ORIGINAL
THE ILLINOIS POLLUTION CONTROL
E'IOARPCE
R
E
OFFICEI
V E D
PAUL and DONNA FREDRICKSON,
)
husband
and wife
JAN 1 7 2006
)
Complainants
)
Pollution
OControl
Board
v .
)
PCB 04-19
Jeff Grelyak,
)
Respondent .
)
NOTICE OF FILING
PLEASE TAKE NOTICE that I have today filed with the Office of the Clerk of the Pollution
Control Board Respondent's Motion to Postpone Hearing.
Said Motion is directed to Hearing
Officer Bradley P. Halloran .
CERTIFICATE OF SERVICE
I, the undersigned, certify that I have today served Respondent's Motion to Postpone Hearinq
to
the entities listed below by telefax to (312) 814-3669 and by placing said documents in
envelopes with proper postage affixed and by depositing said envelopes in a U .S. Postal
Service receptacle in Springfield, Illinois_ Said envelopes being adaressed to the following
:
Jeremy W . Shaw, Esq .
40 Brink Street
Crystal Lake, Illinois 60014
An additional copy of the document was included in the envelope addressed to the Clerk of the
PCB, which copy is to be given to Hearing Officer Halloran,
Date : 12 January 2006
G ge W . Tinkham,
attorney far Respondent
ARDC reg
. # 2836149
1119 S . 6°i Street
Springfield' . IL 62703
(217) 523-3300

 
Attorney for Respondent
:
George W
. Tinkham
1119 South
6th
Street
Springfield, IL 62703
(217) 523-8300
MOTION TO POSTPONE HEARING
COMES NOW, RESPONDENT JEFFREY S . GRELYAK, by his attorney George W
.
Tinkham, and moves Illinois Pollution Control Board Hearing Officer Bradley P . Halloran to
postpone the hearing in this matter now scheduled to be held on 25 January 2006 . In support of
this Motion, George Tinkha°n states as follows
:
1 . After numerous communications between Mr . Tinkham and Jeremy Shaw, attorney for
Complainant, it appears there is substantial potential for an agreement between the parties .
2 .
To work out an agreed resolution of this matter, additional draft proposals need to be
reviewed by the parties . Also, a face-to-face meeting is being planned
3
.
The details outlined in #2 above take time, and there is not enough time between now and
January 25ti'
both to engage in settlement efforts and to prepare for trial.
4 .
Jeremy Shaw has informed George Tinkham that he (Jeremy Shaw) does not oppose this
request to postpone the hearing
.
NOW, THEREFORE, RESPONDENT asks that the hearing now scheduled in this matter on 25
January 2006 be postponed until it is clear that all attempts at settlement have been exhausted
.
The parties should know by 31 January 2006 if they will settle or if this should go to trial .
Respectfully submitted,
Jeffrey S . Grelyak, Respondent
Date : 12 January 2006
By:
ORIGINAL
George%
Tinkham, his attorney
ARDC # 2836149
BEFORE THE ILLINOIS POLLUTION CONTROL
BOARD
RECEIVEOFFIC D
PAUL and DONNA FREDRICKSON,
)
JAN 1 7 2006
husband and wife
)
Complainants
)
STATE OF ILLINOIS
Pollution Control Board
V .
)
PCB 04-19
Jeff Grelyak,
)