| - BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
- ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
- Respondent.
- APPEARANCE
- BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
- DYNEGY MIDWEST GENERATION, INC.
- Petitioner,
- Respondent.
- APPEARANCE
- BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
- APPEARANCE
- BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
- DYNEGY MIDWEST GENERATION, INC.
- (HAVANA POWER STATION),
- ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
- Respondent.
- APPEARANCE
- BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
- ILLINOIS ENVIRONMENTAL
- PROTECTION AGENCY,
- APPEARANCE
- BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
- Petitioner,
- ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
- Respondent,
- JOINT REQUEST FOR NINETY DAY EXTENSION OF APPEAL PERIOD
- Exhibit A
- Construction Permit Issued to
- Dynegy Midwest Generation, Inc.
- [Havana Power Station)
- April 16,2007 (received April 24,2007)
- CERTIFICATE OF SERVICE
- ANDREW N. SAWULA, and SHELDON A. ZABEL ON BEHALF OF DYNEGY
|
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.
1
(HAVANA POWER STATION),
1
)
Petitioner,
)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
1
)
PCB
07-
)
(Permit Appeal -Air)
1
1
1
1
NOTICE OF FILING
John T. Therriault, Assistant Clerk
Sally Carter
Illinois Pollution Control Board
Division of Legal Counsel
James
I<.
Thompson Center
Illinois Environmental Protection Agency
Suite
1 1-500
102
1 North Grand Avenue. East
100 West Randolph
P.O. Box 19276
Chicago, Illinois 60601
Springfield, Illinois 62794-9276
PLEASE TAKE NOTICE that we have today filed with the Office of the Clerk of
the Pollution Control Board
APPEARANCES OF KATHLEEN C. BASSI, STEPHEN J.
BONEBRAKE, ANDREW N. SAWULA, and SHELDON A. ZABEL ON BEHALF OF
DYNEGY MIDWEST GENERATION, INC. (HAVANA POWER STATION) and SALLY
CARTER ON BEHALF OF THE ILLINOIS ENVIRONMENTAL PROTECTION
AGENCY AND JOINT REQUEST FOR NINETY DAY EXTENSION OF APPEAL
PERIOD,
copies of which are herewith served upon you.
is1 Kathleen C. Bassi
Kathleen C. Bassi
Dated: May 16,2007
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
SCHIFF HARDIN LLP
Attorneys for Dynegy Midwest Generation, Inc.
Sheldon
A. Zabel
Kathleen C. Bassi
Stephen
J. Bonebrake
Andrew
N. Sawula
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois
60606
3 12-258-5567
FAX: 3 12-258-5600
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.
)
(HAVANA POWER STATION),
)
Petitioner,
)
1
V.
)
PCB 07-
)
(Permit Appeal
-
Air)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
APPEARANCE
I hereby file my appearance in this proceeding, on behalf of Dynegy Midwest
Generation,
Inc.: (Havana Power Station).
Is/
htUw
6 Bpggi
Kathleen C. Bassi
Schiff
Hardin LLP
6600
Sears Tower
233 South Wacker Drive
Chicago, Illinois
60606
(312)
258-5500
Dated: May 16,
2007
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.
(HAVANA POWER STATION),
1
)
Petitioner,
V.
)
PCB 07-
)
(Permit Appeal
-
Air)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
1
Respondent.
APPEARANCE
I hereby file my appearance in this proceeding, on behalf of Dynegy Midwest
Generation, Inc., (Havana Power Station).
IS/
Syh
J.
Bo.whd
Stephen J. Bonebrake
Schiff
Hardin LLP
6600
Sears Tower
233 South Wacker Drive
Chicago, Illinois
60606
(312)
258-5500
Dated: May 16,
2007
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.
1
(HAVANA POWER STATION),
)
1
Petitioner,
1
)
v.
)
PCB 07-
)
(Permit Appeal
-
Air)
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
1
Respondent.
1
APPEARANCE
I hereby file my appearance in this proceeding, on behalf of Dynegy Midwest
Generation, Inc., (Havana Power Station).
/s/
Aqd;cw
/t:
&wah
Andrew N. Sawula
Schiff
Hardin LLP
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois 60606
(312) 258-5500
Dated: May 16,2007
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.
(HAVANA POWER STATION),
)
Petitioner,
)
)
V.
)
PCB 07-
)
(Permit Appeal
-
Air)
)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
APPEARANCE
I hereby file my appearance in this proceeding, on behalf of Dynegy Midwest
Generation, Inc.. (Havana Power Station).
IS/ SkcRo<
A,
Za61t
Sheldon A. Zabel
Schiff Hardin LLP
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois 60606
(312) 258-5500
Dated:
May 16, 2007
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.
)
(HAVANA POWER STATION),
1
)
Petitioner,
i
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
j
)
PCB 07-
)
(Permit Appeal
-
Air)
1
1
)
)
Respondent.
1
APPEARANCE
The undersigned, as one of its attorneys, hereby enters her APPEARANCE on
behalf of Respondent, Illinois Environmental Protection Agency.
ISI
Sally Carter
Sally Carter
Assistant Counsel
Division of Legal Counsel
Dated: May 16,2007
Illinois Environmental Protection Agency
1021 North Grand Avenue, East
P.O. Box 19276
Springfield, Illinois 62794-9276
2
171782-5544
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
DYNEGl' MIDWEST GENERATION, INC.
)
(HAVANA POWER STATION),
1
Petitioner,
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent,
1
)
PCB 07-
)
(Permit Appeal
-
Air)
JOINT REQUEST FOR NINETY DAY EXTENSION OF APPEAL PERIOD
Petitioner, DYNEGY MIDWEST GENERATION, NC., HAVANA POWER
STATION ("DMG), by and through its attorneys, Schiff
Hardin LLP, and the
Respondent, Illinois Environmental Protection Agency ("Agency"), pursuant to Section
40(a)(l) of the Illinois Environmental Protection Act (415 ILCS 5140(a)(l)) and 35 Ill.
Adm. Code 105.208(a), respectfully and jointly request that the Illinois Pollution Control
Board ("Board") grant an extension of the 35-day period for filing petitions to appeal the
Agency's issuance of a construction permit for 90 days, until August 27, 2007. In
support of this Petition, the parties state as follows:
1.
On April 16, 2007. the Agency issued a construction permit (received by
DMG via mail on April 24, 2007) to
DMG to permit the construction and operation of
baghouse, scrubber,
and sorbent injection systems for the Unit 6 boiler owned and
operated by DMG at
the Havana Power Station. A copy of the permit is attached hereto
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
and incorporated herein as Exhibit A. The deadline for filing an appeal of this permit is
May 29,2007.
2.
The parties agree that additional time would be useful to continue
negotiations and may eliminate the need to submit a permit appeal.
WHEREFORE, the parties respectfully and jointly request that the Board grant an
extension of the period for filing an appeal of this permit until July 23,2007.
Respectfully submitted,
DYNEGY MIDWEST GENERATION,
ILLINOIS ENVIRONMENTAL
INC. (HAVANA POWER STATION)
PROTECTION AGENCY
by:
by:
is/
GJGxrIrb
a
c5c%m7.
Is/
&A$
Cirh
One of Its Attorneys
Sally Carter
Assistant Counsel
Dated: May
16; 2007
SCHIFF HARDIN, LLP
Sheldon A. Zabel
Kathleen C. Bassi
Stephen J. Bonebrake
Andrew N.
Sawula
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois 60606
312-258-5500
Fax:
3
12-258-5600
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY
Sally Carter, Assistant Counsel
1021 North Grand Avenue, East
P.O.
Box 19276
Springfield, Illinois 62794-9276
21 7-782-5544
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
Exhibit A
Construction Permit Issued to
Dynegy
Midwest Generation, Inc.
[Havana Power Station)
April
16,2007
(received April
24,2007)
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
Dynegy Midi,:est Generation, L~nc
Attn:
3ick
Diericx
2825
North Monroe Street
aecacur. Zilinois 62526
A~glication i<o.
:
07010031
I.D. Xo.: 12i804rAA3
Appiicant.'~ 2esignation:
Dace Received: January 17, 2007
Subjecr:
.-
Baghouse, Scrubber acd Sorbeilt Injection System for Linit
6
>ate issued: April IS, 200:
Location:
Havara Power Piant, 15260
?I.
State Xoiite 78. Eavana, b:ason County
Permit is
hereby granted to :be ahove-designated ?errnittee to CO?JSTRUCT
equip:oen: consisti::g of a baykcuse, scrubber, and sorbcnt in;cction systcn
for the Unit 6 3olLer and associated instal!ation oi baoster fans, as
described
in
tke
eabov
eeerenced application. This Ferni; is subjeci io
. .
star;dard corciitions attached hereto and the fo1Lo:~ii:g special conori~oc!si
:
a. Tnis Pernii authorizes construction of a bagnouse syseen
(3aghouses X and 31, scrubber systex (Scrubbers
A
and
B),
and
sorbenc icjection system ro su?pler,eili tile exisiii~g enlssio-
co:ltrol systor,s on -:he existi:ig Lli~ir 6 boiler lalso kco-<.r. as
aoiier
9i
.
:'l?e rew baglloiise sys:e:n. scruSber system, and sorbecc
in:ection system sioild further process :he flue gas frc!r this
existicg coal-fired boiler, which is equipped wich a aarticuiate
aggiomcratol, electrostatic precipifaccr !ESP), and selective
catalytic reduction
(SCK)
system. 'This perinit slso aut!?orizes
instaiiation o: booster fans on the boiler to compensate for the
adsiitio::al yressrre drop from ihese now coniro? sysrc!i?s.
. .
b. i. This permii. is lssiied based or: ::!IS project being an
enissions control
pro:ect, whose purpose and effec: +;ill be
to reduce emissions
of sulfur dioxide
(SO2),
parriculaze
-..
~..a~ter:
-
(?Ni,
a:ld itnercury iror r:3e e:;istirg boiler ar:d wilici:
:.i~z
..,
no: increase evissicns of 0:izer PSD po1:l;ta:irs. As
such,
cke
cer;ns a:id co:?drrlons of
tl:e
ex~s:i::ij
pc-x~ir:; :;;I:
csncicue to govern ei-issiocs and operstion of :he boiler
erc:c?pt as spccif'caiiy LcaLcatcd.
. ,
I
This gerxit is issued based an tke receiving, storage and
!ia.ndiini_r of linestone and S~alogenarec activa=ed carboc :or
-i..
&..c
new concroi syscer:s <;r;ali_'ying as i!:signiiicant
-..>..
es,
w:rn
. .
anct:ai enissions of
P!?
i:!
~l;e
absei:ce of
control
-"-.
.
Chis
egiigmenr
oc:ivi'iy
that
rleed
wouic.t
r!ot be
be
addxessec
no more than
by this
0.42
perrrit.
tons, so
This does afLect ike Pernirtee's oblrgarior
LC
conply ,,;i;n
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
ail applicable re~r~?ire!;!e;-~ts
:?>at apply zo tile rocciving,
storage and handling of tllese riaterials.
.. ..
c.
.
This
r.oller
.-
permit
or gerieraring
does no-,
i!ni:.
author~ze
which
aily
:,:auld
xoc!irrcario:~s
increase their
to tke
capacicy
existicg
or
porectial emissions.
d. This permit
does
r:ot affect requirexents for r:~e affected boiler
established
bj: the Cocsent Decree ir: united Staces of America and
the Stace of Illinois, American Bottoni Conservancy, Healctl
E~:~?vi-.o~?~neiltal
Just ice-Si. LOLIIS, c
,
1.1.1
l'nois Srewardship
Alliance, and Prairie Rivers Network,
v.
Illinois Power Company
and
DyiIegy Mirlwest Gei~erecio:! I:.
,
Ci*.ril Actioc No.
99-533-MG3,
U.S. Sis'rict Court, Southern District of Iliinois (Decree),
ccI..--
.LuLn provisions of ~.,~hici! are referenced
by
this perni:.
In
addition. as che provisiorls of tile ?ecr-ee are referenced in
cerrnin conditions of ;his perni:, in the event of inconsistency
betwee:? a perinit condition and the provision oi the Decree or if
a provision of the Decree is revised, the actual provision of the
Decree shall govern.
a. The "affected boiler" for t!-e purpse of ci?ese unic-specific
conditio:ls is tile existing u:~Lt 6 or a the initial
stariup oE the nfw emissions cortrol sysiems, as described in
Conditior. 1.1.
U.
-
:or purposes of certain co.-xIicions relaced to tP.e Decree, the
aifecceci boiler is dlso :,ii-: of
a
";]n;i"
as defjl:ed
;;y
,ragrap::
50 0: the Decree. .which define a ";.it" ro rean co:?ectively,
tke Dolier that produce stc.a-1 for :hi. sceam b.: i1.e.. the
affected boiler), the ccoal pulverizer. srationar:, equipnent that
feeds
coal to :he boiler, cte stean turbice, che generator, -he
ecjuipne:~z necessary co operate :he generaLor, srean r::rbi!:e anci
boiler, and all ancillary equipment, includir.g poilution control
eqaipxenc.
3
Applicable i'lnission Standards fox: the Affected Boiler
-,
a.
A.
Ine affec.e. boilcr ,,,.,I_
""-2'
conpiy wick ionlicable
-.
emission
star.dards under the federal New Socrce Pertormarce
Srandards (KSPS) for Fossi: Fuel Fired Stcan Gecerators, 40
CFX 60 Subpart D, as addressed in existing pcrniis for the
afiected boiler.
.
"
.
3
,
.
The effected boiler skali co:npZy with app;icable elxissiori
.-;:ar:da~-ds and reguireme~rs relaccd to mercury mission
y-!rsuant to 35 1a.C Part 225, by the a:7L31icablr dates
spealfied by cheses r-ies.
13
The affected boiler shall comply ;.:ltk applir:abia em:ss:o!-.
. .
sre3caros r..der
aL~
TL-
. ', . ,
35, i;:iSt.irle
a,
C:?ap:er i, S:.:i?cl.apter c of
-
~.zo
.
+
--lizois
.. .
.3,ehiclstrscive CoCe, as addressed i:: existing
perrriits for ci:e affected boiier.
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
Page
3
c.
Tile
P':
e:gissron rate of tk,e affected boiler sirall iiot be greater
than the limit specified in Paragraph 86 05 the Decree, i.e.,
0.030 iS/rmBtu.
E:nission resring co~?d:icreci r.o dn:er%i.ne
compliance with :his limit shall use methocls and procedures as
specified
ic
Paragraph 90 of the Decree
i\'oce: The PI*! emissior. rate for the affeccecl boiler psrsuant co
:lie Decree is irore stri,ngeni thac tke appiicable NSPS and state
standards for
PK.
1.4
Piiture '.pp:icahLe
Zwissioc Rate under tile Consent Decree
a.
i'he SO; c~issio:~
race of affected boiler st!alL be no grearer than
the
iiml
t specified in zaragraph
66
of che Decree, i.e., 0.
:00
1b.r-~nBc-, by the C.ate specified ic Paragrhph 66, i.e.. r.0 later
ihan Liecemher 31, 2012.
Omissioc iesting conciucred to ~~~~~~~~1.ne
co;npii.ance ,i?l.::?. this limit shell use nettods and proced~res as
specifled in Paragraph
82
ot cne Decree.
Xorr:
The
SO, ezission rats for the affect:ed boiier pursuant
to
tle Decree, wnen ii ta:kes effect, uilL be more stringent thac :he
current applicable federal NSPS standards of
1.2
ih/w~nBtu,
b.
lhe P\i emission rate of the affected boilex- shali be no greater
than the 1in:iL specified ir: Paragraph
85
r,f :he Decree, i.e..
0.015 l:~!iwcEc~,
by
the date speciL:ed in Paragraph
66,
i.e., no
laze1 :l?a!l Dece:!~b:?r 3i.
2012.
Emission tcscing cor.duc:ed
Lo
dererxice compliance wicb. this liai: shall nse mettods and
procci~:rcs as sgeci.fi.ed in ?aragrap!:
90
of the Decree.
:
5
Co.~.piiacce Assurance i,:oni tori.ng
(C;iI<)
An
provided
bi.
20
CCR
64.5 (a)
(2).
if the Per:zitree applies for a
significai::
rodlfic:ation of the C.~-&PP zermit for rhe source to include
:he new c0nt~oL sysceinls) for the aftectea boiier, the Pernittee
shall
s~ijirit a compliance ass,cra!?ce ron5corinq
(C;iII)
plaii in accordance with
40
CFR ?art
66,
Co-pliance Ass;irance :.:o:utori?y $0:- :lie boiler,
io
t1:e
extent
that
it
i,m::cl
he a pol1utan:-specitic emissions unit for ~whicl?
tkr
yroposed
peimlL
revision is appiicable.
1
.6
..
::or:<
. -
.it-8c:lcis a:xi Dpersrional Req:lirel:ler:::s
for ?I< arlr.!
SO2
Control
>e::ices
a.
!.
;,ni.
-.
L'erniiiccee shall opeznti? and mai!ita:n eac3
PM
roi-.trol
device on the affecred boiler iu accordance with ?aragraphs
93
. .
87
oC
?.
n:,~
.
3. -!IC
3ecree:
>.k>~e: Paragraphs 83 arid
87
of the Decree c1enerall-i. 1-eq~ire
rnai
P:,; co::rol
devices be o?eraced ro saxinrze
. .
?:d emrssloc
reductions a: all rimes when Uni: is in operation ro ite
er:;ei:t reasonably pracricabie and s?ecify ccrrain mir.i.~lm
operati-.g and mair~tetance pract~ces char :he Permittee x:sz
mpienerrt for :.his iiurpose.
;
i
-;~
Perrictse shall opera:e and nia5nthin the i'SP or: each
affected hoilei- in accordance with Pal-agraph
84
of
~13s
2ecrce.
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
Rote: Paragraph
84
of t:he Decree requires thar the
Permitree impleil-en; t::e
practices reco?r.endeii by the
?I4
. .
Smission Control Op~irizatioc S:udies pertorxiec Lc
accordacce
with
?aaaagrp?
894
of the Cecree or ott!er
=;,.ercative ac:ions approved by USE??. in accordance wizi
-a.a~-cpi
li-r-
.---
84 of the Decree, ,~nless the criterion in
Paragraph 87 of tie Decree that liit this req~ireirent haile
been satisfied.
ij.
.
*~
.ce Pern!izree siiall operate and maintain the affecte6~
boiler and Uni; 6, and associaced PE control eqzipmeat
ic
accordance with the
??,:
costroi plan maintained
by
r:ke
Permittee pilusva:?t to Co~lclition
1.9-2
(b!
(i)
(A1
.
b,
-.
Effecrive no later than Oecentber 31.
2012,
tic Permirtee
sha?l no: operate tie affecrsd boiler and Jnlt 6 unless .he
req-izemencr of Paragraph 66 of rhr Decree with respec: to
addition of a flue gas desclfirization system or a:]
equivalent SO: cor:rrol tecknology ?io the affecced boiier
have been fxlfrlled.
. .
11.
Tie Permitree s:l;ll ogera:;
anti ;i,aLi!;.ain tile acidiriola:
,SO,
con~rci systen ort :ie aifecced boiler, as addressed above,
in
accordance ,;;1:n
Parlgrapk 69 of rhe Decree.
.
irote:
.
Paragraph 69 of t.5e Decree generaily rec~~ires
ch2.c
SO, coxrol syste!,: he ops:.arecl to r:!asi::llze SO- cnicsior.
..
.
zedcccio~s a: aAi rlnes .ii?e!' :?LC
1s ln opelacion ;e t5,e
.
..
o:iienc reaso:~ab?y pracr:.ca:,~e axil snerify ceriain :i:~il;tu~c
cperaziny and nair;ena!:ce
graczlc:es ci-ar the Pernittee
nxsz
1npiez:enc tor this purpose
iil.
The Permittee siiail operare anc: mai~-~t.ain
the additioiial SO:
control system
on tke affected bo"'cr in accordance
eirh
the SO, co:>-,roi plan rnairlcainecl by the Permittee pursaant r-o
Cordiiion
1.9-2lb)
(LiI1 (A!
C.
The ducc;.ork for tke affected boiler shaii no: icclude a "bypass
cLicEm that .,.ie;ilci ei:able :e ilce gas lrorr!
tl!r
affrcxed boilel- ro
nypzss the bayhoiise system
1.7
Testing Reg2irements
a.
-.
':he Permircze s'lali :lave ceszinc; condcczed to i-easure t?.e
P:,1 emissior:s fro3 chi effcrred boiler on
a
periodic basis
co-;slsleili
...
t.
rhe :reql;irexents or iaragripiis 85 end ilii
of che Decree .:jirn respec: co the rimlng of PM errlssion
L
L.fabs.
,--
ii.
, .
rne Per~.:.ttcr s;-.all nlso have ies~i:?~
cond~ic:ed to xeas::re
the Pt,: enissiocs fror. tie atfecced bcller -.~>irilc
90 days
;
.
later dace 5e.c by tr:e 1::ir.c:
s
j
fo:?o:,;Lr.g a
rei;;!est
iy
e
I
n
E?:
for s~:cii xess:ire:ne:?ts
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
b.
I. Tk.i:st: measurements shall be perforsea
L::
r3e n!aximum
operating range of the afiecteii boiler ar!d o;:i~e~-.jise i;:ldar
., .
representative operating conartlons.
IL.
. .
A.
The methods and proced-res used for n:easurenents to
cietermine coropiiacce ,.with the applicable PI3 enissio~
standards and limitations shall be 1:'
- -
decordance
-
with
Paragraph 90 of the Decree.
B.
In conjunction .;:irk. such mens;;rener:is, meascremenrs
of cor!densab?e PM shall also :?e conducted hy CSPPA
Inethocl 20%
!40
CFR Part
51,
Appeniiix
I*::l
or other
established test
:nethod approved by rte
I
llincis
3?A.
c:
Except for minor drvia:ions in test nethods, as defined
by
35 IAC
283.130, P?l
emission tescing shall bc condxctcd i:: accordance
.
..v.~,.,
.i
-A
a resr plan prepared
jy
the tescicg service or rne Perrnir~ee
a::d sub:aitted to e:?e Tl!inois EPA for revj.e,E prior
to
cestln(!,
and the conditions,
if
any, imposed hy the iliinois as parc
of izs zeview and approvai of the test pian, pursuant co 35 IAC
283.220 and
2Bi.230.
The Pernitree shall suhlu: chis test plan
at
leasi 60 days prior to tiie accilal dare of cestlrlg.
0. e Pernittee sl~all noiiEy the Iili~ois 2PA g-lor co cur:ducting
PM emission tescirg to ecahle the :!linois EPA co observe
testing. Norificarion for the expected rest dace shall be
sxknitted a nl.nim~im
of
30 days prior to rhe expecceii daze of
cesting. Xoritication of rhe actual daze
and
expccred
cimo
of
testing shall he scbn7,it:ed a
n).inimun
of
5
working days prior co
tke acioai test date. The Iilirois
:?A
riiay
o:~ a case-hy case
basis accept shorter advance r.orice if i: '::ou;cl not interfere
s
. .. -.,
the Tiiino's E?A8s ability ;o observe cesting.
C. T!?e Permittee shall s..;bnit tl:e Final Reporc(s1 for illis
?b:
enisslo:: iestirg to rir
illi!lois
SPA wiiilin 45 days of co:~.ple:ion
oi testing. which reporr(s1 shall icle che ioliovir?g
in1or:rlaiior;:
1.
The name acd jdecrificacion of tke affected ~nlt(s) and rie
:.es>,:?ts
o{
:ae :esiu
.- .
iii. The nane of any relevaxt observers present inciadins t?.e
testing company's represenratives. acy Iiiino~s EPB or
.,
jSEP.2..
.
regr~ser:tati.ves, and the representatives of the
?eri.iciee.
.
; .,
Desc:rip~iu:i of tesr :ni?thod(si, i:icludisg description of
sa:rp:ing poi::',s, saxpiing train, analysis egl;l.prent. and
test
Dccree, incl:udiny a description oE ai:y r:inor
cievitiriors fro:: ;he rest ?:ax, as pt-ovi.c!ed i!y 35 ?AC:
283.230(a).
. ,
V.
Detailed descvlpcion of operating conaLclons during
re:iting,
ir.c:;~;cii.!;g:
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
Page
6
>.
Operating informatlor for tle affected boiler, i.e.,
firing rate of each boiler (million Stulhr) find
composition of f~iei as burned lash, sulfur and !lea:
conzer.ci
3.
Combi:stioc sysren- i.nfcrn:ation, i.e., setzings for
distriintio:? of prinary ancl secondary corthIstiol: air.
settings for
0:.
concenzration in the boiler, ar!cl
levels of CO in tile f?.~e gas,
Lr
. -
drterrr:ired by
n~ty
.-
diagnostic neastirenencs.
C. ConcroL equipment infornation, i.e.. equiprenc
condition ancl operazing parameters during testing,
including any use ot the flue gas conditioning
sysienl.
D. Load cikrizg tesiing 1mega:";att outpu;)
vii. Data and calc;ia:;ons, including copies of all raw data
sheets and records
o: laborc?tory analyses, sample
ca!culazioi:s, aird data 02 equ:pi;,e!>t calibration.
v.iii, The SO,, NO,,
0;
or CO,, ikoilrly a,.-erages)
a:!A
opac'iy data
i
6-minure averages) n;easu~:ed during testlncj.
gote: This pcc21j.: does not affect :he reqi:irenencs Lor elalsslor:
tescing cor!cained in i?.e exisring per3it.s for tke source.
a, The Permittee
snaL: install, operate, and maintii.7 conzi;li.o.Js
n-on~toring eq~;ignen; tor operation of the sorben: injection
system,
i.e., rate of injection oi sorbent.
5.
The ?ermizt.ee shall inscall, o9erat.e and r.a4.nrain continuo:ls
l:o:?itol:ina ec!;lipment ;o lxeasure tke tollowing operaiizg
parameters oi the
iagiio~se
syscen:
A.
The temperazure of the :?tie
gas
ac "he inlet of the sysCen
(nourly average)
11.
. .
?l:e pressure d:-op across :he syster, (hourly avcragci
c. '?:he
I~L
-. -
Pari
Pernittee
225 relazed
sI;al1 coriply
to noniroring
i,ji:h all
of
applicable
3:ercury eroissions
rewirercents
iroic
of
c?!e
35
a:fectcd boiler.
Xote: Ti:Ls uer:nit does zoz affecc the requ.reme!?rs for- monito-ir.g
conrained in the existiny pe-r:.i:s for Li!e sonrce.
. .
I. S-L ?.ei:ordkeeplng ?eq?Lirencnrr, for rkc Coa! Spy for
ri:e
.ifec:ec:l :3oil.er
-,
a. ::!e Pernictec shai l co:ngly wlch all applicable re(:-ire:ne:lts of
31
IAC
Parr
22.5
reiaied ro sarlpllng and analysis
cE
tke coal supply
to the acfecced boiler for izs mercury co!-.cent.
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
5.
-,.
rce ?erinittee shall keep records of -he nerc:,ry acd lieat con,:e:~t
oi the coal s,:pply re :he affected boiler, v:i:h
supporting data
for
the associated sa;npling anti analysis ne~hiidoiogy, so ail no
have representacive daca for the mercury cocrent of the coal
sumly to the i;oi!er to acco!:jgany mercury enission data colLected
for the boiler.
?'he analysis of c!:e coai tor mercury content
s!~ali be conducted using appropriate AS38 Me~kods as specified in
35
IAC Part 225.
Snte:
':;his per:?i::
does r:oz affect the recordkeeping reqiireme~ts
contained in tl?e exlstirq permits for .he source.
1.9-2
3ecords for Conzrol Lievices axd Control Zcfii:~y~nr~z
-.
e
?rrni:cee si~ali :rai:!Car
tie
fo?.o!;i1g
. .
records for t!:e *lev.:
baghouse, scrubber, and sorbenr irrjection sysce:ns
rz:;
tile afiecced
.
DnL~ezi;:
..
<I
.
I
I;iigs Lor ti!e Saghouse System
.
An operazing 1.og or oi:~er records for :he baghojse syszen
that, at a :r~~;nirriii!:::
(1)
iiientif~er ~i;e trigger for bag
c::eacing, e.g., nanliai, ziner, or pressure drop; (2)
ider~tifies each perioi? ishen a Gxic was in operation and
che bagho~se was noE bei;:g opera:eii or war r:ot operatirig
elieciiveiy;
(3)
Identifies eaci; period :,,kec any baghouse
noduie(s) have been :aken out of regular scrvice, with
idencification of :he noduleis) and expianation; and iCi
Specificaliy docii!ce;;cs the implcr~ecracion of the
operating
procedlres relared to rhe bagkoise that arc
required to be o r a r e ociler~ise imp-enenied
.
.
pursuant io
Condition 1.6(a).
a.
Maintenance and repair log or o:her records for che
baqihocse syscen that, at a !ninimun:
(I)
LLsr the
ac~ivit~es
perforaed, with date and doscriprioc, and
(2)
Specifically cioc,~rne~r
the rainter.a!ice ar.d 2-epair
actiuit:es related
:o
tke baghouse the: are req-ired
io be or are ocharw~st yrrtoined purs:lanr co
Cocdition
l.G(a)
, .
LL.
Logs ior ibe Scrubber Syster
A.
An operating log or other recor-cis for the scl-~hber
systerr; that, ac a .~iaimux
(11
i6er:tifji eaci; per;od of
cise wte?. rhe affected Unit ,was r: operntio?: a:ld
associazed scrabber
was
ro: beiccr
..
onerated
.
or was xo:
operating effecr5vel y, arc!
(2)
specifically document
-/.
,r,e irrplementa:l.on ot tke operatizg prroced:ires
-i.lrrod fo che scrubber char are required ro be or
are
otl?erl>:ise ircg?enel~ted pnrsilal-t co Cor!dLtio:i
I.6ibI
9.
Xainrerance acd repair log or oi1:er records for the
sysze? fbei, at a mirims: ili lis: the acCivitieS
performed, wick dace a:?< description, and (Zi
s~eeifically r3oci:joeui the rcainterance and repair
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
...
act;vic:e!; related co scriibber chat arc required Lo
be
or are otherwise performed pxsuartt to Conditior.
1.61bj.
1x1.
...
Logs for che Sorbent Injection Syscem
A. .4n operating log or ocher records for
2".
ssysiern that, ai
a
iiir:~:. (1) identify ;he sorbent tilac is being ..]see,
Lhe setcing(s) for sorhent injectior raze a-6 each period
of time
*.,+hen an affected boiler was in operation and the
system was also
bei.g operated, acd
!2i
specifical:~
docinenls :t!e jmplenenration of tke operaring p-ocedxres
related to cne sorbent injection that are required to be
or are otherwise
iilpiene:r:eil piirsiiart to Condition
1.Gici..
I?.
1Eainzeranc.e a::d repair 104 or other records for the
Sy'stez: thai,
a:
a minimum, list chc activiiies
performed, with date and descriptioi.
3.
PI.:
Eirissioi: Coritrol Pian.".icy
-.
Tile foilowlry iecorc!s reiiiteu to tie procer1i;rrs a::d
praczices for conirol of
PH
enissror:~ from tke a'feczec;
hoi 1e1-s:
A.
A record, wtich shall be kept .up :a bece, j.de:-.,"
.,-,yinc,
. -.
che speciilc operatlrg prljcedlrev ar:c -ai:l~e;!si:ce
sractices iinc?.~:di:-.g 2rocedsres and practices
specltically reia:ed to scartugs and
naifunc~ioc/brea:cdo.;.n
incicients) cilrrenl:~:, being
ir~.?le-ient,ed by :he Permi:tee for che aiiec:ed holler
and Unii and associated
P?:
con'lrol ecpiprert to
sntisfv Condiciocs L.
6
(a1 .
These procedures ard
practices are referred to as t.0~
''P2.Z
Conzrol ?Ian" in
~kis perr.ic.
a.
i.ccompar~ying rbis record, rhe Permittee shail
maintain a 6knonstrat:on showing tha~ rhe a!?ove
Pt<
Cortroi ?la:, tuliills t:le reqxirernenis of Coi?i.itioi?'i
i.6ia:.
. .
11. Copies of :he records required
by
Conditions
1.9-2
(b) (i)
shall he si:bni:=ed
;:2e
Illinois
SPA
upon requesc.
is;. 7..ccolnpanying r?:e records required by Condiciocs 1.9-
2(b1 111, a file conraining a ci?:>y oL all correspolderce
azld
other wriz-ec mazerial exchanged <.with VSaPA ttac. addresses
CI:e procedures and prac:i(:e:;
c.kar.
~.tis:
be <~xple~,ence6
plrsLanL co E'ari~raplls 83,
84
an6 87 of rile Decree. This
Zi'
. .
.:e siari be retained for at least ::?ree ,years after the
perrazert sh-~zdoi;.:~ of the affected Slit.
"
-. .
Sgeciiic Reciircis lor
:):r
Sor-bent ii..ji?rr:ior Sysrem
~.
n~rizg :.he period before rccoranecping is zequired for usage of
sorbenr pursuacc ro 35 LAC ?art 225, the usage of sorbent (ibsi
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
Page
9
and average sorben:, iniection rate iibs:opcrat.ing houri, on a
n:ontilli/ basis.
Note:
This peri-it does no: affecr tile recordkeeping reyuireirents for
the existing
concro: system(s) chat are conzained in cke existing
pernits for the source.
1.9-3
Other Racurdkeeyirg Reqcirenents
a.
S:.l.-nary Records Relaced to the
P:.!
Corr-rol ?Ian
The ?ernittee shail mainraic che follo-.":ir!g records for eac:?
inciclent when applicabie actior!!d roqliired pcrsrrant
Lo
the PI,:
Concrol Plan were roc taken for aiecced boiler or :jait:
-.
-5-
iL.e date of tile iilcitient
ii.
A description ot the incidens, inclucling the rerjl::rerl
accior(s) chat were noc caken; ocher actions or ioitigarion
measures that were iaken,
IZ
. -
any;
acd the likely
corisecpei:ees of the i~cidenrs
as
related ro emissions.
. , .
111. Tne tine ac and mears by -~y::i,ck tihe incicienc was idertiiied
...
Tie length
of
t:?.n~e after tile incident :+as ider.tif ed before
required
actionls) were taken or were no longer requireci
and an explanation
why
tills tirrie
was
riot shorter. including
a iiisc~lssion of the ci:cir.g of any ni:igarion inensures :hat
-ere ia:<en for ti12 inciCieI::.
L.
.
The escinared total d-~racioi? of the incicisnt. i.e., :I?@
. .
toea- ienych o: tixe i;;a; :he nf:ecteC boiler ran wi::?ouc
tSe required actionis) beir.0 taken.
v.1.
A discussion of the probable cause ot the
'.~;clCie-r
3rd
i~y
preventative measures rake?.
...
. ,
fi
x
discussioc wheiher ai:y
applrcable Pi4 exissioi? s:aniards
. .
or
.ir:nrts, as addressed by Co:idrcioz~
3
1.4 01- 1.6, may
have been violated, either during or as a resuit
of
~iie
inciclcnt, ,:with supporting ex?la:!a:ic,:~
D.
Records Xelated so Mercury Emissions
1.
?he Permitree shail comply
..dizh
all applicable
recaj-dkeepi.:~g reyuirei~errcs of 35 IAC Fari
231
re!ated
tc
coI:rrol of nercury emissions
frorf!
tte affected boiler .
.
. .
3urir.g cke period hefc;re the Pet--.ittee is recjuirrd to
.
.
co!~duci
nL.eccec
---
-
.
mor.itari;:g
.
noiier pursuant
for tke
co
inerecry
35 TRC
emlss:ons
Part 225,
of the
Pecxizree
shail i-aintain records of emission daca
tor-
mercury
coLlecrec! for ci).e affecred boiler by :he Pern!ic:ee,
irc:udiriy eniss;ons i~ricrograms per
czbic
meter, pouncis per
P'our, or pounds per :rillion Bt::!
and control efficiency for
..=.
nr.reren: nodes of operation of :he
boilor
and sorbenc
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
irjcction system, with Ldentifrcation and description of
-
-:?e
+.
mode of operations.
i.i0-1 iepo?:ting Reqiireicerrs
-
Reporting ot Deviations
For the
affeceed boiler, the ?errnictee shall promptly nocify the
iiiirois E?A of devia:io:ls fro I: iees as folims
At a mininui-, zhese notificatiors shall inclucie a descripc:on of
si:ch devia:ioi:s, incli~ding r.?he:i.er they occurred cklring scartGp
or rna?funcrion;breakdown, and
a
discussion of t!!e possible cause
of
ssch deviarions, any corrective ac~iocs and azy prevectaiive
rceasures taken.
-.
:rrmediare iloillf Lcarion for a dcviacion from recjuire~nenrs
relared to
Pi'!
ecissions if the dev'iation is accom:>anied by
-
L.,e
-
iailure of zhrne or more compartments in the hanhozse
sys
T
e.3
.
.
,
.
.
Notification with
:he
c~iiarterly reports require:i
l?y
Condiiloc i. 13-2lai for deviations not addressed above.
. .
:!:c!uding deviatiors <ro:ii otilez applic;.'bli: re?:-.rer.e!:cs,
e.g., work !?rac;l.cr recwire:::en:s, reqjlred Gpera:i:iq
p:-ocedures, required raintenance pracflces,
a-d
recordkeeping requirenec;~.
b. Periodic Reporring of Deviaiiorls
-L
i;:,:
rpiarierly reports req;ireci by Cor?d!.tion I.10-Z(a1 shall
irclr;de ci-e :ollo->iny inforicatioc for the aifected bolLer re:a',ed
to devratiocs fron; pernit requirerents durixg t3e quarrer.
A. A is
0
a irscances of deviations thar have iieec
reported in cri:i::g tn ihe liii!?i-i(s
EPA
as orovided
b-
Y
Co~:dicir?n 1
.I.Ci-lia) ii)
,
including identiflcatlo:: 05 e-
ail.
.'*
s..c:)
' '.."
~i,..L;ei:
;
i!u~:ifica:ion or report. For this purpose, tke
Perrnirtee need 1'0: res~bmit copies of these pmvious
?orificatloas or reporis hut may elect to supplernerc such
naterial.
.
. .
Detailed ir?forr:.a:.ior, as required by Condizion 1
.1.0
1 (a (2, for
all
0-b.
-;.er deviaziors.
Toce:
'rkis
pernit does rot affect :i-e rec!uire!cer';s tor reportirly of
rievi.ario:ls contairleii
ir: c?:i?
ex-ist?:~~
permiis fo:-
:he
sorrce.
1.10-2
Repor:!.zc Rzquirenerts
-
Feriodrc Deyor:inq
a.
The ?ernittee shall ssbnjt q;ar:erl;~ reporcs to the ;:.!.innis
l:P&..
. .. ,
. .
These reports sna~- rncl~de a s:irirr-ry
o?
1r.fOt-r.3::.01-,
recorded d~,rirg the quarter pirsuanc to Condriiozs 1.9-?(a)
and ibi.
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
,
l
i
These reports shall i::c?:~cle the informacron for the
affected boiler
relazed cc deviations during the qi:arter
specified
by
Co-ditio~ 1.10-l(b1
rlr.
. . .
m.
.nese reports shall be siil>miLted aithlr! 45 days after ::?e
end of each calendar quarter. For example, the q-arterly
regrt for the first quarter, i.e., January, February and
Xarcii, skai? be s~lm~tted by Nay
ii
h.
The Permittee stall conply with all applicable reporting
repuirernencs of 35
1.X
Part 225 relared to conzrol of nercury
emissions from the affected boiler.
Note:
This pernit does not aLfecC the rer;:itrenen;s for cjcar-terly
repor~i::g contained Ln the existing perrirs for t5e sozrce.
l.li Aurhorlza;ion for Operatioc
The
Permiicee nay operate the affected boiler with the new bag:?ouse,
scrubber, and sorhe~t injection systems under tnis constrvction perrit
u~til such time as final action is taken to address tkse systers in
tte CAA?? permit for rhe source provided rhat rle ?er~ittee subxits an
an-roprlate
.
i--
cip:i:icaL;oi. for CAA2P per-iir, whlc:i ir.i:orpcra:es
net:,
rec.:--er:ents
neg;nning
.
iu~~
.
operations
establisked
of the
by
affeczed
this gernit
boiler
!.witkin
wich
one
these
year
~.~~scer.s.
1355
d+ysl of
P:ease noce t2ac this pernii does not address req.~irernents of
ik
Coocent
3ecree for eilisslor!~; of r.iiragen oxides
(T0,l.
This is becajse
this
perrit
does cot address any c>.anges to coz:rol eq~ianent for 89, enissions.
If you have ai..y quesziors coricernirg this pernit, please contact Knj Patel
o:-
chr;
-,Lopher
--
Rorraine at
?:7/782-i1?.3.
Sdl.,;in
C.
Bakourski,
P.
B.
Actlng Mar'ager, perniir Seciion
D:
.wLs1on
..2
of Air lollution Concrol
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
srRr.r
OF ciiimis
EN?i!RONMENTAL PRCIlECTiON AGENCY
DIVISION OF
A!R
POLLUTION '30Nl~R01
P. 0. BOX 19ZrOB
SPRI?.IGFIELO, iL.!.INOIS 52734-3506
-.
July
1.
1985
The Illir~ois Environmental Prnte~~tioi:
Ac! (I!liiioiri Revised statute^, Chapter 111-li2, Section 1039) autI%orizea the
Environmsntai Protection Agency to impose coiidition on perinits whicii it issuea.
The folloiviny cortditions are applicable uiiless su~peraeded
by
special conditionisj.
1.
Utile~s this pr:rn?it has been extended or it has been voided by a nevili. Issued permit, this permit will expire one
year from the
date of issunace. unless a continuous prograi;~ of ronstri-iction or development oil tiiis project has
started by such t.irne.
2,
The construction or d~vc!opmerit covered by this permit shell Be done in compiiance with applicable provisions of
the lliinois Environmr!nlal Prntoct~aii Act iind Regulations adopted by the Illinnis Poiiutiori Control Board.
3,
'i'ilere shiiil he rio deviutii!ils froirk tile approrvild piacs and specifications uriiess a written request for il~odificetion,
aiong wi1.h
p!ms
and si:ri.ificritions
as
required, shaii have beon suhmitted to the Agency and a supplemental
written pcrrnit is.9ued.
4.
Tho peritritt.ee siiali allow any duly sutllorized iigent. of tile Agcncy upon the presentation of credentials, at
renanntibie trmcs:
a.
to enti:i. the permiitce's property where zictua! or poter;iial effluent, ctnission or noise sources are located or
where any
:i;:iivity is to he c~inducied pursnsnt to this permit,
1.1.
1.;
iiave
access
it, and to
cop?
riny records required to
be
kepi under the terms and conditions of this permit,
r:.
to inspect, inc!i:ding during
any
iiiriirs of o~eralii>n
of eqiiipmeni coi~strut:ted or operated undor this permit,
i;uch eqilipi.~e:it nr:d any eilnipmcnl vrcjuire<l to
bi:
kept, iiscd, operated, calibrated and maintained under this
permi?.
i
tt~
obtairi and reri:iiie sarup!es of' any diicliargc or omissions of polluiants; and
c.
!o
ei!ri;r rind uii!izn
;I?!>.
pliolograpiiic. r~cording. testing: rr:oniioiing or other equipment for the purpose of
pre~crsii~g,
ieqrri~g, rnoi~itoring, or raccrriing iiny activity, dioclr;il.ge, or ernission authurizi:d by this permit.
5.
'Xi,i. isiiuilni~c
of
l,l,is ;n:r~"it,:
a.
sirall iiot b~ considei~d as in any nianncr ;~ffecting ihe title of the prt?mises upon which the ;:ermitted
f:iciliiies are
Lii
ile !oc~i:~rti.
I>.
ilocs riot r.t>icnsc ti:^ pcrinitcec :i.oiii ;iny lia:>ility for iiainayo inpern:iir or propc!i.ty caused hy or resulting from
the> ci;nairiic~ion, rr!ainten:ince. or oper;irit>n of
he
proposed Faciirties,
c
dope ilot ralc~?.;e the perrnitrce from cornplianec with otirer cipplicahie statutes and regulations of the ZJnited
Siacs, of the State of Illinois,
cir
witb applicable local inwa, ordii:ances and reguiationn,
d,
does not tdkc il:to conii&~ruiion or attest to tile sir?rctiiral stability of any unite or parts of the project, and
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
c.
in no manner implies or suggests that the Agency (or its officers, sgento
or
snployrees) assumes any liability>
directly or indirectly, for any
108s
due to dcmage, instel!ation, maintenance, sr opsition of
the
proposed
equipment or l'acility.
6
a.
Unless a joint conutruction/operetion permit hsu been issued, a permit For operation shail be obtained From
the Agency before the
equipmsni covered by this permit ia placed into oi;eratica.
b,
For purposes of shakedown and testing, unleso ot'herwiae specifieri
by
a speciiil permit co~dition, the equip-
ment
covered under this permit may
be
operated for a period not to exceed thirty
(301
days.
7.
'rhe Agency may file a complaint with the Board For modificatien, suspension or renccetioi? of a permit:
a.
upon discovery that the permit application contained misrepresentations, misin~oormntion or false acatements
or that all relevant fects were not disclosed, or
b.
upon finding that any standard or special conditions have been violstrd, o:
c.
upon any violations of
tile Environrnenial Protection Act or any regulation effective thereunder as a result of'
the
construction or development authorized by this permit.
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
DIRECTORY
E:i',!i2D?ib!E?iTAL
PROTECTION
AGENCY
BLl7EAU OF AIR
For assistance in preparing a permit
application contact the Permit
Section.
11 iir!ois Environmental Pr~tection Agency
Division of Air Pollution Control
Permit Section
1021
N. Grand Ave
E.
l3.o.Box 19506
Springfield, Illinois 62794
or a regional office of the
Field Operations Section.
The
regional offices and their
areas of responsibility are
sho3wn on the map.
The
addresses
and
telephone
nunihe-rs of the regional
offices are as follows:
Illinois EPA
Rc-gion
1
Bureau of air, FOS
9511 West Harrison
Des Plaines, Illinois 60016
847P294-4000
Illinois EPA
P,e_.cion 2
5415 >iorth University
Peoria, Illinois 61614
309/693-5463
Illinois EPA
Region
3
2009 Mall Street
Collinsville, Illinois 62234
6181346-5120
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *
CERTIFICATE OF SERVICE
I, the undersigned, certify that on this 16"' day of May, 2007, I have served electronically
the attached
APPEARANCES OF KATHLEEN C. BASSI, STEPHEN J. BONEBRAKE,
ANDREW
N. SAWULA, and SHELDON A. ZABEL ON BEHALF OF DYNEGY
MIDWEST GENERATION, INC. (HAVANA POWER STATION) and SALLY CARTER
ON BEHALF OF THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY AND
JOINT REQUEST
FOR NINETY DAY EXTENSION OF APPEAL PERIOD,
upon the
following persons:
John
T. Therriault, Assistant Clerk
Sally Carter
Illinois Pollution Control Board
Division of Legal Counsel
James
R. Thompson Center
Illinois Environmental Protection Agency
Suite
1 1-500
102 1 North Grand Avenue, East
100 West Randolph
P.O. Box 19276
Chicago, Illinois 60601
Springfield; Illinois 62794-9276
(PAPER SERVICE WAIVED)
/s/
Kathleen C. Bassi
Kathleen C. Bassi
SCHIFF
HARDIN LLP
Attorneys for Dynegy Midwest Generation, Inc.
Sheldon A.
Zabel
Kathleen C. Bassi
Stephen
J. Bonebrake
Andrew N.
Sawula
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois 60606
312-258-5567
FAX: 312-258-5600
Electronic Filing, Received, Clerk's Office, May 16, 2007
* * * * * * PCB 2007-115 * * * * * *