ILLINOIS POLLUTION CONTROL BOARD
PEOPLE OF THE STATE OF ILLINOIS
)
)
Complainant,
)
)
v.
)
PCB 08-17
)
FELKER PHARMACY, INC., an Illinois
)
(Enforcement-Water)
corporation, and ROD BENNETT
)
CONSTRUCTION, INC., an Illinois
)
corporation,
)
)
Respondents
)
MOTION TO FILE THIRD PARTY COMPLAINT
Rod Bennett Construction, Inc. (Respondent), by and through its attorney, James E. Meason,
files this Motion to File Third Party Complaint pursuant to 35 Ill. Admin. Code 103.206(d),
stating as follows:
1.
The Illinois Pollution Control Board (IPCB) regulations permit a party to file a third-
party complaint upon moving IPCB for leave to file the pleading. 35 Ill. Admin. Code
103.206(d).
2.
The basis for this Motion is that Respondent has a claim that arises out of the occurrences
that are the subject of the proceeding.
3.
In the alternative, pursuant to 35 Ill. Admin. Code 103.206(a), Respondent requests IPCB
to add McClellan Blakemore Architects, Inc. (MBA) and Wendler Engineering Services, Inc.
(Wendler) because a complete determination of the controversy cannot be had without the
presence of the entities.
4.
Moreover, the Illinois Code of Civil Procedure permits a defendant to, through the filing
of a third-party complaint, “bring in as a defendant a person not a party to the action who is or
may be liable to him or her for all or part of the plaintiff’s claim against him or her.” 735 ILCS
5/2-406(b).
5.
The Environmental Protection Act (Act) (415 ILCS 5/1 et seq.) prohibits causing,
threatening, or allowing the discharge of any contaminant into the environment so as to cause or
tend to cause water pollution. 415 ILCS 5/12(a).
6.
The Act prohibits the deposit of any contaminant as to create a water pollution hazard.
415 ILCS 5/12(d).
7.
The Act prohibits the causing, threatening, or allowing of the discharge of any
Electronic Filing - Received, Clerk's Office, December 28, 2007
2
contaminant into the waters of the State without a National Pollution Discharge Elimination
System (NPDES) permit. 415 ILCS 5/12(f).
8.
Respondent incorporates the Complaint in this case by reference. In addition to the
allegations contained in the Complaint, Respondent maintains:
9.
Respondent Felker Pharmacy, Inc. hired Respondent to build a store known as Snyder
Pharmacy Dixon in Dixon, Illinois (project).
10.
Respondent hired McClellan Blakemore Architects, Inc. (MBA) to design the project.
11.
MBA hired Wendler Engineering Services, Inc. (Wendler) to provide engineering
services on the project. It was within Wendler’s scope of services to submit the Notice of Intent
for General Permit to Discharge Wastewater from a Construction Site (NOI) application to the
Illinois Environmental Protection Agency (IEPA). Wendler failed to do so.
12.
Further, because Wendler failed to apply for the NOI, IEPA did not issue a NPDES
permit for the project.
13.
On or about August 26, 2005, an IEPA inspector visited the site and noted the lack of an
NOI or NPDES permit. As a result of that inspection, IEPA referred a regulatory enforcement
case for prosecution.
14.
On or about August 20, 2007, Petitioner filed this case against Respondents, alleging
violations of the Environmental Protection Act and its implementing regulations for water
pollution, creating a water pollution hazard, and failing to obtain an NPDES Permit (i.e.
, 415
ILCS 5/12(a), (d), (f) and 35 Ill. Admin. Code 309.102(a).
15.
Since Wendler did not obtain the NPDES permit, any storm water runoff from the project
also was unpermitted, constituting and causing, threatening, or allowing water pollution and a
water pollution hazard. Such a failure constitutes negligent conduct. Wendler had a duty to
perform its services in a competent fashion, and it failed, thereby breaching its duty.
Consequently, because of that breach of duty, Respondent is a named party in the Complaint and
may incur liability.
16.
MBA had a duty to properly supervise Wendler. MBA failed to properly supervise
Wendler, and therefore breached its duty to Respondent to perform its services in a competent
fashion, thereby breaching its duty to Respondent. Consequently, because of that breach of duty,
Respondent is a named party in the Complaint and may incur liability.
17.
The Joint Tortfeasor Contribution Act (Contribution Act) (410 ILCS 100/1 et
seq.)
provides “where 2 or more persons are subject to liability in tort arising out of the same injury to
person or property . . . there is a right of contribution among them, even though judgment has not
been entered against them . . .” 740 ILCS 100/2(a). Liability under the Act creates the requisite
“liability in tort” for purposes of the Contribution Act. People v. Brockman
, 143 Ill.2d 351, 373
(1991) (recognizing third party Contribution Act claim where original defendant sued under
Electronic Filing - Received, Clerk's Office, December 28, 2007
3
Act); Illinois State Toll Highway Authority v. Amoco Oil Company and Mobil Oil Corp.
, 336
Ill.App.3d 300, 313 (2 Dist. 2003) (applying Contribution Act claim to underlying liability under
Act). Illinois State Toll Highway Authority v. Amoco Oil Company and Mobil Oil Corp., 336
Ill.App.3d at 315-16 (allegation that Act’s joint liability provisions subjected parties to liability
is sufficient to maintain contribution action).
18.
Respondent filed electronically a Third Party Complaint with IPCB on December 7,
2007.
19.
Therefore, Respondent requests IPCB to either allow Respondent to add Wendler and
MBA as third party respondents retroactively, using the previously filed complaint, or in the
alternative, order the Petitioner to add Wendler and MBA as respondents to this case.
Respectfully submitted,
Rod Bennett Construction, Inc., Respondent
By:
James E. Meason
James E. Meason
Attorney at Law
113 W. Main Street
Rockton, IL 61072-2416
(815) 624-6517
VERIFICATION
Under penalties as provided by law pursuant to Section 1-109 of the Code of Civil Procedure,
the undersigned certifies that the statements set forth in this instrument are true and correct,
except as to matters therein stated to be on information and belief and as to such matters the
undersigned certifies as aforesaid that he verily believes the same to be true.
Rod Bennett Construction, Inc., Respondent
By:
Rod Bennett
c:\my docs\law\bennett\felker\motion to add third party
Electronic Filing - Received, Clerk's Office, December 28, 2007
4
CERTIFICATE OF SERVICE
Pursuant to Supreme Court Rule 12, I certify that on December 28, 2007, I sent via U.S. mail
from Rockton, Illinois, at 3:00 p.m. or via electronic filing as indicated the Motion to File Third
Party Complaint to the following persons:
Illinois Pollution Control Board (electronic filing)
100 W. Randolph
Suite 11-500
Chicago, Illinois 60601
Bradley P. Halloran, Esq.
Hearing Officer, Illinois Pollution Control Board
100 W. Randolph
Suite 11-500
Chicago, Illinois 60601
Stephen J. Sylvester, Esq.
Assistant Attorney General
Environmental Bureau
69 W. Washington Street, Suite 1800
Chicago, IL 60602
Eric D. Morrow, Esq.
Smith Hahn Morrow & Floski, P.C.
129 S. Fourth Street
P.O. Box 10
Oregon, IL 61061-0010
Rod Bennett Construction, Inc.
By:
James E. Meason
Respondent’s Attorney