1. page 1

 
ILLINOIS POLLUTION CONTROL BOARD
November 2, 2006
CELOZZI-ETTLESON CHEVROLET, INC, )
Petitioner,
)
V .
)
PCB 07-31
(UST Appeal)
ILLINOIS ENVIRONMENTAL
)
(90-Day Extension)
PROTECTION AGENCY,
)
Respondent .
)
ORDER OF THE BOARD (by G.T. Girard) :
On October 25, 2006, the parties timely filed a joint notice to extend the 35-day period
within which Celozzi-Ettleson Chevrolet, Inc . may appeal a September 21, 2006 determination
of the Illinois Environmental Protection Agency (Agency) . See
415 ILCS 5/40(a)(1) (2004)
; 35
Ill. Adm. Code 105 .402, 105
.406
. The Agency approved the Corrective Action Plan, but
rejected the associated budget on the grounds that some activities were in excess of those
necessary to meet minimum requirements. The leaking underground petroleum storage tank
facility is located atl55 East Roosevelt Road, Elmhurst, DuPage County .
The Board extends the appeal period until January 28, 2007 (125 days after the
September 25, 2006 petition receipt date), as the parties request
.
See
415 ILCS 5/40(a)(1)
(2004) ; 35 Ill . Adm. Code 105 .406. If Celozzi-Ettleson Chevrolet, Inc fails to file an appeal on
or before that date, the Board will dismiss this case and close the docket .
IT IS SO ORDERED .
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on November 2, 2006, by a vote of 4-0
.
Dorothy M
. Gunn, Clerk
Illinois Pollution Control Board

Back to top