ILLINOIS POLLUTION CONTROL BOARD
June 2, 2005
BASIC WIRE & CABLE,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB
05-198
(UST
Appeal)
(90-Day
Extension)
ORDER OF THE BOARD (by J.P. Novak):
On May 20, 2005, the parties timely filed a joint notice to extend the 35-day period
within which Basic Wire & Cable may appeal an April 11, 2005 determination of the Illinois
Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code
105.402, 105.406. Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed. 35 Ill. Adm. Code 101.300(b)(2), 105.404. The Agency rejected
the corrective action completion report for Basic Wire & Cable’s leaking underground petroleum
storage tank facility located at 3900 North Rockwell Street, Chicago, Cook County.
The Board extends the appeal period until August 17, 2005, as the parties request.
See
415 ILCS 5/40(a)(1) (2002); 35 Ill. Adm. Code 105.406. If Basic Wire & Cable fails to file an
appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on June 2, 2005, by a vote of 5-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board