ORDER OF THE BOARD (by G.T. Girard):
On June 5, 2007, the parties timely filed a joint notice to extend the 35-day period within
which Dynegy Midwest Generation, Inc. (Dynegy) may appeal a May 29, 2007 determination of
the Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2006); 35 Ill.
Adm. Code 105.206(c), 105.208(a), (c). The Agency issued a permit for construction and
operation of baghouses and sorbent injection systems for the Unit 1 and 2 boilers at the Hennepin
Power Station, Hennepin, Putnam County. Dynegy received the permit on June 1, 2007.
The Board extends the appeal period until October 4, 2007, as the parties’ request.
See
415 ILCS 5/40(a)(1) (2006); 35 Ill. Adm. Code 105.406. If Dynegy fails to file an appeal on or
before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that
the Board adopted the above order on June 21, 2007, by a vote of 4-0.
John T. Therriault, Assistant Clerk
Illinois Pollution Control Board