ILLINOIS POLLUTION CONTROL BOARD
    July 6, 2006
    DYNEGY MIDWEST GENERATION, INC.
    (VERMILION POWER STATION),
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 06-194
    (Air Permit Appeal)
    (90-Day Extension)
    ORDER OF THE BOARD (by G.T. Girard):
    On June 29, 2006, the parties timely filed a joint notice to extend the 35-day period
    within which Dynegy Midwest Generation, Inc. (Dynegy Midwest Generation) may appeal a
    May 30, 2006 determination of the Illinois Environmental Protection Agency (Agency).
    See
    415
    ILCS 5/40(a)(1) (2004); 35 Ill. Adm. Code 105.206(c), 105.208(a), (c). The Agency issued an
    air permit, with modifications, for construction of a baghouse and sorbent injection system for
    the Units 1 and 2 boilers at Dynegy Midwest Generation’s power station at Oakwood, Vermilion
    County.
    The Board extends the appeal period until October 3, 2006, as the parties request.
    See
    415 ILCS 5/40(a)(1) (2004); 35 Ill. Adm. Code 105.406. If Dynegy Midwest Generation fails to
    file an appeal on or before that date, the Board will dismiss this case and close the docket.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on July 6, 2006, by a vote of 4-0.
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board