BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
APR 1 7 2006
ADMINISTRATIVE RECORD
The Respondent, Illinois Environmental Protection Agency ("Illinois EPA"), by
and through its attorneys in accordance with the Illinois Pollution Control Board's
("Board) Order of February 16, 2006, files its Administrative Record ("Administrative
Record") in this cause .
Acting in accordance with its authority under the CAAPP provisions of the
Illinois Environmental Protection Act (hereinafter "Act"), 415 ILCS 5/39.5(2004), the
Illinois EPA issued a CAAPP permit to Dynegy Midwest Generation, Inc
. ("Dynegy") on
September 29, 2005
. The permit authorized the operation of an electrical power
generation facility known as the Havana Power Station
. The facility is located at 15260
North State Route 78 in Havana, Illinois
. On November 3, 2005, Petitioner filed a
petition before the Board challenging certain permit conditions contained within the
Clean Air Act Permit Program ("CAAPP") permit issued by the Illinois EPA
.
In accordance with the Board's February 16, 2006, Order, a hard copy of the
Administrative Record and four copies of the Administrative Record on compact discs
are filed with the Board . The Administrative Record consists of, among other things,
1
OF THE STATE OF ILLINOIS
Pollution
STATE OF ILLINOIS
DYNEGY MIDWEST GENERATION, INC .
)
Control
Board
(HAVANA POWER STATION),
)
Petitioner,
)
v.
)
PCB 2006-71
(CAAPP Permit Appeal)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
)
Dynegy's permit application materials, various draft permits issued for public comment,
correspondence between the Illinois EPA and both Dynegy and the United States
Environmental Protection Agency, public comments received during the multiple public
comment periods, various construction and operating permits issued to Dynegy, internal
agency memorandums, and miscellaneous general reference materials .
Given the considerable amount of paginated materials and the resources required
to provide the Administrative Record to the Board and opposing counsel, the Illinois EPA
generally did not copy duplicative materials (e.g., general reference and Electric Energy -
AUGI model documents) for each of the twenty-one records for the related CAAPP
appeals. As the General Reference Material is applicable to all twenty-two appeals, the
Illinois EPA has provided one hard copy of the General Reference Materials and four
copies of the General Reference Materials on compact discs with the Board for all the
related appeals. These documents are listed at the end of this Administrative Record
under the heading "General Materials ."
Contents of the Administrative Record
Miscellaneous documents pertaining to Draft Permit and Public Notice . [Pages 1-1911
Preliminary Responsiveness Summary, dated August 15, 2005
. [Pages 192-2351
Proposed Permit (USEPA Review) Revised Proposed Permit, dated August 2005
.
[Pages 236-4511
Proposed Permit (USEPA Review) Proposed CAAPP Permit, dated April 4, 2003
.
[Pages 452-6141
Extension Denial Letter notifying that the comments must be postmarked by August 1,
2005 . [Page 6151
Coal-Fired CAAPP Repreproposed Notification. [Page 6161
In the United States District Court for the Southern District of Illinois, United States of
America and the State of Illinois, American Bottom Conservancy, Health and
Environmental Justice-St. Louis, Inc ., Illinois Stewardship Alliance, and Prairie State
Rivers Newtwork v
. Illinois Power Company and Dynegy Midwest Generation, Inc .,
Civil Action No
. 00-833-MJR, Consent Decree and Order. [Pages 617-7091
Draft Revised Proposed Permit, dated July 2005 .
[Pages 710-924]
Coal-Fired Revised Proposed CAAPP Notification. [Page 925]
Revised Proposed CAAPP Permit Draft, dated December 2004 . [Pages 926-10861
July 19, 2005, Letter . [Pages 1087-10921
August 15, 2005, Letter . [Pages 1093-1098]
Final Permit and Calculation Sheet, dated September 2005 . [Pages
1099-1317]
September 29, 2005, Letter .
[Pages 1318-1324]
Final Responsiveness Summary . [Pages 1325-1368]
Letter from Aric D
. Diericx, Air Group Leader, Illinois Power to Donald Sutton,
P.E.,
Manager Permit Section, Illinois EPA, providing Initial CAAPP Application, dated
September 6, 1995, and attached application and Letter from Natalie Locke to Donald
Sutton revising responsible official, dated October 12, 2002
. [Pages 1369-1718]
125 804 AAB 03 95 09 0053 - Dynegy Midwest Generation, Inc. [Pages 1719-1925]
Dynegy Midwest Generation, Inc . Unit Nameplate Ratings, undated. [Page 1719]
Compliance Certification, dated received September 7, 1995 . [Pages
1720-1726]
Fee Determination for CAAPP Permit, dated received September 7, 1995
. [Pages
1727-17291
Application for CAAPP Permit, dated received September 7, 1995
. [Pages 1730-
17341
CAAPP Application Completeness Determination and Source Fee Determination,
dated October 12, 1995 . [Pages
1735-1740]
Letter from Aric Diericx to Donald Sutton regarding Reconsideration for Fee
Amount, dated October 19, 1995, and attachment .
[Pages 1741-17441
3
Cost Estimates for NOx Emissions Reduction for All Coal-Fired Utility Boilers,
date updated 3/5/97 . [Page 1745]
Letter from Rick Diericx to Illinois EPA regarding NOx Control Project - Havana
Power Station, dated June 26, 2001 . [Pages 1746-1747]
Power Plant Initiative - February 2003, dated 2/3/03 . [Pages 1748-1749]
Memorandum from David Kolaz to Renee Cipriano regarding Approval for
Public Hearings for Coal-Fired Power Plant Permits, dated June 2, 2003 . [Pages
1750-17511
Email from Jim Ross, Acting Permit Section Manager, Illinois EPA to Stacey
Coburn, USEPA, regarding comments on CAAPP permits, dated 7/10/03 9 :10
AM. [Page 17521
Letter from Rick Diericx to Jim Ross, Acting Manager - Air Permit Section,
regarding Subpart W Budget Permit Applications, dated July 29, 2003, and
attachment . [Pages 1753-1755]
Letter from Rick Diericx to Jim Ross regarding Subpart V Request for
Authorization for NOx Averaging for EGUs, dated July 30, 2003, and attachment .
[Pages 1756-1758]
Information concerning Greenhouse Gases, dated 7/31/03 . [Pages 1759-17601
Handwritten notes of Manish Patel regarding Utility CAAPP meeting with
Ameren/Dynegy, dated 9/18/03 . 10 :30 AM. [Pages 1761-1762]
Handwritten notes of Laurel Kroack regarding Title V permits, dated November
21, 2003 . [Pages 1763-17641
Facsimile from Keith Harley to Julie Armitage, dated November 24, 2003
.
[Pages 1765-17701
Note and attachment from Chris Romaine to Dave Kolaz, dated 12/10/03
. [Pages
1771-1778]
Email from Bruce Nilles to Dave Kolaz, dated 2/3/2004, 9
:54 AM, with
handwritten notes . [Pages 1779-1780]
Email from Bruce Nilles to Dave Kolaz, dated 2/3/2004, 9 :54 AM. [Page 1781]
Email from Bruce Nilles to Dave Kolaz, dated 2/3/2004, 9
:54 AM with
handwritten notes of Laurel Kroack . [Page 1782]
4
Email from Bruce Nilles to Dave Kolaz, dated 2/3/2004, 9
:54 AM with
handwritten notes of Chris Romaine . [Pages 1783-17891
Handwritten notes of Laurel Kroack beginning "Enviros & Title V Power Plants,"
dated 2/3/2004. [Pages 1790-17911
Memorandum from Laurel Kroack to Renee Cipriano regarding Title V permits
for coal-fired power plants, including Midwest Generation, dated February 4,
2004. [Pages 1792-1795]
Email from Chris Romaine to Natalie Locke and Steve Whitworth, dated
2/19/2004, 2 :41 PM. [Page 17961
Handwritten notes of Manish Patel regarding meeting with USEPA on coal-fired
power plant CAAPPs dated 2/24/04, 1 :30 PM. [Page 17971
Handwritten notes of Manish Patel regarding conference call with coal-utility
facilities, dated 2/25/04, 1 :30 PM . [Page 17981
Memorandum from David Kolaz to Renee Cipriano regarding status and time line
for Title V Power Plant Issuance, dated April 28, 2004 . [Pages 1799-1800]
Handwritten notes of Laurel Kroack regarding meeting with USEPA concerning
power plant permits, dated 5/6/04 . [Pages 1801-18031
Facsimile from Bill Constantelos to Dave Kolaz, dated May 10, 2004, and
attached letter to Renee Cipriano from Fred McCluskey, dated May 10, 2004.
[Pages 1804-18271
Memorandum from Laurel Kroack to Cheryl Newton regarding Utility Permit
Issuance Timeline, dated June 1, 2004 . [Page 18281
Facsimile from Chris Romaine to Stacey Coburn, USEPA, Region V, dated
6/29/04, providing facsimile from Basil Constantelos to Dave Kolaz, dated May
10, 2004, and attachments . [Pages 1829-1842]
Facsimile cover sheet from Chris Romaine to Stacey Coburn, dated 6/29/04
.
[Page 18431
Email from Chris Romaine to John Cashman, Ross Cooper, Kunj Patel and
Manish Patel, dated 7/24/04, 5
:08 AM, with handwritten notes from Chris
Romaine. [Page 1844]
Handwritten notes of Laurel Kroack regarding Title V, dated 8/30/04
. [Pages
1845-1847]
5
Letter from Bharat Mathur, Acting Regional Administrator, USEPA, to Renee
Cipriano, Illinois EPA, dated December 2, 2004. [Pages 1848-1850]
Email from Chris Romaine to Manish Patel regarding Power Plant CAAPP
Permits, dated 12/7/2004, 4:14 AM, and handwritten notes of Manish Patel .
[Page 1851]
Letter from American Bottom Conservancy, et al . to Renee Cipriano regarding
procedure to issue Title V permits for coal-fired power plants, dated January 6,
2005. [Pages 1852-1853]
Letter from Donald Sutton to American Bottom Conservancy, et al ., dated
January 13, 2005,
responding to letter dated January
6, 2005
. [Pages 1854-18651
Letter from Laurel Kroack, Acting Chief, Bureau of Air, Illinois EPA, to Steve
Rothblat, USEPA, dated January 18, 2005 . [Pages 1866-1873]
Handwritten notes of Laurel Kroack regarding utility, title V, dated 1/26/05.
[Pages 1874-18751
Notes of Laurel Kroack regarding March 21, 2005, call with feds . [Pages 1876-
1877]
Notes of Julie Armitage regarding May 10, 2005, meeting with the feds . [Pages
1878-18831
List of Michael Reed, dated June 9, 2005 . [Page 1884]
Draft Instructions, dated June 23, 2005
.
[Pages 1885-1895]
Note and attachments from Michael Reed to Chris Romaine, dated July 17, 2005 .
(Pages1896-19071
Miscellaneous documents regarding request for extension of time to comment on
the Preliminary Responsiveness Summary and Draft Revised Proposed Title V
Permits. [Pages 1908-19141
Handwritten notes of Michael Reed, dated August 1, 2005. [Pages 1915-19191
Email from Michael Reed to Julie Armitage regarding new permit condition for
22, dated 8/9/05, 9 :42 AM. [Page 19201
Notes of Michael Reed regarding feds conference call, dated September
16, 2005 .
[Pages 1921-19221
6
Email exchange between Chris Romaine and Rick Diericx concerning testing of
PM emissions, dated 9/20/05
.
[Pages 1923-1924]
Handwritten notes of Laurel Kroack, dated September 23, 2005 . [Page
19251
Model Permit Developments, Summer 2003 . (Pages 1926-20741
Miscellaneous Emails Relevant to Havanna
. [Pages
2075-30891
Miscellaneous Undated Notes of Illinois EPA Staff. [Pages 3090-31531
Miscellaneous Undated Documents Likely Generated by Illinois EPA . [Pages 3154-
32071
Miscellaneous Documents Supplied to USEPA . [Pages 3208-3384]
Miscellaneous Lists or Drafting Documents . [Pages
3385-36551
Miscellaneous Drafting Documents - Permits . [Pages 3656-43871
Miscellaneous Opacity Documents . [Pages 4388-4507]
FESOP NOx Averaging Permits . [Pages 4508-4511]
NSPS Worksheet . [Page 4512]
Construction Permits & Miscellaneous Operating Permits .
[Pages 4513-4556]
Documentation Relative to Proceedings Before the Administrator, USEPA. [Pages 4557-
4904]
Startups, Combustion Evaluations & Alternative Fuel Memorandums . [Pages 4905-
4912]
*
Memorandum from Michael T
. Reed, CAAPP Unit Manager, to Power Plant File
regarding Provisions Requiring Detailed Records of Startups After a Certain
Timeframe, dated September 23, 2005. [Pages 4905-4907]
Memorandum from Michael Reed to Power Plant File regarding Provisions
Requiring Combustion Evaluations, dated September 23, 2005 . [Pages 4908-
49091
Memorandum from Chris Romaine, Manager, Utility Unit to Power Plant File
regarding Provisions for Burning Materials Other Than Coal in Power Boilers,
dated September 28, 2005 . [Pages 4910-4912]
7
Comments specific to Havana
[Pages 4913-53181
Electronic mail from John M . Burke, Dynegy to Kunj Patel, Illinois EPA,
providing comments to Dynegy's Havana Power Station Title V Permit, dated
October 31, 2002, and attachment . [Pages 4913-49161
Electronic mail from John Burke to Kunj Patel providing Havana Draft CAAPP
Permit comments, dated April 16, 2003, and attachments .
(Pages 4917-49331
Letter from James Rogers, Law Clerk, and Bruce Nilles, Staff Attorney, Siera
Club, to Brad Frost, Illinois EPA, providing Comments on Dynegy Title V Permit
Application No
. 95090053, dated June 19, 2003, and attachments . [Pages 4934-
4943]
Letter from Natalie Lock to Brad Frost regarding Extension of Time for
Comments on Draft Public Notice CAAPP Permit Dynegy Midwest Generation -
Havana Power Station, dated June 20, 2003
. [Page 4944]
Letter from Natalie Locke to Brad Frost providing Comments on Draft Public
Notice CAAPP Permit, dated September 26, 2003, and attachments
. [Pages
4945-5104]
Letter from Rick Diericx to Charles Matoesian providing Comments on Draft
Public Notice CAAPP Permits, dated January 17, 2005, and attachments . [Pages
5105-53031
Letter from Rick Diericx to Charles Matoesian providing Comments on Draft
Public Notice CAAPP Permits, dated July 29, 2005, and attachments . [Pages
5304-53181
Comments Particular to Dynegy [Page 5319]
Letter from Charles Matoesian to Rick Diericx regarding Request for Extension
of Time for Commenting on Proposed Title V Permits Posted on July 19, 2005,
dated July 28, 2005 . [Page 5319]
General Comments [Pages 5320-62581
*
Comments of the Sierra Club and American Bottom Conservancy, Summer 2003 .
[Pages 5320-53581
Letter from Matthew J
. Dunn, Division Chief, Environmental
Enforcement/Asbestos Litigation Division, Illinois Attorney General's Office, to
Charles Matoesian regarding Coal Powered Generation Plants Title V Permit
Applications, dated September 29, 2003 . [Pages 5359-5373]
8
Email from Stacey Coburn to Chris Romaine regarding Enhanced coal-fired
boiler CAAPP permits, dated April 12, 2004, 4
:53 PM, and handwritten notes of
Manish Patel . [Pages
5374-53761
Email from Verna Owen to Mr. Holmstead, dated 12/14/2004 12
:09:23 PM.
[Pages 5377-5378]
Letter from Paula Becker Wheeler, Assistant Attorney General, Illinois Attorney
General's Office, to Charles Matoesian providing comments to Revised Proposed
CAAPP Permits for 22 Coal-Fired Power Plants, dated January 14, 2005, and
attachments
. [Pages 5379-57641
Letter from Keith Harley, Attorney at Law, Chicago Legal Clinic, Inc
., to Charles
Matoesian regarding Revised Proposed CAAPP Permits for Coal-Fired Power
Plants, dated January 14, 2005, and attachments
. [Pages 5765-6151]
Letter from Ann Alexander, Environmental Counsel to Attorney General Lisa
Madigan, to Charles Matoesian regarding Comments on draft revised proposed
CAAPP permits, dated August 1, 2005, and attachments
. [Pages 6152-6258]
Proceedings in the US District Court .
[Pages 6259-6300]
Title 1/ Title V MOU
[Pages 6301-6306]
November 12, 1981 USEPA Directive
[Pages 6307-63111
HPV Matrix Criteria Opacity [Pages 6312-6322]
White Paper [Pages 6323-6357]
White Paper 2 [Pages 6358-64101
Guidance : Statement of Basis
[Pages 6411-64131
Design of Flexible Air Permits
[Pages 6414-64691
September 28, 1982 Bennett Memorandum
[Pages 6470-6472]
February 15, 1983 Bennett Memorandum [Pages
6473-64761
Limiting PTE in New Source Permitting, June 13, 1989
[Pages 6477-64881
Startup, Shutdown Guidance : January 28, 1993
[Pages 6489-6491]
January 15, 1997, Title V Guidance
[Pages 6492-64981
9
USEPA Guidance Directed to Ohio EPA
[Pages
6499-65011
January 21, 1998 Fuel Flexibility Guidance
[Pages 6502-6512]
August 11, 1999 (September 20, 1999) Herman Memorandum
[Pages 6513-6532]
December 5, 2001, Schaeffer Memorandum
[Pages 6533-6534]
Miscellaneous Reference Material [Pages 6535-6536]
Fort James Camas Mill Petition
[Pages 6537-6579]
General Materials
Electric Energy-AUGI Model Documents
: [Pages 1-25361
Early Discussions with AUGI on Fugitives
[Page 1 ]
Model Permit Development Early Discussions with AUGI
[Pages 2-121
Early Discussion with AUGI Effect of Flow Rater (Load) on ESP Performance
[Pages
13-141
EEI -
June 25, 1997 [Pages 15-651
EEI - August 13, 1997
[Pages 66-80]
EEI - August 14, 1997 [Pages 81-82]
EEI- August 20, 1997 [Pages 83-911
EEI - September 9, 1997
[Pages 92-98]
EEI -
October 1997, Cover Letter and Preliminary Draft Permit
[Pages 99-160]
EEI -
October 27, 1997 [Pages 161-1621
EEI - December 8, 1997
[Pages 163-165]
EEI -
December 12, 1997 [Pages 166-1761
EEI -
December 17, 1997 [Pages 177-263]
EEI -
December 25, 1997 [Pages
264-3211
10
Late
1997 - Early 1998 Internal Drafting
[Pages
322-378]
EEI - January 9, 1998
[Pages 379-4441
EEI
- February 4, 1998
[Pages 445-4521
EEI - February
16, 1998 [Pages 453-512]
EEI - February 23, 1998
[Pages 513-5211
EEI -
February 24, 1998 [Pages
522-524]
EEI - February
26, 1998 [Pages 525-5271
EEI - February
27, 1998 [Pages 528-546]
EEI - March 1998
[Pages 547-566]
EEI -
April 1998 [Pages 567-580]
EEI - Sharing with
USEPA 1998 [Pages 581-6121
EEI -
May 4, 1998 [Pages 613-670]
EEI - June 26, 1998
[Pages 671-677]
EEI
- July 5, 1998 [Pages 678-716]
EEI - August
4, 1998 [Pages 717-773]
EEI - September
30, 1998 [Pages 774-829]
USEPA Comments September
1998 [Pages 830-851]
EEI
- December 28, 1998 [Pages 852-8591
EEI - May 11, 1999
[Pages 860-871]
EEI - May 12, 1999,
Draft to Notice? [Pages 872-966]
EEI - May
12, 1999 [Pages 967-972]
EEI - May
14, 1999 [Pages
973-10471
EEI - May 20, 1999
[Page 1048]
11
EEI - August 4, 1999 [Pages 1049-1052]
AUGI Comments Summer 1999 [Pages
1053-10671
EEI - March 17, 2002
[Pages 1068-11391
EEI
- May 10, 2002 [Page 1140]
EEI - July 2002
[Pages 1141-1225]
EEI - August 2002 [Page
12261
EEI
- September 2002 [Pages
1227-14101
EEI -
Draft to Notice September 2002 [Pages
1411-15051
EEI -
Public Comments October 2002 [Pages
1506-1514]
EEI - Exchange with USEPA November 2002
[Pages
1515-1519]
EEI - December
6, 2002 [Pages
1520-15211
EEI -
March 11 and 12, 2003
[Pages 1522-15241
EEI - April 2003
[Pages 1525-16311
EEI Tracked Changes for Preparation of October 2003 Proposed Permit
[Pages 1632-
1683]
EEI - Miscellaneous Emails
[Pages 1684-25141
AUGI Miscellaneous Notes
[Pages 2515-25361
Em ails
General Emails, 2002
[Pages 2537-25671
General Emails, 2003 [Pages
2568-3807]
General Emails, January 2004 -
May 31, 2004 [Pages
3808-4739]
General Emails, June 1, 2004
-
December 31, 2004 [Pages
4740-5906]
General Emails, 2005
[Pages
5907-71311
12
Miscellaneous Reference Documents :
Miscellaneous Cases Before the Administrator
- USEPA [Pages
7132-7483]
Compliance Assurance Monitoring Rule [Pages 7484-75971
Good Engineering Practices
[Page 75981
Electrostatic Precipitators [Pages 7599-7644]
Environmental Justice [Pages 7645-7649]
Information on Existing Plants
[Pages 7650-76601
Monitoring [Page 76611
Periodic Monitoring Guidance [Pages 7662-76941
Background Information on NSR Enforcement [Pages 7695-7876]
Public Hearing Reference Document/Folder
[Pages 7877-8157]
Miscellaneous Opacity Reports
[Pages 8158-90381
CWLP
[Pages 8158-8181]
Dynegy [Pages 8182-8202]
Electric
[Pages 8203-8248]
Miscellaneous [Pages 8249-8255]
Ameren [Pages 8256-8593]
Midwest Generation [Pages 8594-87781
Midwest Generation -
Old [Pages 8779-90381
Collins Opacity Report [Pages 9039-9113]
Miscellaneous Documents from Florida
[Pages 9114-91351
Miscellaneous Documents from Georgia
[Pages
9136-91761
Miscellaneous Documents from Indiana
[Pages 9177-91831
13
Miscellaneous Documents from Iowa [Pages
9184-9228]
Miscellaneous Documents from Kentucky [Pages 9229-92631
Miscellaneous Documents from Michigan
[Pages 9264-9298]
Miscellaneous Documents from Ohio [Pages 9299-93651
Miscellaneous Documents from Utah
[Pages 9366-9482[
Supersession and Credible Evidence Guidance
[Pages 9483-94861
Draft Title V Permit Review Guidelines [Pages 9487-9620]
Illinois Environmental Protection Agency
1021 North Grand Avenue East
P .O
. Box 19276
Springfield, Illinois 62794-9276
(217)782-5544
Respectfully submitted by,
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Sally
Carter
Assistant Counsel
14
V.
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOIS
DYNEGY MIDWEST GENERATION, INC
.
(HAVANA POWER STATION),
Petitioner,
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
To: Dorothy Gunn, Clerk
Illinois Pollution Control Board
100 West Randolph Street
Suite 11-500
Chicago, Illinois 60601
Bradley P . Halloran
Hearing Officer
Illinois Pollution Control Board
James R. Thompson Center
Suite 11-500
100 West Randolph Street
Chicago, Illinois 60601
PLEASE TAKE NOTICE that I have today filed with the Office of the Clerk of
the Illinois Pollution Control Board the ADMINISTRATIVE RECORD of the
Respondent, Illinois Environmental Protection Agency, a copy of which is herewith
served upon the assigned Hearing Office and the attorney for the Petitioner .
Respectfully submitted by,
Dated: April 14, 2006
Illinois Environmental Protection Agency
1021 North Grand Avenue East
P.O. Box 19276
Springfield, Illinois 62794-9276
NOTICE
PCB 2006-71
(CAAPP Permit Appeal)
Sheldon A. Zabel
Kathleen C
. Bassi
Stephen J . Bonebrake
Joshua R . More
Kavita M. Patel
Schiff Hardin, LLP
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois 60606
Sally rter
Assistant Counsel
RECEIVEDCLERK'S
OFFICE
APR 1 7 2006
CERTIFICATE OF SERVICE
Pollution
STATE OF
Control
ILLINOISBoard
I hereby certify that on the 14th
day of April 2006, I did send, via CMS Courier,
the following instrument entitled
ADMINISTRATIVE RECORD
to :
Dorothy Gunn, Clerk
Illinois Pollution Control Board
100 West Randolph Street
Suite 11-500
Chicago, Illinois 60601
I further hereby certify that on the 12`
h
day of April 2006, I did send, a true and correct
copy of the same foregoing instrument, by First Class Mail with postage thereon fully
paid and deposited into the possession of the United States Postal Service, to
:
ORIGINAL
Bradley P
. Halloran
Hearing Officer
Illinois Pollution Control Board
James R
. Thompson Center
Suite 11-500
100 West Randolph Street
Chicago, Illinois 60601
Sheldon A. Zabel
Kathleen C . Bassi
Stephen J
. Bonebrake
Joshua R. More
Kavita M. Patel
Schiff Hardin, LLP
6600 Sears Tower
233 South Wacker Drive
Chicago, Illinois 60606
Sally C er
Assistant Counsel