ILLINOIS POLLUTION CONTROL BOARD
July 21, 2008
AMEREN ENERGY GENERATING
COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
)
PCB 08-61
(Beneficial Use Determination – Coal
Combustion Waste)
ORDER OF THE BOARD (by G.T. Girard):
On April 17, 2008, at the parties’ request, the Board extended until July 6, 2008, the time
period for Ameren Energy Generating Company to appeal a February 29, 2008 determination of
the Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/3.135, 40(a)(1) (2006);
35 Ill. Adm. Code 105.206. The Agency’s determination concerns coal combustion by-product
(CCB) produced from the combustion of coal used in generating electricity at Ameren’s
Meredosia Power Station in Morgan County. The Agency granted a beneficial use
determination, subject to conditions, for CCB to be used as structural fill in the construction of
three roads at the facility. Because Ameren failed to timely file an appeal, the Board dismisses
this case and closes the docket.
IT IS SO ORDERED.
I, John Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that the
Board adopted the above order on July 21, 2008, by a vote of 4-0.
___________________________________
John Therriault, Assistant Clerk
Illinois Pollution Control Board