ILLINOIS POLLUTION CONTROL BOARD
    June 16, 2005
     
    ROBERT BENNETT,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
     
     
     
    PCB
    05-208
    (UST
    Appeal)
    (90-Day
    Extension)
     
    ORDER OF THE BOARD (by J.P. Novak):
     
    On June 10, 2005, the parties timely filed a joint notice to extend the 35-day period
    within which Robert Bennett may appeal a May 9, 2005 determination of the Illinois
    Environmental Protection Agency (Agency).
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
    105.402, 105.406. The Agency rejected the high priority corrective action plan budget for
    Robert Bennett’s leaking underground petroleum storage tank facility located at 901 Sheridan
    Road, Winthrop Harbor, Lake County.
     
    The Board extends the appeal period until September 13, 2005, as the parties request.
    See
    415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Robert Bennett fails to file an
    appeal on or before that date, the Board will dismiss this case and close the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on June 16, 2005, by a vote of 5-0.
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board