permit.
4-0
P-A, Air
PCB 09-7
Streator Petrol Pump v. IEPA – The Board accepted for hearing
this underground storage tank appeal involving a LaSalle County
facility.
4-0
UST Appeal
PCB 09-8
People of the State of Illinois v. Red Seal Development
Corporation and Lenzini Excavating Company – The Board
accepted for hearing this water enforcement action involving a
site located in Lake County.
4-0
W-E
5

 
PCB 09-9
Dynegy Midwest Generation, Inc. (Baldwin Energy Complex) v.
IEPA – The Board accepted for hearing this permit appeal
involving a Randolph County facility. No action was taken on
petitioner’s motion for partial stay of specified conditions in the
construction permit.
4-0
P-A, Air
PCB 09-10
Joseph & Victoria Morrissey v. Geoff Pahlos, Alpine Automotive
– No action taken.
4-0
UST Appeal
PCB 09-11
People of the State of Illinois v. Rockford Blacktop Construction
Co. and Westlake Utilities, Inc. – Upon receipt of a proposed
stipulation and settlement agreements and agreed motions to
request relief from the hearing requirement in this water
enforcement action involving a Winnebago County facility, the
Board ordered publication of the required newspaper notice.
4-0
W-E
C
ASES PENDING DECISION
R08-8
In the Matter of: Abbott Laboratories' Proposed Site-Specific
Amendment to Applicability Section of Organic Material
Emission Standards and Limitations for the Chicago Area:
Subpart T: Pharmaceutical Manufacturing (35 Ill. Adm. Code
218.480(b))
Air
AS 08-2
In the Matter of: Petition of Stericycle, Inc. for an Adjusted
Standard from 35 Ill. Adm. Code 422.111(B)(1); 1450.105(A)-
(B); 1450.200 (e)
Other
OTHER ITEMS
The Board granted the Chairman’s Motion to change the August
21, 2008 Board Meeting from one held in Springfield to a
Videoconference in Chicago and Springfield.
4-0
The Board granted the Chairman’s Motion to reschedule the
October 2, 2008 meeting to Tuesday, September 30, 2008, at 3:00
pm in the Board’s Chicago Office.
4-0
6

ADJOURNMENT
Moved and seconded, by a vote of 4-0, Chairman Girard adjourned the meeting at 11:25 am
.
I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that the
Board approved the above minutes on August 21,2008, by a vote of 4-0.
John T. Therriault, Assistant Clerk